Selectmen's Meeting - 8/11/26
Speakers are labeled SPEAKER_N. This transcript is machine-generated.
The hour now being 6:00, I call the
Barnstable Select Board meeting to
order. Will stand for the pledge.
Gary, you coming back up here?
>> [snorts]
[clears throat and cough]
>> We have a meeting.
>> Gary.
>> We have a meeting going on.
>> Relax.
Business.
You tell him what.
>> He's only 20%.
>> We take it easy.
>> [laughter]
>> Uh
Did everybody see payroll manifest?
Yep.
Okay.
There is a correction. It's not the
minutes of July 28th, it's the minutes
of August 4th, 2026.
Has everybody seen those
minutes from last week?
>> Yep.
I'll make a motion to approve the
minutes for August
when? 4th?
>> August 4th.
>> August 4th,
2026.
>> All right, I'll second.
>> Second.
>> All those in favor?
>> Aye.
>> We have three abatements.
Uh wetland permit for Harwich Road.
That was all That was all those five
stacks of paper in front of me.
Um
need a motion for the board to for the
chair to
sign those wetland permits.
>> Make a motion that the chair sign the
wetland permits on Harwich Road.
>> I'll second.
>> So everybody's aware, Archer Road,
that's for the culvert replacement.
That's the submittal of paperwork to DES
to get that process started
with
next summer
as a
projected date for replacement
of that.
We had
one elderly burial.
We did that one. And then
Did everybody see the grant
for or grants? There's two of them for
the PD.
There's a patrol grant and a radar
grant.
Uh
the patrol grant pays 100%.
And the radar grant pays 80%. The total
combined was $10,000.
$500.
The grant
Well, the the cost is there, so
It was the 4,000 $950
the radar grant.
>> Yes.
>> Was the the radar grant? Was that the
4,950?
I think
Just for those.
But that one pays 80% of that.
So the
>> Which one does?
>> You can turn that off if you need.
That fan.
>> The patrol pays 80%?
>> No, the patrol grant pays 100%.
>> Pays 100%?
>> [clears throat]
>> The 5,200 dollars.
That's what I figured.
Yep. So the 4,950 dollars is the radar
And the grant pays 80% of that.
Yes.
>> It's going to pay a total of 4,950
or 6600.
>> Right.
>> Yeah.
And
there is a
We need a motion
to submit
the grant paperwork.
>> Are these
Are we acting as one on these or Yes.
Doing separately?
Is it two separate applications or is it
>> Mhm, there should be two separate
applications for all the paperwork is
signed.
The board needs to make a motion to
apply for the highway safety grants.
Total grant, radar grant.
The select board in a majority vote
We are not We haven't accepted the
terms.
Or we need to Once we make the motion,
we need to accept the terms of the
highway safety grant as presented in the
amount of $5,200 and the amended grant
terms in the amount of $4,950
as presented in the grant agreement
amendments notice for the adjusted total
grant limitation of $10,150.
I'll just read this.
That's one.
It's all one grant.
Tipsy light.
27-1
>> We ended up
>> Does everybody understand that?
Just to make sure we're all on the same
page.
>> So, I'll make a motion
um
to sign the highway safety grant
application.
>> Right?
>> You're not the uh
highway safety grant yet.
>> The grant is signed.
>> And then we have to accept the uh
the amendment uh the agreement.
>> Vote to accept the terms of the highway
safety grant
as presented.
Who moves this?
>> So, I'll make a motion to uh accept the
terms
and the amount. Do you want the amount
in there?
>> Yeah, 5200
and 4950
and to sign the agreement amended notes
for a total of 10,150.
>> Okay.
>> I'll make a second.
>> I'll second that.
>> Jason seconds
>> Good.
>> Even though we just voted on that night.
I should have should have actually done
it now thinking about it. Should have
done it beforehand.
I know
Chief Fuller had already explained once
before what they were.
>> Um you might just explain
to the public again what they are real
quick.
>> Yeah, the patrol one.
>> Yeah, what they what the two grants are.
Um what it covers there.
Reasoning for them.
Come on up.
I'm going to make you come up.
>> Step right up, okay.
The first part of this
is the patrols which is covered.
And then the second part
It's all the patrols that that are
covered.
It's in two pieces so the money comes in
case we want to buy the equipment that
we want to get whatever that is.
>> Lidars for the cruisers.
But the paint
It's all wrapped in case of that that
person or the
equipment and then it pays the patrol
officers to be out on the road. So the
officer goes out for shifts that are
like three or four hours long.
>> It doesn't mean at times of days.
Usually when we have a lot of actual
in those areas of the times of the year
of the two of the grants, they just go
out and concentrate solely on stopping
cars.
>> Okay, so is that last? I mean you can
just do that up until the everybody is
>> We separate it into
two parts.
>> Okay. I'm just going to ask how many
years is it?
>> It's just one fiscal year.
>> Oh, one fiscal year.
I got you. Okay, got you.
>> So we
have three
>> Basically
>> This is the one that's between of the
controls,
the equipment for the lidars, and the
equipment for the AT&T that's out there.
>> So basically he's going to pay
100% for the equipment that we are using
utilizing the equipment such as the fire
department
and 80% of any kind of equipment that we
purchase for that
agency.
Everybody understand that?
>> So, is that
fully Is there a third grant? Is that
the one
>> So, there's more of additional
Is that
>> We're looking at 485,000.
We have that
the same percentage.
So, they pay 80% and they pay
>> That's one grant application.
Yeah.
>> If we have the same
80% of the cost of those
>> You're going to leave right after this?
>> Is that
>> Are you going to leave right after this?
>> Well, right now like
>> Well, as long as So, does any before
I'm not going to actually officially
open public input, but does anybody in
the public have any questions for Annie
before she leaves? I don't want her to
leave if the public have any questions
for her, so
>> You know, the 20% of something, right?
Do you know that
It's
24,000
>> It is 24,000.
What?
Anybody else have any questions for
Annie?
Does the board have any questions for
>> No.
>> Unless
Thank you.
>> You can leave anytime you want if you
want.
>> Okay, thank you.
>> 478
>> Rules of procedure there for your
meeting with the attorney
on those tonight.
question last weekend, I mean not last
weekend,
last week, uh was asked about that
conversation with the attorney in
public.
Anytime we meet with the attorney, get
legal advice from the attorney,
is in a what's called a non-meeting. So,
that conversation will be will be
happening in a non-meeting. Um just so
everybody knows that.
Um but there won't be we won't change
anything tonight yet until we meet with
him.
State issued driveway permit.
Everybody see that?
>> That was 28
just past White Oak Peacham heading
towards Auburn.
Um Province Road driveway regarding
>> the Huckins
subdivision {slash} cistern.
that
subdivision there was supposed to have
two cisterns put in.
One only ever got put in
and
the board at the time back in 2018 had
made a decision that the applicant could
no longer sell any lots without until
the second cistern gets put in.
Well,
the second cistern is in is in the
process of being installed. Um
been doing
all the
the excavation work right now to get get
it ready.
But, the applicant has sold a lot
and there's a builder that wants to
build on it
and planning board won't give him a
driveway permit because on the tax cards
it says there's not to be any
uh lots aren't supposed to be sold, no
building permit's supposed to be issued
for it.
So, [clears throat]
ultimately
the board would have to make a decision
to vote to allow the buildings to happen
and driveway permits be issued.
>> Well, it's pretty certain the system's
going in.
>> It is now.
>> Um the constructions already underway.
Yeah, in fact, the site's pretty much
prepped. I would I would
>> The
>> I went by there yesterday. It's pretty
much prepped.
>> They did uh
The applicant did go to planning board
about a month ago.
Um with cost of what it's going to be
that they're going to do with um there
was like a 3-4 month lead time for them
to get the actual uh chambers for the
cistern to put in, so
It is happening.
So, if you want to allow
>> Who's putting in the system?
>> The applicant.
>> Who's doing the work?
>> I don't know who's actually doing the
work. Um I do know Shay Concrete that is
supplying
the chambers for the cistern. They're
overseeing
uh when those get installed.
So, their their engineers are going to
oversee everything on that end of it.
So,
>> So, did they continue this
without permission, basically?
Against the rules.
>> They they sold sold the lot against what
the board had voted at the time.
So, now that this
buyer that bought the lot is trying to
build
and unfortunately, the cistern that's
going in is going in on Gray Road.
The person that bought the lot that was
up for sale is on Province Road on the
dirt side of it.
and unfortunately, he's right next to a
cistern that's on Province Road.
But, it's all part of the subdivision.
it's it's
it's been a it's been a big mess over
there many years.
>> It's not the buyer's fault.
No, it's the buyers fault. It's
definitely the sellers fault.
And where the lot that he did purchase
is right next to the other system that's
on private road extension.
And um, I mean my feeling is it's a
single lot.
There's already a system right there.
The other system is prepped prepped and
ready to go in.
I mean I
I don't see any reason why we should
penalize the buyer.
>> No, it's it's not his fault.
>> And that's really what we'd be doing.
>> How many lots are going in?
>> I don't remember off the top of my head
right now
how many left
are to be sold. Honestly.
But
>> Have they abided by the rules with
everything else?
>> Oh, this has been a fight. To my
knowledge it's been a fight. To get
>> That's why we stopped the showing.
>> I I I get the buyer. It's not their
fault. But then the seller sees that
we're going to
fix it for them when they broke the
rules. And I agree, it's not the buyer's
fault, but that doesn't set a good
example to the seller that oh well,
they'll just fix it cuz
>> You have to let it go, yeah.
>> I don't like that.
>> So I mean where's where's the
What are our abilities to penalize the
seller?
>> That'll be something
>> Cuz that's really what we want to do.
>> Right. I mean that's something you'd
have to ask legal counsel.
Honestly.
So.
Um, I know planning board and legal
counsel have been back and forth
throughout this whole process with the
cistern and
um, cuz originally they they wanted to
get a waiver
to do away with it.
But then
at planning board they came back and
there was no they weren't trying to wave
it. There was no discussion of it. They
were going to go through with it, so.
>> Sounds like between us and planning
board, we need to keep our eyes on what
the rest of this
>> There's a lot.
I mean
it doesn't set a good precedence if we
allow it.
>> How much longer before the cistern is
done? How long are we delaying this
fire?
>> Three months anyways.
>> I mean
I could be a week or two.
>> The chambers, right?
>> Yeah, the chambers take it's both.
>> Yeah, three months before we can do
anything.
>> So
Then I get it. I mean the builder's
trying to build and he's trying to get
things done before wintertime now.
So
>> That's all well and good as long as you
don't try to cut more corners.
>> Well
if we want to have this conversation
legal counsel, we can
tonight. Uh if you want.
>> him tonight, right?
>> Correct.
>> Maybe we can ask that question before we
>> Yeah, I think we make a decision.
>> Any decision we make will be a public
too.
>> So, I just want to throw that out there.
Oh.
Notification to DES and Arrows Road
culvert there. Um
we do have a requirement to notify DES
um prior to when the work's actually
going to start.
The project will start next Monday,
August 17th on Arrows Road. So, trying
to get that done before school starts.
road will be shut down two weeks.
Time frame.
>> When is it?
>> Two weeks, you said?
>> Two weeks, yeah. Next Monday, they're
going to start Earth is going to start
doing that. So.
Has
uh signage been put up?
Sarah?
Davis Road being closed?
I just want to make sure that
I would show up okay if Earth put it up.
If Earth put any signage up there if
you've seen it today.
Okay. I want to get
We'll have to reach out to Rodney and
have him
either
sign it or to sign two weeks yet.
Sign board or something just cuz I know
we sent letters out, but that's not the
whole all the residents on the whole
road.
We only did
the abutters there.
Correct.
August 17th, yep. That's when they're
starting.
>> Dead end from both ends.
on that.
Uh did everybody see the the job ad?
And so the public knows
the job ad
we are referring to is for the town
administrator's position.
we will be looking for a town
administrator
as our current town administrator will
be retiring.
>> I think that should be denied.
>> No, her vacation request is denied.
but just so everybody is aware of that.
We do see this being like a 3 4 month
process. So, it's not going to be
something that's going to happen in a
month overnight. Just so,
>> [cough]
[clears throat]
>> but
is everybody okay with
the ad the photo?
the highway grant for
the second F600
was accepted. Now it just needs the
governor and council approval for that.
>> So.
>> I'll work on that.
>> Right. So.
We got notified last Friday. Last Friday
Narrow roads, no parking.
You want to have a discussion on that?
You want to wait?
what to do?
>> This project over there is going to be a
lot of heavy equipment going in and out
of there.
There is a
road closure. There's not going to be a
lot of people places for the
people to turn around.
>> Still got a few weeks of
summer left.
>> I don't know.
>> We want to hold off on this for now or
we revisit it?
I know the time of the year.
Put it on my list to follow up on.
>> See how it goes.
I think it's tough.
>> We can something you want to talk about
over the winter time and come up with a
plan.
Instead of trying to rush right now when
>> I think that makes more sense.
I mean we
There's no easy fix there. So, it's
going to have to take some
some time.
The trash is
school board
uh
next Wednesday, August 19th at 6:00 p.m.
at Prospect
school board meets. They're going to
talk about the construction up there.
I don't know why it's not PS, but
that's what they said that's what they
told us in the email was that was it was
that Prospect. So, I was like, "Okay."
>> they have all their meetings at Prospect
now.
>> Do they know?
>> Well, since the construction started.
So, we did the Selectboard has posted it
as a meeting as well. So, just in case
three more of us go to it.
So, that is
both of us well.
The website's still being updated. No
news on that. Everything's going
smoothly.
Tomorrow
is a Selectboard meeting with Pittsfield
at Pittsfield Town Hall
5:30.
>> 5:30.
>> That's what I thought it was. 5:30 p.m.
then.
I thought it was 5:30.
So, I know.
5:30 p.m.
Pittsfield Town Hall.
Sarah
>> All right.
Uh I closed
the
>> CWS
>> for the guardrails.
>> So, what Sarah's referring to is the
guardrails for Coles Ledge.
Uh last year when that culvert was put
in, in the RFP, it was only for the
guardrails to be removed. There was a
question about whether they were crash
rated or not. They didn't know.
So, we had them removed so we could keep
them.
I happened to be on the sidewalk over
there at Cole's Lodge and noticed they
weren't
still weren't installed.
And we need to install them because if
somebody from FEMA, cuz that's FEMA
money, happens to go by, sees that the
guardrails aren't installed, FEMA can
make us pay all the money back.
at the end of the day I asked Aaron just
to give us a price to what it's going to
be to
have them reinstalled, call CWS, and
have show them up at Highland Garage
what we have, show them the project in
case
they need to be longer, whatever they
need they need to do. Um
>> What I asked him
is because they
pre-purchased them.
>> From CWS, they should be
pre-drilled.
>> Okay, perfect.
>> Um and we don't usually have to ask them
what the guardrail is.
>> Um
The only other thing is that I need to
know the linear feet.
And they it used to be 5 ft.
And that is not happening.
So, the only way that we can be able to
install those guardrails
is if we add material.
>> Because as of right now, today, like I
went out there cuz I finally got to move
those. Somebody to talk to them and they
were going for information and stuff.
>> And I went through our folder, our
filing cabinet trying to find out how
many feet it is.
Um I went out there.
Um I took pictures of it. I took
pictures of what they asked for the
guardrails. Um
I have to send this down to them
tomorrow.
But we're going to have to add material
to that cuz it's not 5 ft.
Well, on one end it is.
>> On the other end it's not. It's just
like right over three one to add
guardrails for right over there.
>> One end is and then one end isn't.
>> So, where is it not deep enough? Right
over the culvert?
>> They so the inlet side is not deep
enough.
>> The inlet?
>> Yeah, that's the higher end.
>> So, unfortunately,
so,
uh close to that one, I don't know
exactly
what you guys
want us to do. If add material, the
problem is is that
you're coming down the hill,
and then it it levels out. If we add
material, it's going to go up and then
down again.
>> You have to like spread it out there.
>> Spread it out, but I mean, you're still
going to have to dig down.
Lift.
>> How much of a span are you talking?
>> How much of a span are you talking? How
many posts?
>> I'm not sure how many posts.
How many posts it would take.
I know we have the guardrail
>> No, no, no, I mean, just in the area
where you can't get 5 ft.
>> How much material would you have to add?
>> No. You're adding material because the
post can't go down 5 ft, right?
>> Right. Yeah.
>> How many posts?
>> How many posts? I'm not sure
I'm not sure. Um
once I get them their information that
we're looking for, I can ask them if
they could come out and take a look
>> at it and give us a quote on what it
would cost to get those installed.
>> Cuz a lot of times you can put shorter
posts in and double nest the the
guardrail.
>> I'll write write that down so that I can
refer that out to them tomorrow.
>> Shorter posts, double nest. It's why
you're here.
>> Do you have the posts, too?
You do?
How many posts you have, do you think?
>> You said double?
>> Double nest.
>> The other part of this, just to make
everybody aware, is FEMA paid for the
guardrails,
and we wanted to wait, put them in, and
when the project was completed, they
made us put them in, and then You to
take them out for the project, and now
put them in again.
>> So, that's where the hassle came in
instead of just waiting.
>> 17
>> Looks like
>> 617, but I'm counting on my pictures
that I took today.
>> Okay. Wouldn't You couldn't get 5 ft?
>> They said they needed 5 ft on each side
to be able to
>> Yeah, but
you're looking for the post, right?
>> I'm just looking for the post.
>> Yeah, just how many posts?
>> That's what I just counted. It's 17
17 posts like they're
>> He means He's asking how many
posts can you not get 5 ft deep with?
That's what he's asking. I got I get
what he's saying now.
>> Yeah, cuz it's it's only a little bit.
>> Um I would want to say maybe two or
three.
>> Yeah, two or three.
>> thinking like, "Okay, so if they can't
do [clears throat] 5 ft for a culvert,
then they can't make it like
maybe it works not in the culvert.
>> That's just
>> But I know I know most lengths culvert
is what? It's like that's a that's a big
culvert.
If they don't have
>> Uh that's 5 ft. That's a 5-ft culvert.
>> 5-ft culvert
>> 5-ft culvert with a 3-ft overflow.
>> That's pretty wide. I mean, I don't know
if they're able to do that. They might
have to put one right in the center. I
don't know.
>> But if if they do
they can double nest it and put a short
one in.
>> Yeah, I will I'll talk to them about
that.
>> But other than that, they should be able
to
It's just where in that culvert area.
>> Yeah, good.
>> Just like Wino, same thing.
it's actually
I want to say like not even 3 ft from
the top of the road for each side with
the inlets.
down to the culvert.
I mean, that's just estimating.
>> Just what I see. Anyway,
>> I could do the same thing there, too.
>> Mhm.
Did that I
the grader had that work done to it with
the valve
stuff from Richard.
>> Uh they came here and helped you guys.
I am waiting for a call from
the GM
for John Deere
because of what they're charging and
they're blaming
>> They're blaming Richard for the whole
situation.
Now, according to Richard, what I was
told by Richard, is that he went to John
Deere, purchased the valve,
brought it to the shop, put the valve
in, took out took the old valve out, put
the new valve in.
Okay? Started up the machine. The
machine started for like
30, 40 seconds and then it just like
fell on its face. It died.
And he [clears throat] went
took that
new valve
and he had stated to you guys that he
pretty much burned his hand because it
was so hot.
Brought it back to John Deere.
And then they told him that
well, it's a hit or miss. Some valves
you don't need to program into the
computer, some you do.
Okay?
So, he took that cuz he asked them if he
could check to see if it was faulty or
not or that valve. They refused to do
So, he brought the valve back back, put
it in, installed it.
John Deere came out
and I have the report here from
um John Deere
they took
the new valve that Richard put in,
put the old valve in,
stole the code.
The code came up again.
Took that valve out.
Put a new one in.
And then the code went away, but it
ended up shorting out some kind of
wires. So, there would have to be a
what? There was wire
ran from one end to the other end to
this uh
ECU.
And they're pretty much just blaming it
all on Richard for doing that. And they
are stating that they told him right
away.
According to Richard, that was not the
case.
So, I like I said, I'm waiting for the
GM. His name is Jeff. He's calling me
back because the gentleman Matt who came
and did the work said that he was going
to see if they could cut us a break on
how much it was going to cost.
>> want me to call Jeff?
>> I don't mind. I I will talk to him
>> I thought we had already They already
determined that that that valve was
faulty.
>> So, this is
>> I have Jeff's personal number.
>> No, but they said before
>> Yeah. Well, that's
>> So, they changed it, too?
>> They So, Richard even thought it was a
faulty valve because it shouldn't have
done what it did.
>> But, they're saying it's all Richard's
fault that he put the valve in.
But, it wasn't put into the computer.
Well, it wasn't The computer wasn't
there.
>> Well, they're trying to skate about it.
It's pretty obvious. And
I don't know Jeff very well.
>> I talked to
the general manager today.
Because I'm
trying to figure out why is it Because
it sounds like when they put that
Yeah, Richard put the valve in. Took the
old valve out, put the new valve in,
right?
Then when John Deere came in,
it ended up being where
they swapped valves like a bunch of
times. So, what what makes you think
that that you guys doing that didn't
short it out what shorted it out?
>> Yeah. With the computer and the the ECU
and and stuff just like
>> I mean you can have a cool with this and
stay calm. Tell them to come get your
machine when I'm done with this.
>> That's actually
>> We own the machine.
Like we own the machine. I think I'm
going to pick it up.
>> Just stay calm with
>> No, I I wasn't I wasn't rude or
disrespectful or anything like that. I
was talking to him and I was just trying
to figure it out with him.
>> He had basically said
>> I could have sworn we already heard that
valve came back and it was bad.
>> It was bad, yeah.
>> And that they were going to cover it,
getting us a new one.
>> That's the story we heard already.
>> So they're contradicting you now.
I got my notebook.
Okay, we're good.
>> I think that is
it.
I think that should be
Uh I did have a
I will be sending an email out stating
that um
mail will order will be
placed this
this Thursday.
So that's going on tomorrow.
>> Stating that
mail I was going to work on shiko over
for narrow at the beginning of narrow.
But that's not
not going to be next week's project.
That's going to be next week. So I'm
going to do next week. You know, work
over on
province.
>> Yep. Yep.
>> Going that way.
>> When is mail?
>> Mail is Thursday.
>> This Thursday?
>> So we're talking Thursday.
>> I think that's it for
So a couple weeks ago I'd asked about um
engineering projects that we talked to
that we wanted to get Sarah in the room.
I talked to Sarah about
projects there. Um
Her and I talked about trying to
prioritize which ones need to be done or
and the top three were
the North Brister Road
there,
White Oak Road and Damsite Road were the
top three. She said,
"Don't worry about culvert failure,
Hazel Park detection." He said after
they flushed the culverts that that's
been okay. That's been good over there.
thought process was is those three
projects we send out to the
between the two engineers we have, um we
can decide who who gets what.
So, at least start planning it and
giving us number-wise.
cuz we do need numbers, we do need to
plan
as it was stated.
I can't remember if it was the
>> So, what are they going to do? They're
going to go out and
take a look and see how many uh
culverts and what kind of condition
they're in and blah blah blah?
>> No, they're going to look at
the So, the culvert down by White Oak
Road, the one that's washed out before.
>> They'll look at that. Re- replacing
that. The one at the bottom of Locks
Farm there, Crescent Drive at North
Brister Road, look at that culvert.
Damsite Emerson intersection.
The one that we have a separate Damsite
Road fund for. So, just that project to
look at that. Get them engineered.
>> But, the comment was made previously
that things just don't happen overnight.
And they don't.
You know, we look at Hannah Road
and that was engineered and it took us
10 years before we could do that. And
that was applying for bridge aid
>> through the bridge aid fund there.
So, if something like North Brister Road
needs to happen,
it probably could it could easily be 10
years before that happens if we apply.
But,
it may be a situation where if get
number-wise, we can plan accordingly
and not try to wait as long to get it
done, either. But, we've got We can't do
anything We can't plan accordingly
for any of this stuff if we don't have
numbers, honestly. So,
we do need to have some kind of a plan
in a place cuz at some point
things are going to fail and we're not
going to have an option other than to
put concrete jet
Jersey barriers up and close the road
up, honestly, cuz we're not going to
have the money
to do it.
Um actually, but those are the top three
to try to get them out.
>> Sounds about right.
>> engineered over the wintertime.
just to try to get on track, plan
accordingly, so we're not trying to
have a failure and then rush through
everything, too.
So, that was my thought.
You can ask Sarah questions on them, um
but
>> My My personal opinion, I think Wayland
is not a huge remedy. You guys had it
flooded before?
Yeah, it has. Probably because there was
beavers that were blocking
>> And it was flowing. Yeah, that was the
problem.
>> Yeah, and it's flowing and
the beavers were um
taken away. Um
And we did flood it.
>> They are common in there.
>> And they still plug it up.
>> But, we got it We took care of it. It's
still flowing. I was just there today
looking at it and stuff and it was It's
still doing its job. Um
North Farmstead, um
probably should be taken care of and
same with Damstead.
>> Sure.
>> Those are the two I say. And like what
Amy said for Cold Brook Dale, um in that
in that intersection, um we cleaned out
the pipes on the Monday that I left
after work. Um
We rinsed them out. They're the time.
It's just that it needs ditching. It
needs really good ditching work.
>> The The Bale Road Thursday, that's at
Colback, right?
>> No, that's actually
up by Mr. Bale.
>> Is that on where now?
>> Mr. Bale's house.
>> Mr. Bale's house, yes.
So, there it's like
you go up the hill, there's a a house
that's been there for a while, then
there's like a new house. It's like
right there.
>> There's an old
>> And it's on Bale, not Colback, right?
Correct, yeah.
>> What? Bale?
>> Bale, yeah.
>> The flat section up there, too.
>> Yep, I know where it is.
>> On Bale, yeah.
>> Uh I did want to say this though, um the
line striping
>> So, I got a hold of this from
one of the gentlemen that work there
and their line striper is broken.
I got a hold of him the other day.
>> Their line striper is broken.
So, I don't know
I have no other I don't
I don't know of anybody else that might
have
something like that that we could do at
Maple Street.
>> Or the line The only other thing I can
think of is they do paint. paint
You can go to like Home Depot
and it's for asphalt.
And we can paint it with a roller and
then I don't know if they sell the
reflector
beads.
>> Yeah, the glass beads, yeah.
>> Yeah, um I'm not really sure if they
sell that at Home Depot, but that is
that is an option. It might auto
automatically come in the bucket. I
don't I don't really know. I don't do
research on that.
>> So, you ever heard of that, Jason?
>> You mean lines with a roller?
>> What is it?
>> No, it's sold at Home Depot.
It's usually a thermoplastic.
>> I mean, I've I've seen people do parking
lots with their own parking, you know,
little stores or whatever and they have
A roller person there.
>> I think we should look around for some
other ideas.
>> Yeah, something.
>> And that's the only company
>> There's only stop bars on Maple Street.
>> What are you looking to put? Center line
or
>> No, stop bars.
>> Just stop bars.
>> I'm not up to the paint by number. I
think we need to have this
professionally done. I know it's going
to cost a few bucks, but let's go ahead
>> Grab some paint brushes. Get on it.
>> Let's do it.
>> All right, we'll do it.
No, I don't I don't mind. I I can
research it.
>> Does State get an old one?
I'm sure they do.
Yeah, I'm going to figure something out.
>> They're pretty good.
>> What about the crack sealer?
>> Yeah, what's crack sealer?
>> Uh 714.
>> 714, okay.
>> Nice.
>> Uh-oh.
>> Save it. Do you need this back?
>> No, leave it on the desk.
>> Oh, uh yeah.
You're certainly welcome.
Add it up.
Open public input at 6:44.
>> What did you say?
>> 714.
>> I just wanted to
say that I just wanted to thank you guys
so much for
uh stopping in and building a home day.
And being here for three days.
it's nice to see you all again.
>> You guys did a great
>> Did a great job.
>> Great job.
>> Great job, yep.
>> A lot of work. Did they make any money?
>> What's that?
>> How much money they make?
we're hoping to break even.
>> Diana?
>> Can I ask a question?
>> With the
how old is the dryer?
Is there any way to get a warranty on
it?
>> 13.
I believe it's 13.
>> So maybe
I worked at a salon for a year.
So maybe a way around with the dryer
trying to get a new one is actually
going to get a warranty on it.
And claim it as a warranty.
Depending on what components
are replaced, it could fall under your
warranty. Just as an option.
>> There is no warranty with that machine.
>> Not at all?
>> Nope. It's too old for that.
It would be an over-the-counter part
warranty.
Is what it is.
>> I believe it could still take a look at
it. I need warranty for the dryer.
>> And we have a contractor over than that.
That means we're able to get warranty.
There's all about how it's written in
the contract.
>> There may be a There may be a loophole.
>> Like if there was a recall or something
like that.
Try that. Yep. I appreciate that.
Any other public input?
>> When do you know?
>> Oh, the 19th?
Frank, you want to answer that?
No, that's tomorrow.
That's tomorrow's meeting. 5:30
>> 6:00 p.m.
I know. 19th 6:00 p.m. I figured you
wrote it down.
How did you say that?
6:00 p.m.
Got to have some fun.
>> Usually you look at your wife and you're
like, "Really?"
>> How would you like to pay for
Yes, so we received
a draft.
so then assuming that we use that there,
we will get the point across
and then we have to shoot the other side
of the boat.
We'll go
to revenue and then
that will be
all of the dollars that we
>> That takes a few months. That's not
nothing that happens in a week.
So that that should start.
Right? That takes like a It's like a
two-month two-month process.
Yeah. Yeah.
Nope. Nope, she is still the treasurer
right now. So.
Hello.
Anyone else?
Yeah. Yeah. Select board and yes, TV.
perfect. Appreciate that.
You got to find some more people.
No.
Anyone else for public input?
Close public input at 6:47.
>> That's good. That's only 3 minutes.
Make a motion we go into non-public
under RSA 91-A.
From the moral three to
B.
I'll second it.
All in favor.
>> Thank you all for coming.
>> Thank you.