Board of Selectmen
The Board approved purchasing a 2016 van for the Recreation Department for $31,809. Funds will come from the Parks and Recreation revolving account and the YS special projects account. The vote was unanimous. James Ainsworth was appointed Deputy Treasurer for a one-year term by unanimous vote. The Board delegated authority to the Planning Director to sign and execute documentation for the West Main Street sidewalk project, utilizing the Business and Transportation Alternatives Program and Highway Safety Improvement Funding. Minutes from April 8th and the consent agenda for April 22nd were approved. The Board also approved signing paperwork in anticipation of a tax anticipation note. A pre-construction meeting for the West Main Street sidewalk project is scheduled for the week of May 4th. The Board requested a volunteer representative to negotiate with the police union. Source: https://townhallstreams.com/stream.php?location_id=178&id=74225
with liberty and justice for all. Is there anyone here for public comment? Rache Cochran, for the record. Just a couple of things. The last meeting that I was here, I put in a few requests, one for the audit to go online, one for the financials and stuff. And I didn't know, it's not on the agenda, so I didn't know if that was something that you guys were going to discuss or if it was just something that I shared that I'd like to see and we're just going to move on from that. The other thing I didn't think to mention last week had to do with the owl and the fact that the meetings for quite some time now have been interrupted. Either the owl is not working for the sound or it doesn't record in play during meetings, such as the last meeting. It wasn't running for the first, I don't know what it was, half hour, hour. So I'm just wondering, I know we've had somebody who has experience, Larry Baker from the zoning board has offered help and everything, so I'm just wondering if we're going to have maybe a policy or a manual or something on how we can get this owl working consistently for the public to see, you know, remotely. So that's pretty much what I wanted to follow up on. Can anyone help? I have something to say. Take your name, please. Diane Rothaford. I'm a resident on Jones Road whose property value, at the most recent value, doesn't look good, according to another Jones Road resident who happens to be a state rep. Not to mention any names, of course. That's okay. Without actually accusing me of being unethical, she did. A state rep insinuating in an open public meeting and ministerial employee of doing something not quite ethical is not a good look for said state rep. Her words, not mine. For the record, the assessed value on my property has gone up a substantial amount since I purchased it in 2015. Insinuating I did something unethical and compromised my integrity in an open public meeting and spreading untruths, at the very least, is hopefully unfair and at most slanderous. This is not the first time that said resident has questioned my work ethic and integrity in an open public meeting without my presence. Is that ethical? In my past life, it was required of my position to attend ethics classes. Not because I was unethical, but because it teaches one to recognize when someone or something is not ethical. You cannot teach ethics. One either has it or one doesn't. I have it. I have a code of ethics I live by. I am not the only employee of this town who has had to endure the wrath of this resident. The reason behind such bitterness and malicious behavior is unclear to me. What is the main goal of this resident? Please do share. So the goal can be achieved quickly and the end of the nonsense and the grandstanding and the wasted time chasing down, I'm sorry, I have to write it, I'm sorry, something that is not there, like corruption, fraud, and out-of-control spending. Never really quite said out loud, but definitely implied. The phrase, it's not what I meant, it came out wrong, it's old and frankly just words with no meaning. One should either choose their inferences and innuendos more carefully or choose not to say anything and at all until complete truth and background is available, unless you are seeking plausible deniability. This is my statement, my perspective, and I will not engage in out-of-control conversation. I am not here to spend my position as I have not been deceitful or disreputable. I do expect, however, a sincere apology, both written and verbal, in an open public meeting. I would also expect that trying to disparage an employee without due cause and a public meeting never happen again. Thank you. I did, last meeting, come in and talk about the assessed values. I did not ever accuse an employee of any wrongdoing. In fact, what I did say there is that I did not accuse her of anything. I don't believe that she did anything nefarious. I said it's not a good look for the town when the employee of the town is the only one who had a substantial tax decrease at that meeting. So I did not say, I was not slanderous. I did not accuse her of wrongdoing or anything else. So I have the ability through public comment to be able to respond and I want that on the record that that's not what I do. I have the ability to respond to. Excuse me. I'm not going to do that. I'm not. We're all set. I would like the opportunity to talk with you privately about it. I would not. Okay. Anyone else? All right. Public comments are closed. DEA regarding House Champion Award. I'm not sure. I'm not sure. I'm not sure. Then I'll hear you. You're out. I'm cutting for some questions. Are you ready? Yep. All right. JT. Oh, and since JT is here, he is meeting with the school on Tuesday for, because we're switching over to YouTube and the animal. Okay. All right. So last meeting, we talked about me going to look for vans. So I did find a van at a Merchants Auto, and we brought it in. Mike took a look at it. He said it looks pretty fantastic. I think you guys would agree. So this one is the actual van that we're looking at. These are two other options. Basically, it's a 2016. It was used to transport people from a Marriott Hotel to the Chicago airport. So it's got 2,500 miles. That's 2,500 miles. So for 31,000. Everything else at that mileage or anything like that is closer to 60. So I was coming here looking for the board's approval to purchase said van. How many miles does it have on it? 2,500. This one? Yep. I didn't believe it either. 2,500? I didn't believe it either. I thought you said 250,000. No, no, no, no. Oh, gosh. Yeah. 2016 is only 200. Yeah. Yeah. The only thing it is is updated electronically, but it is in pretty pristine condition. So just to remind everyone, the funds would be coming out of the revolving fund, which is where we've taken the motion. Is that approved to tell me? Yeah. I believe capital assets have to be approved by the town. Excuse me. Public comments are done. So much for transparency, Iris. I'll make a motion to purchase the van for the recreation department for, is it 31? 31-809. 31-809. From Merchants Auto. So you want to put the funding in the warrant? It says. In the motion. The funding would come out of the parks and recreation revolving account and the YS special projects. And the YS special projects account. Do I have a second? I'll second it. All in favor? Before, I know in my past life, whenever we bought a vehicle, it was always done, like Mr. Buss has said, that we always sought approval at the town meeting. How is this different? Because we're not asking taxpayers for funding. Because we're taking the money out of, we're not using taxpayer dollars, we're using dollars that they raised. Right. Same with the fire truck. The fire truck is funded. You have to take out a... The fire truck was, yeah, not the taxpayer dollars. That was just for the first payment, other than that, coming out of taxes. Which is why it had to be on the air. It's a capital asset that has to be approved at town meeting. Okay, we have a motion in a second. Do I have a vote? Yeah, all in favor? All in favor? Aye. Aye. Aye. Okay. Thank you. Okay. I'll introduce my crew here. My name's Andrew Dorsett. Sorry. My name's Andrew Dorsett. I'm with the BDA, the New Hampshire Business and Economic Affairs Department, and I'm the director of the Office of Housing and Infrastructure Development. Underneath our office is a couple of, our few housing programs of Best New Hampshire, which was a hundred million dollar effort to help create some solutions to the housing crisis. That was put into effect back in 2022, and we were able to team up with municipalities and do a number of different programs. One was the Municipal Per Unit Program, which we, I think, did about $12.9 million in grants to municipalities that permitted affordable housing projects quickly. We also did a demolition program that helped communities clear life in that community or create green spaces or other aspects that would help support affordable housing or just housing in general in their town. So they could create parking lots, partner with developers to do environmental mitigation of mills, and that we're going to be turned into affordable housing or mixed-use programs. We also did a capital program that worked directly with developers to help provide gap financing for affordable housing projects throughout New Hampshire, and that was interesting. Our largest project was, I think, was 500 units. Smallest was four, so we really did the whole gamut, helping seasoned developers right down to first-time developers. An emergency room doctor, for example, him and his wife were talking, and he was saying how his babysitter and the guy that cuts his hair and the kid's teacher all were saying they couldn't find housing up in Littleton, New Hampshire. And so they took their credit card and took out a loan, and they maxed out everything and started building 12 units in their community and tried to solve the problem themselves until they ran out of money. And so we came in and just gave a little bit for them to be able to finish, and, you know, 12 people and, you know, 12 families that have homes there on that small project. But overall, that program was able to create about or assist in the creation of about 4,700 units over the past three years. And one other component of the program was the Housing Opportunity Program, which helped communities to think about development in housing and started to have a community dialogue to think about what kind of housing and development that was right for that community. Because our program, we didn't want one-size-fits-all, you know, a hammer to come down and tell you what the thing can do. So during that process, a lot of communities started stepping up, looking at their ordinances, making different changes, thinking about their infrastructure and how they could get ready for the type of housing and development that they would like to see. And so out of that program came the Housing Champions Program. And so Leanne Monaghan, she's our Housing Champion. We'd like to, you know, pretend she's got some kind of a wrestling award on her shoulder. But as she's been out working with communities, I think you guys are a great example of a community that's been working with us. And I'll let Leanne take it from here. Thank you. So I just want to start by saying congratulations to Hillsborough for being one of 10 Housing Champion communities in our second round. We have a total of 28 communities in the state that are Housing Champions. 18 was in the first round and 10 in the second round. Again, Hillsborough was one. I'm going to just very briefly tell you what Housing Champion is. It was a partnership between the state and municipalities to reach out to communities of the willing that recognize the need for housing throughout the state and in their community and take a look at their ordinances and be open and housing-friendly by having ordinances that didn't exclude affordable housing but, you know, looked at their housing. There was nothing, like Andrew said, it wasn't like directing you have to have these ordinances. It was kind of an a la carte. You could look at your ordinances and pick and choose what fit in your community that would help alleviate some of the housing crisis. It also wanted communities to look at their planning and zoning boards and make sure they were trained and understood the value of housing and how their ordinances should be crafted, maybe take a look at their master plan through the help of the HOP grant, which he said those funds came out of the ARPA funds that helped communities get this application in, and lastly to look at your infrastructure and see where you might need water, sewer, or transportation. And those communities that did step up in the first round anyway and became housing champions, then there was grant funding available. We had $5 million that was available from the state that was directly to communities, not to developers, different than the program that Andrew spoke about that went right to different communities to help with infrastructure. So in the first round in 2004, we did spend or award $5 million to seven communities in New Hampshire. Now, the 10 communities that came in in 2025, they did not approve more funding for this program in the last budget. But we are hopeful that in the future now that you are a housing champion, you'll be in line that if there are future funds available for infrastructure, that you'll be allowed to apply for those funds. But in the meantime, we have looked at other ways that housing champion communities like yourself can benefit from being a housing champion. And we've partnered with agencies like DOT, like DES, and they have made it part of their grant process for the Clean Water State Revolving Loan Fund. So that it's actually part of that grant, if you're a housing champion, you get 10 extra points on their program. DOT is looking at accelerating permitting for communities that are housing champions. DNCR as well is looking at adding it to their grant programs. So that's a way of kind of partnering with agencies to help communities that are looking to adjust housing. And so we're very proud and happy to be partnering with Hillsboro as one of our smaller communities to be willing to be a champion. So congratulations. Do we have any of our officials? I think we have any recs here. Three of us. I'm sorry, I didn't have to miss that. Do we like to speak at Peyton or Jim? Oh, no, I'm just, congratulations, that's all I want to say. Great job. Thank you. Yep, I agree. And we also have Margaret here from New Hampshire, Margaret Barnes, Municipal, New Hampshire, Municipal Association. You got it. Well, thank you. I'm Margaret Burns, I'm the Executive Director of the New Hampshire Municipal Association, and I wanted to come here this evening to congratulate you on achieving Housing Champion status. The Housing Champions Program is a beautiful partnership between the state and local government to address a statewide issue, to address housing. And it does it through incentivizing municipalities to make choices locally that work best for them. And really what the town of Hillsborough and all the Housing Champions have done is exemplify that local options and local government can get things done when it comes to housing development and other issues statewide. So congratulations. Thank you for being a stellar municipality and for going for this Housing Champions designation. It's not easy to achieve. And this was one of the programs that NHMA advocated very hard for, including continued funding for the program. And so while the program wasn't funded in the current biennial budget, I really applaud the BEA for finding other creative ways to reward communities who have achieved this status. And NHMA will continue to advocate for funding for issues like housing and others. So thank you for having me. Thank you for listening, and congratulations. We would like to, if we have a plaque, we would like to get a photo with the board. If we can just take a minute to do that with the, is that okay? If we take a minute to do a board. The whole board or just the chair? The whole board. I mean, I didn't sign it. I don't know if your chair or your planning board is here. I mean, no, our planning board is here. I mean, however you like it, yeah. Margaret, come back here. No, no, no. Can you get all the work? Thank you. Thank you. Thank you. Thank you. Thank you. Thank you. If you can't see the camera, we can't see you. Do you mind if I jump in one? Yeah, jump in. All right. Happy reuniting. Thank you. You got that? Okay. Sorry about my best. That's okay. Beautiful. Okay. I'm with BEA, too. This is Lorna, our media expert. There we go. Do you want one with the front of it? I'm trying to get it turned around. Oh, there we go. Beautiful. Thank you. Thank you. Thank you for having us. Thank you. Thank you. Thank you. Thank you. Thank you. Thank you. Thank you. Thank you. All right. The next item on the agenda is Deputy Treasurer, James, here to meet you. So this is James Ainsworth. I sent the board an email regarding the processing with three deputies, and there were three individuals who were interested in it, and in speaking with Gail Crimmins, who is the treasurer, about the three. One of them took themselves out of it because his schedule wasn't going to jive with what we need in, and Mr. Ainsworth, not the vicar, and so this is the board, Iris Campbell is the chairman, Rich Pelletier, and James Baker. Nice meeting you. Relative newcomer to the town of Hillsborough, we moved in in May of 2022. We escaped the wilds of Connecticut to live free and maybe die a lot later. Just really enjoyed the time we spent here as vacationers, but always pined for the opportunity to be a full-time player in the land of good nature and really wonderful people. We've enjoyed our stay in the town of Hillsborough. I was looking for a way to provide a little bit of my expertise, whatever might be needed, to assist in this capacity as deputy treasurer. So I look forward to the opportunity to serve whenever duty calls, and further my education in the town's operation and its finances. So thank you. So I would leave the motion to approve the appointment. I make a motion to approve the appointment of James Ainsworth as a deputy treasurer. Do I have a second? Second. And this is for a one-year term? For a one-year term. All in favor? Aye. Delegation of authority for the West Main Street sidewalk project. Robin has been the LPA person for the sidewalk project, and there is some paperwork that's coming forward that requires certificate authority, which the board is well-versed in it because most of our grants have that, so I'm requesting that the board make this motion, which I'll ask you to read, and pass it, and then have the chairman sign the certificate authority. To make a motion to grant the authority to the planning director to sign and execute any and all documentation and to implement activity on behalf of the town of Oldsboro Business and Transportation Alternatives Program and Highway Safety Improvement Funding for the purpose of the West Main Street sidewalk project. Do I have a second? Second. All in favor? Aye. Aye. My hand doesn't shake too much. It's still cold. I make a motion to approve the minutes of April 8th. Do I have a second? Second. All in favor? Aye. Aye. I make a motion to approve the consent agenda for April 22nd. Do I have a second? I second it. All in favor? Aye. Aye. Aye. Aye. Aye. Thank you. Thank you. Thank you. Thank you. Thank you. Thank you. Thank you. Thank you. Thank you. I make a motion to accept the manifest through April 22nd. Do I have a second? Second. All in favor? Aye. Thank you. Thank you. Thank you. Thank you. It is, it is listed on the consent agenda. It is listed on the consent agenda, but there's been a change in the bank and we're not sure if they want it to be a separate motion in the minutes. So I'm asking that you do that to sign that paperwork. And I make a motion to make a motion to make a motion and I make a motion to make a motion and do I have a motion to sign the paperwork in anticipation of a tax anticipation note. Do I have a second? Second. All in favor? Aye. All in favor. All in favor. All in favor. All in favor. All in favor. All in favor. All in favor. All in favor. Do you want us to wait for you, Jim? No, go ahead. Okay, go ahead. I just want to explain a little of what I gave you in your box packets. Rich, at the last meeting, you wanted to see a listing of taxes by year? Correct. So that is this paper? Yep. The warrant numbers that are on the left of the paper, anything with an L, those have been leaned. And the years are in the years, and the years are right there. Yep. I just want to make sure that's what you were looking for. Yeah, that was what I was looking for, that's right there, that's just a summary, right? Yeah. Yeah, that's good. So the bottom line is that we have to make up all these tax dollars at the end of the year, right? Because we're anticipating getting the whole amount in. If we don't, then that money is going to come from somewhere, correct? It comes from them eventually when we collect it. That's true, but I mean... We can't go out in and... No, no, no. What I mean is, when we set out the tax bills, we'll say, nice even numbers, we'll say between the school and the town, we need $2 million, okay? And most of that comes from this, I would say. It comes from the tax bill. Yeah. Yep. And if we only collect, instead of collecting $2 million, we only collect $1,900,000. That other $100,000 would have to come from somewhere, because our bills are going to have to give the school their money, and our bills, and that comes up to $2 million. So we would need that $100,000 to come up from somewhere. That would be the money that we have in our capital reserve. Where does that money come from? Where does that other $100,000? I know we've got to do this before. So it really, it comes from the taxes when they pay it. We can't... So we have bills this year. I know. That's why we have tax anticipation notes if we need it. If not, we... Our finance director is very good at, especially when it's time to send the tax bills out, talking with schools. Sometimes the school will take a partial payment. Sometimes we can hold bills aside, but it's kind of a rolling number. Because if all our bills were due at once... Correct. And we got all our bills in, but we didn't get all the money in, then we would take out the tax anticipation notes. Okay. But at the end of our fiscal year, we have to pay all of the bills for that year. And if we don't have... Again, the example that I gave, that $2 million that we needed to pay the bills between the school and the town, and if we only get $1,900,000, that other $100,000 would come from a tax anticipation note? If we didn't have any funds to pay it, yes. But now, you have to remember, we have a fund balance. It's not 100%. But so that... We don't pull from the fund balance and put it towards something that hasn't been approved at town meeting. No, granted. But if you have money in your account that you can't spend, it's still in your account, and it's a rolling number. Correct. You know, in a perfect world, if we got all the revenues in, we got all our expenses in, we paid everything, that sum of money would be there. Correct. But to say that, you know, we don't have $2 million that just sits there because of this. No, no, no. No, I mean... But if we don't have the money, then we have to take out the tax anticipation note. And then when the taxes start to be paid again, we pay off that note. But that tax anticipation... I remember a couple of years ago, we were really, really short on money. And that's when we had that tax anticipation note. Yep. And that wasn't because... That wasn't because... We didn't get the tax revenue in it. It was because it was before the date that the new... Because our tax revenue is based on basically two dates, December and June. During the rest of the year, we hardly get any money in, I would imagine. Right. Well, we get... Yeah, we get... We get a little bit, but most of it is... But those are the big, big times. But if our expenses exceed that amount that comes in in June, that's when we use the tax anticipation note. And we have to pay it back. Right. Okay. I'm sorry, I have all these questions. Some of them we've probably asked before, but we have other money. We have, like, a million or two million dollars sitting in one of our accounts. Correct? Don't we have the... First, you have to specify what accounts you're talking about before I... Because I don't know what you mean by... Okay. We have... Remember when we were doing a budget, and we were talking about buying... First year payment on the fire truck, and I said we could take that $140,000 out of... The capital reserve fund. Capital reserve fund. Yep. That capital reserve fund is used for what? Fire equipment. That's the... They have a capital reserve fund just for fire equipment. But don't we have a capital reserve fund for the town as well? Like a large one? No, don't we have... I thought we have... You mean our undesignated fund fund? Un-designated fund fund. That's what I was just talking about. Yes. Yes. What do we use that for? We can only use that for whatever we request the voters approve to use it for. So we don't make it... We don't use that for a shortfall in our... If there's... We don't use... We can't take from it and not replace it, let's just say. So it's not that we physically take from it. If we've collected more money than we needed in a year, which we can't bill more than we need, so we don't... It's just a matter of we've... It's been a good year. People have paid their taxes on time. We've gotten all the money we need. Well, we're really not using that. But if there's... If part of that money is in our account, it floats us in a way. Okay. But I want to be careful in the wording I use, because as we see a town meeting, it's called a rainy day fund, or you dip into it, because that's not really what happened. So, in other words, in the example that I used, where we need $2 million to run to town and to school for the year, and we only collect $1.9 million. That other $100,000 would not be taken from the undesignated fund balance. We would not borrow from that or use that money. We can't borrow from it. But if it's sitting in our account, it's just a rolling number, because every day we're putting money in the bank. So, it's not in the bank saying, okay, this much of what's in your bank is from the undesignated fund balance. That's not how it's labeled. Okay, we just have money. We know that this is the amount that we can't spend. If we had everything in a perfect world, we would have this extra $2 million right there, and we can't spend that on anything. We can't go out and purchase a building. No, I understand that. I understand that it's undesignated, and we don't have the authority to spend it. The only people who have authority to spend it would be the taxpayers at town meeting. Or, if the board chose to put some of it toward reducing property tax. And that does not mean where we found it. But I shouldn't mention that. That comes into all of the discussions. So, getting back to the question that I had, if we needed that $100,000, where would it come from? If we didn't have money in the bank, that's how we would know we would need it. Then it would come from the tax anticipation. Okay. Okay. Okay. I also gave you a preliminary schedule for the West Main Street sidewalk project. I think that pre-construction meeting is probably going to be sometime next week. We don't have the date and time yet. Let's have that. If there's anyone who wants to attend, I'll send that out to the board. If there's at least two of you that want to attend, I need to post that. So, it's going to be... It's going to be... I take that back, not next week. Next week's not May 4th. The week of May 4th, it's going to be that week. But I highlighted preliminary, so there wouldn't be any misunderstanding on that. I also gave you a copy of the expenses and revenues. Something was mentioned at the last meeting, and it had been brought to me previously by a resident who thought I should know what was being said in public. But the board looks at expenses every meeting. You sign off on all the expenses every meeting. I did give you, through March, I did give you the revenues. What was mentioned at the last meeting is somebody wanted to see that you review them in a meeting. And that's why I wanted to point it out that you do in every meeting. And, no, the board hadn't said that at the time, which I understand why. Those are all payments that the board has approved. I sent you an update via email with regard to the penny property. The barn is gone. It's been a lot of drama, and we're still dealing with that. But they did an excellent job, very professional. The property, it was wet because of the rain we have had. And the property owner called DES, three different individuals at DES, called EPA. The recent one I dealt with was elderly services. That's a whole story. But it's down. Loan has been put down to repair where the trucks damaged the lawn. And some crushed gravel was put down, partially where the barn was, so that he could put his cars that had been in the barn on that crushed gravel. So it was very nicely done, very quick. By the time they started, demolition was Monday. It's done now. So we assured everyone that we were called on us. We gave them the inspection reports on the structure. We gave them the court order. We gave them everything we had. So we'll continue to do that. So we have been, Mr. Rutherford's company, has generously donated. They had some extra office furniture. So asked if we would like it. So we are going to be picking up a couple of desks, a couple of file cabinets, a couple of accessories, tables. That we have some old furniture here that we'd like to replace. And we are not, it's being donated to us. And we thank you. There's a crew heading there on Friday to Manchester. And also in anticipation, we're waiting for Jeremy to get the pricing for the board to take a look at. And what we have discussed with this room in changing the town office so that we can provide more safety between staff and residents, especially after the altercation that took place. And we've been talking about it for years over, I don't think it was even the summer, it was in the fall. So that will definitely come in handy at that time. We could use it now. Thank you. You guys are off to play. I also gave you a Woods-Willamil progress report. I was at Woods-Willamil today. Went from the Department of Labor, which were adhering to Woods-Willamil this birthday. And they thought that was a good day to bring the Environmental Service Commissioner down. And we had explained the project to him, and he looked around, but it was a great project. And DES does this progress report, and it outlines the funding, which is really pretty cool to see on paper. But in that project is going to be set to be completed by the end of this year, by the fall. So that's pretty exciting. And there will be an opportunity if anybody wants to help out with plantings again. And the last thing is, I've gotten a request from the police union to start negotiations. So I would ask for a selector representative. We don't have to do that right now. We haven't set a date. But if there's... Between the three of you, any of you who were just dying... I don't think Iris has been on the negotiation team yet. Jim has for a couple of them. Rich was on last year, or last round. I'm not... I'm just suggesting that you may want to find Jim or Rich might want to do it, too. I just can't believe it's been three years since the last one. I know. Since it was just yesterday. Yeah, I know. Yeah. And one of the things I spoke to the chief about is the police union has not had the rep from Boston the last couple times. And I'd like to try, and I ran this by the chief to find out what his opinion was. I'm not sure that we need to have our attorney there initially. You know, if we run into any questions or something, I don't know how the board feels. But it's a costly venture, and there really hasn't been a lot of items that were stickled. I think I was the one holding out for one of the names last time, and the other, Rich and the chief, and the attorney, like, Laura. That's what you're going to battle on. And I'm like, yes, it's not right. But, so, I don't know how you feel about that. If there's anything that we question the legalities of, or... We could still refer to the attorney, but do we need to have them at the table for... Because sometimes it's just set the ground rules, it's the initial one, and then do the dates. Do we really need... The ground rules are the same every time we meet. And then to initially see what they're looking for. Do we need the attorney to pay the attorney to drive here, to sit there in that, or what do you think? Yeah, I mean, I went through two of them. The first one was with the rep from Massachusetts, and we definitely needed one there. Yeah, with him. And then after that, I felt the next one was, because they didn't have that rep. They did it themselves, whoever was very reasonable. And I think it was, in our best interest, everything went smoothly. And then when you did the next one... The rep wasn't there either. That rep wasn't there. But, you know, the police have come. They don't ask outrageous demands. And I think, if... I mean, if they come in with something that we don't understand, of course we should talk to our lawyer. But other than that, I don't know if we need it at this point, you know? Yeah. The only thing is, they're trained at these meetings, well, they talk, they know how to present our point of view, because they're trained to do that. We don't have that training. That's the only thing that I would say, that it's good to have them. Because if you remember, when we meet with them, it's usually our attorney that speaks. We talk, we, you know, but we come up with opposition, and the attorney is the one who presents it. And they present it in such a way that it's, I don't know, soothing. And they have a presence that I don't, I'm not so sure we would, if it was discussed. I could see that with the employee union, because, and it's not the employee, so they don't say two words when they're there. It's the representative from that union, who's always there. She's retired now, but she had a protege at the last time, and so I'm not sure what to accept from that person. I would, yeah, I would definitely... But if they have one hand, then we definitely want to bring our attorney on. If they don't, we try it. You know, we're giving up a little bit, but it costs a lot, so. Yeah, and maybe just start it and then see where it goes from there. Yeah. Something different. But with the employee union, because they always have a rep there. I would say definitely. I know last time we didn't do this, but should we talk as a group to come up with what... the board will accept as an agreement. You know, for instance, if they're looking for 8%, I'm just throwing a number out, and we agree that we're not willing to go above 4, then our representative knows that we have a number that we're looking for to go either 2 or lower. because that's what we used to do. Because that's what we used to do at the school. We would practice beforehand and come up with this is our max that we're willing to go. So that when you go into negotiations, you know what that is. Should we do that? I mean, it doesn't hurt when it comes to, like, cost of living, all the other things. You don't know. Yeah, you won't know until we reach an agreement and then it gets brought to the board. Correct. But at least cost of living. Well, if there's anything else that we're looking for, for concessions on, and I don't know what those are, if anything, but would it be helpful for us to do that? I think it's always helpful, especially for the board rep. Right. To have. I'm pointing to Iris. I'm pointing to Iris. Not to the board rep. She would probably appreciate that. I would. Definitely. Yeah, and then we have, we try to make some changes that we find that's difficult to work with, you know, in the whole scheme of everyday life with payroll and stuff and changes to the contracts on those types of things. But, and they don't always go through, because sometimes the little things are the sticking parts. Yeah. So, yeah. Well, if we do decide to meet, maybe we should, maybe the chief should be at the meeting as well. Did you do that in a non-public? That's a non-meeting. It's not even a non-public. It's just a non- I was in a non-meeting. Well, only if you have an attorney, the attorney, if you're meeting with the attorney. But if you're talking, if you're doing negotiations, you're talking about negotiations. I thought it was a. It's a non, there could be a non-public. Okay, it could be a non-public. Yeah, every time we did it with the school, it was with the attorney. And then it became a non-meeting. If the attorney has to be there, then we can't. Well, you can still have, I mean, you can have the attorney there for that meeting. But why? We're not going to have them for the negotiation. Why have them for that? True. Whatever we want. You can write your number on the paper and slide it down. The nice part about this is that we're not dealing with huge numbers. You know, with the school, you had the teachers, you had a lot of people, there's a lot of high salaries, so the numbers are big. Here, we don't have that many. We only get, what, 18? Yeah. And the salaries aren't huge. And there's only so many things to negotiate in that, you know, we have the benefits, insurance, and stuff like that. It was the cell phone that was we went through the last time. I was holding out for that dispatch cell phone thing. Yeah. It was a phone number, but it was the principal. The principal, yes. We could schedule that as a work session, couldn't we? Oh, absolutely. Or if it's non-public, then it would have to be a non-public work session. Yeah. Yeah, I mean, you just open a public meeting and go into non-public. We could do that other than a night. Would that be done other than a day that we have to have a meeting? Or do you want to do it? Whenever you want. Okay. It's not going to be... Yeah. We could do it at the end of the meeting. Yeah. Or if you want to start another day, I don't care. My whole day's free. I'm retired, so... I'll probably be able to make it. Okay. When does that start? I just got the request, so I don't know when... All right. So when it gets close, we'll schedule it. I mean, do we need to deal with this? No, I can schedule that meeting. Normally, so that's... Normally, I meet with a taxpayer ahead of time. Okay. But I could certainly set up that request for non-public with the board at the next meeting. Okay. That's what they want. Who do you need, Laura? I was just going to go give this mission. I think they went outside. Thank you. They're ready for you. You guys are off the... Are you guys on set? No. Good evening. Good evening. Well, is this new device here? It is. Does it work late? It's got you on it right now. I don't know. Things are moving up and down. The lines are going up and down, so... I don't have a text message. I'm just going to call you something else. So we're here to talk about a few different items. And I think Dave is going to start. We have two more. Oh, I need one more. So this... The first sheet here you see is a screenshot from the cover of our sewer asset management plan. And it shows the scene that we're looking at next. And the red indicates it's the worst of the worst on the sewer portion. So you can see it comes down church and then takes an easterly bend towards School Street on Myrtle. And then these smaller blocks are in yellow and they're nothing great either. As far as sewer goes. Which is how you worded in it, don't you? Yeah. Well, a lot of these are cracked of vitrified clay pipe. So they have a joint every three feet or so. And they're leaking a lot of groundwater into our system. And that's what our goal is, to try to get rid of that instead of conveying that and treating it down at our plant. So the following sheet shows two scenarios. We've got, if you look on the top row, it says Scenario A and B on the right. And Scenario A and B only includes for Church Street down the Myrtle. And then a brief leg over to the stream there from a stormwater perspective. Because we expect that the stormwater will probably need to be treated and then discharge of that. What's the name of that stream? Mott Ashbrook. Mott Ashbrook. Which is on Myrtle Street Extension. As you go down the hill to a highway barn. That's where probably the stormwater would have to be released. So now looking at Scenario A, that's only those two streets. There's other side streets there. But this evaluation does not consider the 3,750 linear feet. Only the 2,000 feet required for Church Street and Myrtle. So now when you flip to the third sheet. And it's an Excel spreadsheet. And on the left-hand side of the sheet is the town's projected costs and contributions. And on the right is Hillsborough Water and Sewer Commission's costs and contributions. On the far left-hand column, you'll see dates extending from 2025 to 2030. And I included an inflation factor of 4% per year. And then you can see it's compounded every year. You just keep adding on to it. Because inflation will eat away at our project. That's the nature of these projects. So you'll see a blue-colored column under the town category. It says annual capital reserve fund. So I started off with $370,000 and then increased it to arrive at, if you'll look in the yellow column, this is the cost to replace the drainage and roadway elements that are owned by the town. Now, on the left, you also see a box. So I tried to match up that accumulated contribution with the projected cost. So they're more or less equal. They're off by like $3,000, you can see. Likewise, I did it the same for the Water and Sewer Commission for the Water and Sewer Elements. And you can see it's a little bit less. Going up to the cost per, if you look in the far left-hand column, you'll see a cost per linear foot. This was obtained from the cost from the Woodmore Park project. It's not quite yet completed, but substantially completed. And you can see the unit cost for the construction portion of it. And that's $307.54 for a drain. Roadways, $363 even. Water is $310.45. And sewers, $315.85. And I use those, and that's how we kind of rolled into developing this table. I've got notes on the bottom here. So the park construction bid in 2025 was used to establish these costs. The accumulated capital reserve does not assume any interest. So when you save it, I'm sure you're going to get some interest from whoever you bank with. And then third, it doesn't include any sort of stormwater asset management plan. Right now, I think, Laura, I think I sent you something recently, maybe a month ago. Right now, there's a plan if you – let me back up. There's a funding source from the state. It actually uses APA funds, but it's called the Clean Water SRF. And it uses – it takes EPA funds, and you can use them for stormwater or sewer. But right now, there's kind of a grant program whereby you can have your sewer asset management plan done. But DES picks your consultant. So you just get assigned a consultant, but you need to file a pre-application by, I think, the end of May. In our experience, for the sewer portion that we've done previously, it's not that intensive. So right now – So what would be the benefit of having their stormwater asset management done? What would that provide? Well, it would help, at least for this next project, to know the capacity of the downstream stormwater components. And future projects. Yeah. Right? Yeah. Sure. As a consultant looks at the – you know, what street you're working on, they'd have an analysis of what's there or what's not there as far as stormwater is concerned. Because right now, I don't think anybody really knows what you have, to be honest. Or the condition. Right. Right. Right. So we need to do this by the end of the next month? Can we apply for it? Yes. Yes. Is it the intent to apply? Pardon me? The intent to apply? No. It's called the pre-application. Right. Right. Yeah. Well, yeah. But that asset management plan is a lot less intensive than the one that we have prepared for the sewer system, which costs significantly more than what you would even anticipate. You would have to consider for stormwater, which is much less intensive, just by the nature of the water. Mm-hmm. Do we have a capital reserve fund already? We have the credit. Well, first of all, the years would have to move because there's no way we could put money in for 2026. That's right. I developed this in December. That was before the anticipation and test the patient before we have a back. That's okay. So anyway, I'll touch on the end of the end, too. Oh, yeah. Over on the, for each category, the town and the Hillsborough Water Sword Commission, on the respective right-hand columns, you'll see two rows of $44,125. So what that represents, we're going to split it half and half. But for the first year, that would be roughly $88,000, and that would get us a concept going. We found one for the Whittemore Park. Once you have an actual plan going, DDS is really interested in helping you a lot. But until you get something on paper to show them, they're not. Every year, we've been applying for the SRF programs, and one of the criteria is, well, have you started in design work? So that's why we thought we put that up, but because it has to be done sooner or later anyhow. So we're going to continue to put the money away, and I guess the timing of the next project is going to be dependent upon your funding schedule, in a sense. Because typically they take, what, three years to, from design and construction, design to construction, and permitting. Actually, we got held up permitting for Whittemore Park for a couple months, maybe three, four months. And that was actually the stormwater aspect. So we're going to do the same thing with this project as we did with the Whittemore project, as we're going to offer the people that are living there the opportunity to connect their sump pumps to this pipe that's going to be used. Well, we're going to install the same, you know, a stormwater system that will provide them with a place to put that water, which is what we did on Whittemore Street. But we're still waiting for you folks to come up with the funding plan, or however you were going to help the folks to make that connection, whether it was going to be paid off, you know, in their tax bill over time, or how that was going to work. Because I think that was one of the things you folks are going to develop, was how you wanted to do that. We want to make an effort, now that all the infrastructure is in place, to get those folks who do have sump pumps to connect to that system. Because right now they aren't connected. It's run to the edge of the road, and they need to make that connection. So if their sump pump was going in the sewer before the project, it may still be going in the sewer. So we're, you know, that's something that you folks would have to figure out how you want to address that. It would be done similar to a betterment assessment. But we need to find out. We need to finalize that. Well, we need to find out, I mean, who's going to, I'm assuming some of them are going to want to make payments, paying it out up front. Well, I mean, at this point, all we can really do is, you know. Have them come to us. Is tell them that they need to do this. Yeah. And they need to talk to you folks. Okay. You know, on how it's going to be done, and whether they hire their own people, or whether, you know, you get someone to come in and do them all at once, which would seem to make more sense. Also, Dan, Dan, what was Dan's last name? I wonder what? He spoke to, I don't know if he spoke to Jim about this. Oh, yeah. He had, they had done similar approaches, but different approaches for various municipalities, primarily out towards the seacoast. And he offered some methods, I guess, of how to implement this. So you might want to go and bug him. Yeah. Yeah. I don't know if you put it out there. Are you, the water and sewer department, going to monitor or, yeah, monitor the, I don't know what the right word is. If they're still using their sump pump in the sewer system, are you going to monitor that to put pressure on them to do it? Yes, but we want to make sure that when we direct them to the town, you folks have a program, if that's what you want to do. So we wanted to make sure that, you know, you have something in place before we start taking action to get them to, you know, connect. Those homes were inventory as part of the original design process. And to our knowledge, there were no, there were no stormwater or floor drain systems being injected into the sewer. But pipes have a way of moving. And, you know, they can be removed and they can be replaced after the inspection is done. So you would have to be, you'd have to, at any point in time when you're interested, you need to investigate, okay, is there an illegal connection or not that's operating? I mean, to our knowledge, those have been terminated at some point. Right. But we don't know what the actual condition is today. And we do know there are many sump pumps that are just pumping outside the house and that goes back in the basement. So those are the two points that we wanted to discuss as far as, you know, the Whittemore Street project, the follow-up on making those connections, and then when, you know, we would be able to start thinking about the next project. Because you really don't want to start design or anything until you know you've got funding to make your way through. Yeah. Right? Yeah. There's another step, too. I think I've mentioned it before. It's in order to gain funding for some of the sources, at least for the sewer, we need to go through qualifications-based selection system to pick a consultant. So we can't just say, our engineer is under with. We need to go through, and I think you folks went through something with the sidewalk project. It would be similar to that. Which is a process we're getting ready to undertake, right? Not until we have some commitment. So we're only doing part of Church Street and most of Myrtle Street for this project. Is the idea to finish it the next time? Maybe five years or four years or whatever that time? Well, the next project could entail the upstream streets, if you will, like Newman and Pleasant and Central, Upper Central. They could. But you start looking at the dollars, and when you look at the linear fee, it just gets, it's almost doubled. So that's why I said, let's just look at these two streets and see how much it's going to pay. And that's what's reflected on the third Excel sheet here. Is that similar to what we did for Winnemore as far as linear fee? That's a good question. I don't recall offhand. I looked at this because this was our next hot spot, if you will. Yeah, you indicated before that Myrtle Street was the next one on your project, and we, at the time, postponed topping Myrtle Street with pavement. So we didn't double up, you know, we discussed that with the highway department. So we were aware of that. I think it was pay. It's just that anyone replaced the stormwater system. And so we recommended a holdoff on replacing the stormwater until we saw how much capacity it would require if we brought the stormwater down Church Street into Myrtle or whoever that was going to work. Yeah. Yeah. There was some of that. Right. Right. There was a holdoff on the stormwater aspect. Right. Yeah. Is the blue on this first page, meaning this is a good connection all the way, we're confident that this is something that doesn't have to be replaced? It wasn't as bad as the red and the yellow. Okay. So Pot of Myrtle is blue, so that means that really, that doesn't have to be done? This was based on our consultant's review of primarily, we had a consultant by the name of Ted Berry, and they did all our aligning, and they got swallowed up by a company by the name of Vortex. But they kept very good records for the most part. And so we've got historical video of all these sewers and how they've performed over probably a 10-year window that we've retained, Ted Berry and Vortex. So that got handed over to Underwood when they conducted this evaluation. I personally didn't look at these videos. Okay. Okay. I'm just wondering. I don't think you can get to the red part without doing some of the blue parts. Well, no, I know that's true. Well, the reason why I asked is because there's not, if you look at Church Street, for instance, after Walnut, there's not a lot of street left. I just wonder whether we should just do everything from the school up to Myrtle. You know, because that small section, if we plan on doing it, say, three, four, five, six years from now, it doesn't make, you know, I guess you do it with brown and Walnut, but I don't know. Yeah, there's a break in the sewer. It doesn't extend down that area. It picks it up farther down the street, just not even half a block. You're talking about the north end. Oh, I'm sorry. I thought you were talking about the south end. No, I'm talking about heading towards the school. Oh, yeah. That there's not a lot, after Walnut, there's not a lot of street left. No. So, and I would think it would make sense for us if we were going to repave Church Street to do all the way down to Brown Avenue or Brown Street and do that one. But I, again, I speak to myself. I don't speak to the board. But then again, if it's blue, it doesn't necessarily mean it has to be done. Well, that's kind of why you hired a consultant, to help you through these. Yeah, well, that's, does green mean it's good? I forgot what the color code mean. Oh. Excellent. We should have copied that and put it on here somehow. Good question. Will, my red is pretty. Red bad. It's the worst. Yeah, well, under the impression that, if it's red, blue, green, or yellow, it's 100 years old. Oh, yeah. More. Yeah. Or more than 100 years old. And eventually, it's going to be needed to be done. Right. And initially, you gave us the indication of the worst. And that's why we picked Whittemore and Park to do first. Right. And the second in line was Myrtle Street. I guess Church Street, but you had indicated to all that before. So, I mean, I remember it. I don't, it's not a surprise to me. Yeah. But I understand how you want to do it. Yeah. Well, we, I think we provided you with copies of that asset management, the sewer asset management. And the engineers evaluated them in different ways. One was condition. One was, if it fails, what's the impact going to be? You know, and so there's several different charts in there that address that. Any other questions on Whittemore or this information? I do have one question. I know you guys don't have an appetite or would like to do a big project like we talked about, you know, earlier. But would it make sense to expand the scope of this project to do Newman and the others, you know, part of Central, but I think it's Central Pleasant, Walnut, the rest of the church in Brown and take a small note. Yeah, maybe it would double the cost, maybe, and just spread the, you know, we come up with X amount of dollars over three or four years. Whatever's left, we finance it for a period of time. That way that whole chunk is done. Well, I guess, again, we're going to continue to, you know, try to gather the funds that we need to do these projects. You folks have got to go to town meeting to finance this sort of thing. So I guess, you know, it's however you think. If you think it's easier to put $130,000 away a year or it's easier to get a bond passed, you know, I don't know how that works when you don't really have a design yet. So you don't really know a scope. Well, we have to do a design. I mean, first we'd have to agree on the scope. Then we have to get a design and a cost estimate. Then we move forward, I would think. But if you're looking at expanding the scope, but you don't know what number you're expanding to. Well, no. Or you can go and say, this is the number we need to get the voters to approve. And then the scope is automatically set by the ultimate design and construction estimate. True, but I mean, it's a chicken egg kind of thing, but to try to. I just try to think down the line and, you know, if we're going to do half of this section now and then three or four years from now, we're going to do the other half. It doesn't make sense to do it all because economy is a scale. You know, it would be significantly cheaper if we did this whole block at one point. Because you're going to have the construction material there. You're going to have the people there. You're going to have everything there rather than do it twice. Absolutely more efficient. Yes. But again, we don't know until we figure it out. And I guess my question is, how difficult would it be to increase, to do this and do the rest of this section? How much work was it to do this and how much work would it be to do the whole thing? Work meaning design work or construction work or both? No, what you did, like expand these two sheets to include Newman, Pleasant. You could probably do it right now. You got a calculator? Yeah, you already have. You just take 350 over 2,000. What is that? And you just multiply that times each category. We don't have the length of these three. Yeah, we do. It's on the second sheet. So it's not quite double, but it's going to be significant more. Okay. What I had to go and do is, if you'll see on the second sheet with the street links, we've got features here. And it's kind of hard to, we don't have a design sitting in front of us. So I looked at, you know, how many curves do we have, how many sidewalks do we have, and that kind of factors into how much the roadway costs are going to be. The water and the sewer, they don't care. So, you know, our costs are kind of, they're not fixed, but we need to replace the whole name to the next intersection and then tie in there. I mean, I guess my answer to your question is, you know, it depends on your confidence in being able to get the voters to approve a larger bond or whether you're better off, you know, putting aside a certain amount of money every year and doing it, you know, on a little smaller scale. And I really can't speak to whether that's going to be successful or not. It's up to, you know, I'm not against it, but I don't think... My thing is that if you get a bond, you're going to have to pay off the bond before you can do another project. So you might end up doing this project and not doing another one for six years, rather than doing one every three years. But if you do double work, it would take you six years to get it done anyway. But again, I don't... I'm not saying that we would take a bond for the whole amount of money. I'm saying that we would start accumulating money like we are when we... When we started, we would, instead of having, what, what's this, 15... We'd need the $1.5 million, we'd need about $3 million, would have $1.5 million, and we would finance $1.5 million. So when I'm talking a huge amount of money, I mean, compared to $20 or $30 million to do it large, I mean, we're talking a relatively small amount. There's one, I guess, funding mechanism we haven't really talked about, but the Clean Water SRF funding from DES and the Drinking Water SRF project funding source from DES typically have some percentage of forgiveness, which is kind of like a grant, but you can't really depend on that until you have a design sitting in front of you and your consultant approaches DES and says, how are we looking this fiscal year or two years out from now? But you can't have those conversations until you have at least a concept plan and a consultant help you with this. Yeah. He says maybe part of the answer to your question is to come up with some portion of these engineering funds. To get the concept initiated for the overall project that you're talking about. Come up with the engineering funds so that we have something to start with in terms of application for grant money or loan money or decision-making just on our part as to, okay, we have the beginnings of a design and based on the preliminary cost estimates, we can't afford it, so we're going to scale back the scope of our work. So maybe it starts with putting together some of these engineering funds that are estimated here, expanded by basically doubling the project. But to give us a starting point without yet having to start collecting funds, either capital account or starting to think about bonding, start with the engineering or the beginnings of the engineering, which probably is a concept plan. My thing is I'm confused on it. If you start and put money away for three years and then you take out a bond and you make payments on a bond, that means you're not putting money away for another project. So until that bond is paid off and then you go back to collecting money for three years to start enough, you're talking six years between projects. That's true. So you're going to go back, I mean... I know you're going to have a larger area done, but then it's going to take you six years to get over to another area that needs to get done. So it's going to take you six years anyway. I mean, assuming that they do... Assuming we go with your original plan and assuming that the next area would be to finish this section, well, it's going to take you another three years. So in six years, this would be done. And if we'd bond in six years, it would be... I mean, time-wise, it would work about the same. Well, I guess... Again, my response is sewer and water is going to continue to put money away. Okay? Right. If you folks want to try to address this problem, then you folks need to decide how you want to fund it. I don't think, you know, asking us, do you want to join you with a bond, do you want to do this and that. We're kind of putting the money away and we're trying to move forward. If you folks want to fund it a different way, I think that's a decision that the selectmen need to make. Because you're the ones who are going to go before the voters. So what's going to happen is you're going to have put money away for three years to do a project and we're going to be putting money into a bond, which means we can't help you with that project until that bond's paid off. So you're going to just keep accumulating money. Well, it's fine. We're going to... Well, I mean... Okay, let's assume that we decide to do what I suggested. Okay? And we put money away for three years. You guys put money away for three years. And you have enough to do... Our portion. Your portion of this Myrtle Street and Church Street. How would you fund the rest of it? You wouldn't keep coming in with the bond with us? Well, I guess... Well, we can't take the bond out anyhow. No, we take the bond out. You pay half, we pay half. No, but if we've already saved our money in the meantime, we don't need to. But you're only going to save half. What you're telling me is that in three years, you're going to save almost one and a half million dollars. Okay? But if we go with the whole section, it's going to cost almost three million dollars. Oh, I see. You're not going to have the other one and a half million dollars. So you're going to have to get money somewhere for that, just like we're going to have to get that one and a half million dollars somewhere for that, too. So, I mean, hypothetically, yeah, you've got a great idea. Let's do it your way. Okay? Does the rest of the board agree? That's what I need to hear. How much burden are we putting on the taxpayer? And in the same term, how much burden are we putting on the users? And can they absorb? I mean, I don't know, you know, how much you can put away every year with your current fee structure. And I know they've been going up, but, you know, same thing, how much can we put away to hit the taxpayer every year or for six years or a bond payment? You know, once you take a bond payment, you're kind of stuck. You're going to have to pay it back. Yeah. You know? So for the number of years of the bond, you wouldn't be putting money away. You'd be paying half the bond. So everything stops. Nothing gets done until that bond gets paid off. True. I don't know. I don't know. We've also, we've highlighted the worst segment of the village area. That's the segment we're talking about. We've done Park and Windmore. Now we're talking about the remaining worst section. So, you know, the fact that we wouldn't do another project for six years. I'm just asking a question. I don't know whether it's good or bad, but I just I don't think I can answer your question. I mean, it's, I don't know. Can I make a comment from somebody who's not involved? No. One of the things that my concern is, and I don't have a concern, I feel this is needed. My concern is the money part in, you know, as we sit here and talk about it, there's a whole nother budget that goes into the same day of voting for this money. And I think a bond is very difficult to pass no matter what the project. You need to do a lot of outreach to the public. I think even putting money away is going to be, could be difficult as well. So, and your reserves are included in your budget work, correct? So, they, their money is going to come in because if the users don't pay, we pay off the liens. So, and then we collect on those liens. So, there's, they don't, they don't have the same dilemma that we have. And I'm not, it's not being critical, but just the structure of the funding. I think that this question can't be answered right now even by the board. You may want to do it one way, but I think you need to get a feel from the public. And if that means right now we have some public hearings on this because you need to know which way they're going to, you get a feel of which way it's going to go at a meeting, whether it's setting up a capital reserve fund with substantial amounts going in every year versus a bond. I think in my opinion for whatever it's worth I think it would be easier to do a capital reserve fund because again you're earning the interest as they had mentioned versus paying the interest. It doesn't accomplish what you're looking for Rich but I think it's an easier swallow for the taxpayers to say well you know maybe we'll do it because I think that's a hurdle in itself because there are some taxpayers that feel it's I'm not on water and sewer I shouldn't have to help to help pay for this in my taxing. I think it's better it's easier to spread a cost like that across and this is road work so then you have to kind of push that maybe it's an increase in the road work budget versus you know because the town is the town taxpayers who are not on water who are not paying for the water and sewer infrastructure or sewer infrastructure to say it's the road work and the drainage for redoing that road so I think that there's a way to explain it to the public to understand that this roadway these roadways need to be done anyway we're combining that with the sewer project you know all the discussion are that we're going to we're going to go in on the sewer project but our portion is really the roads and drainage we just it's just more financially feasible to do it together and efficient and without the storm water we cannot eliminate the infiltration right without a place for people to put their water unless you want to pump it into the street which some people do and in the winter time you can see it's running down the street and we have a whole different problem right so you're almost saying that because this is road work we could take that half million dollars that we have for road work every year and we could designate these streets or the streets that we're going work on work on while we do this project so that we wouldn't have to raise an extra 1.5 million dollars we could take some of it out of our road budget is that what you're suggesting is that what I'm hearing I think it's the same yes I think it would there would be value in sitting down with the road agents to start talking about this but I think that it's one and the same I don't think that going before the public is saying we want to take out a 3 million or 1.5 million dollar bond to help out with sewer projects because that's not what we're doing we're combining our road projects and because then if you if you present it that we're we're helping them pay for the sewer and I won't see us and them but that's where you get that resistance when we have we have to do road projects anyway and it just makes more sense to do it together while they're doing their sewer projects that's true so whether or not it's you know we if we raise $550,000 a year for the road project maybe it's time to put that in a capital reserve fund each year and sit down with the road agent and say okay we want to earmark $300,000 for this project you get the other $200,000 and it's tight I don't know but you'd want to sit down with the road agent first and say okay give me your list as far as these are the worst you know and do it like that versus I think it gets too complicated to talk about the bonds before as they were saying the engineering work and then if you spend money on a whole plan and find out that you can't get a bond or you can't get buy-in from the public because they're focused on the sewer aspect of it when our portion is the road and stormwater which we would have to do anyway I think it's going to be a hard sell anyway to get $370,000 as a separate warrant article on top of everything else I would agree and I'm not suggesting that we go for a bond next year or anything like that I'm just suggesting long term again just because I thought it may be it made sense but okay the other factor to look at is as far as voters no criticism of the highway department but I think when you do a project this way you're getting an engineered street okay with curbing and the sidewalk and I think you're getting the infrastructure is a lot better in terms of the material underneath the road you know typically what they do is they're basically resurfacing you know they grind it up and then pave over so I think you're getting you're getting a better product for your money I think it won't see catch basins up in the middle of the road anymore it seems you I think you all agree you have to do something if you don't the whole system collapses it costs you a bucket more rich has got a good idea that it's more efficient to add and double the work the bond forget about the bond you never pass a bond and it's non-economical Iris is right you pay all the interest your decision is pretty simple do you want to go with the proposal they're making and ask the taxpayers for 1.5 million over 5 years or do you want to ask them for 3 million over 5 years either is a tough pill to swallow but look at the last town meeting inconsistent people come in bitching about their taxes and then pass an 11 million dollar budget fire trucks everything not a comment if they heard this discussion tonight they would pass $300,000 a year for 5 years to do this because it makes common sense and it saves taxpayers money in the long run obviously the voter outreach is the key because they are getting not just a resurfaced road you're getting a reconstructed engineered road new sidewalks curbing there's a public benefit that could be expanded on and disassociated mostly from the water sewer and sewer work this is incidental so we care about what we're trying to accomplish but it's incidental to the discussion that you need to have to get those funds authorized to be put aside another capital but in the other aspect that you don't want to overlook in terms of the sewer is that the sewers that we fix creates capacity and we were told that we need more capacity and we're not going to be building a new plant anytime soon so the only way to generate capacity is to fix the system and it's clear you know when we get rainfall the flows triple at the treatment plant so you're creating capacity at the same time maybe not immediately but it's got to be fixed yeah oh without a doubt it has to be fixed because it's just going to get worse and worse and like I've said before this should have been done 50 years ago but here we are we're in the situation we're in we committed to the wheremore and and what project Park Street project we made that commitment and at the time as the poor we should have been putting money away for the next project and we haven't done that right we had offer money we had money before that it really didn't hit the taxpayers hard that project but in this scenario you're going to say you want $350,000 for the first year to put in the capital reserve to be used three years down the road and that's to me that's going to hit the taxpayers pretty hard you know and all that's going to happen and as far as using the road work you've got a lot of roads in town that are in bad shape and as long as I've been involved with the board the highway department has been taking the worst of the worst doing what they can on a basis you know this road this year this road next year and keeping up with it and it's worked out pretty well not to say you know these yes you get a better road but these roads are not in disrepair so as a taxpayer or you know trying to put this out there you say why are you fixing this road there's nothing really wrong with it and my road is you know falling apart so that part of it I mean it's hard to convince them that yeah you're going to get a better road but those roads downtown are not horrible you go on some of the other ones and they're in rough shape and you know we hear you know all the time you know we're going to do our road you know beard road to start with you know it's going to get done this year you know so it's a long term you know commitment but to try to sell it and to get that money out of the taxpayers you know it's going to be tough same thing get the money out of your users you know because you're going to have to come up with that money also so you know and you know it's a user fee but they still got to pay their taxes you know I don't have to pay technically I don't have to pay I'm not on the system so I've got my taxes you're on the system you've got your taxes plus you have your user's fee so you know that's something I think to take into consideration yeah but if we took our road the road article and increased it so that they could still have the money to do the repairs on some of these roads and put away this I mean they dug up my road I don't remember when 15 maybe 15 the thing is like I mean it doesn't do any good if you don't get those big rocks out of it or anything else I mean I've got a big crack behind my driveway water runs down the street goes in the crack where's it going it's washing out the road at the other end so if you could put in more money because if you put it in a capital reserve wouldn't the highway department be able to use some of that for that year yeah I mean as long as it's for that perfect right rather than having two articles is what I'm asking yes you could well you'd have to start right and put it into a capital reserve right but I mean instead of having an article that says $250,000 to fix Jones Road this year and $300,000 to put in for Myrtle Street you could combine them into one and put it all in the capital reserve and then let them out there $250,000 right okay well this is $500,000 for road repair right $250,000 is going to go into capital reserve for the project so you keep up with your road repairs because that's going to you know whatever I forget what it is what is it $400,000 or $450 they ask for this year for road repairs and that cost is going to keep going up so you know not only we already put $500,000 for the road repair we're going to have to put $800,000 to put money away in the capital reserve it's just a matter of how you're explaining it to the taxpayers I was just trying to figure out if we could do it all in one article rather than right but why wouldn't you just have one capital reserve fund that's a word right but Jim was just saying half and half I think that if you've got I mean we should have a list of the roads and we may anticipate those are going to be done and we should have that because then it makes it easier when we talk about these projects to say okay right now it stays fast it's estimated there's this much you know needs to be done on street A and so this year anything do you put 450 or 5 I think it's 450 I thought we have to support didn't we yeah we have to 5 did we ask for more no 450 so even you know we brought it up to 600 and this is part of that explanation but now we want to put a capital reserve fund well that we do it for a two year period because we don't spend all that money in one year right now so meanwhile it's sitting there it could be earning interest and so all that interest adds to what we aren't going to need to ask the tax payers for but and if he only uses the 4 instead of he only uses 425 instead of the 450 then we get 25 to leave it in there but that's up to the board to sit down with the road agent and say we are going to allow you to spend this much this year because these projects are however you know I don't think it should be well no no I just not like for the article this year it's 450 but what happens if this cost actually come in at only 425 then there's 25 that would be remaining that would stay in the capital reserve right right but yeah right I don't think there's going to be any left over the way prices are going now and I'm I'm hoping it stays they can do what they want to do with the 450,000 if the increases in material now you know changes you know they had planned to do X amount of miles and if the prices increase well we can't do that far we have to scale back and this is to use that you know but if you want to ask if you start with 450 and say okay we're going to ask for 600 that's a third of the additional money that you need right it's not enough right you're going to have to make a pretty good size ask each year in order to accomplish this just based on what we've looked at right for this Myrtle Street but my thought was if they upped it to 600 let's say and said okay but of that 600 we're not it doesn't necessarily mean 450 will go for the roads and then just the remainder you know that's a determination that the board will have to make but it's you know because if not then you play with you can only have it last for two years it's got to be put into something that can roll over each year I see because you can reallocate it because if you don't use it within those two years it goes into the general fund and you can reallocate it out of the general fund that's another warner so yeah but so the bottom line is for our next budget which would be for our 20 20 2026 budget we would have to come up with we'd like us to come up with 24-125 for the engineering and 370 we're to stop squirreling money away for the project is that correct? well that would be a start because the population's already eaten away at us but that would that's those are the two numbers we're shooting for last December it was yes last December well I think they're they want you to come up with they're saying because this is what the town's portion would be right right so it's up to us to figure out how to get that how to get there by that time yeah right but I think you want to do the engineering sooner rather than later you need to so that would mean at least that money would have to be in our next budget yeah and if we're smart we'd probably be putting some money away for this project well yeah and they get the engineering done so you can when grants come up you have that to apply the grant that's what I did get that from tonight when we got this housing champion you guys weren't here they said there's money right now this year the state didn't have any more money to put towards the housing but he talked about infrastructure money and everything else and it all comes up what is available to get grants for and if you don't have the engineering and the plan it's going to be hard to apply for the grants I mean you know it's a small portion but it was a light at the end of the tunnel there's going to be grant money out there and being designated as a housing champion it gives us a foot up on other communities that aren't that way so it seems to make positive effects for us you know being this you know I mean I knew this was happening I mean the planning board I knew it I just hated for Robin to run out so quick because she did most of the work in obtaining this this thing and the planning board has done a heck of a job going forward with all this housing and changing the regulations and looking at them all made a conservative effort to do all this and what I learned tonight that this gives us it gives us more than a feather in our cap it's it's you've got a little bit of push on the list when you start asking for money grants and stuff down the road but you need that engineering you definitely have to have that to apply for the grants you know there are more grants on their side than our side no I think they have they have a harder time obtaining the grants because of the competition yeah we always seem to end up at the bottom all the state money for water when it comes to Hillsborough has been going to Emerald Lake so they have more problems than we do yeah we have two other aspects to talk about yes the first one is the associated electric property so the building is down what we typically require when someone takes the building down is that they sever the sewer connection and cap it so that we don't have any water coming from somewhere else whether there were floor drains in that building or whatever okay so what needs to happen is ideally I guess the town has a backhoe we could schedule a time when our personnel could meet your personnel show them where to dig they dig down we cut the pipe and cap it and take measurements to it and then it's disconnected and that way when someone wants to do something with that property we would be able to show them okay this is where you need to start digging to tie back in now if the town is the one that does something with that property are we going to have to pay to have that reconnected or we well you're going to chances are if you do something with that property it's not going to be I don't know whether the building is going to be in the same spot as that building so you'd probably be replacing the line but you're not hooking into the main it's dug on your property right so you're going to have to dig to that anyway so no would you pay a fee no the connection would still be there yeah I don't know I just wanted that in a minute I don't know if the connection would be sufficient for whatever your projected needs are that's not a side question that's up down the road yeah right what do you mean the diameter of the pipe yeah it might need the building might need fire protection might need all kinds of things you know beyond what the existing connection could abide well there would be a fee to have an increase but right no that's your cost right but then there wouldn't be a fee on top of that I wouldn't think so because we already have a connection there right right so as far as like the cost to increase capacity if we need increased capacity I just want to get a cent right up front even if I'm not here when the building goes up remember back in 2026 when that question was asked we just have no idea how much piping is in the ground and how much water could be coming through that piping you might have introduced the solar system you just want to terminate it so that whatever's there is not an issue you might actually have a bigger problem trying to deal with the storm water yeah aren't we dealing with that whole storm water thing on the other side of the road with that side well see there's not too many culverts crossing underneath that portion of West Main Street really there is one right from the property yeah right right by the cemetery there's a catch basin in there and it goes across so that's one thing you want to talk about the office second floor oh second floor of the office yeah our office yeah we have an office now apparently hey and so there was two concerns the principle being securing that side door so that we don't have an event such as the one that precipitated the damage that was incurred with the door being left not quite secured or partially ajar whatever whatever and we want to make sure there is an entrance through the front door to the second floor so it's not that we want to exclude access but we want to make sure that that side door can be permanently secured and the other related to that is the condition of that fire escape I think that should I think that's a huge liability potential liability and that it should be blocked it's not being used it's not there's no habitable space on the second floor that would require that second entrance I don't believe don't they have access to the second floor from the front door that's a hazard that it's just inviting a problem it seems to be it should be at least minimally blocked with a chain and a sign that says stay away or something so there's a side egress from the first floor a front egress is there a back no there's a bulk hit in the back it goes in the wrong direction you wouldn't even need that because like you said it's not being it's not being used well we just we just want to make sure it doesn't happen again I agree and being down there I sort of thrown this idea out of draining the heating system why does it need to even be heated why are you paying for heating it and being down in the basement I noticed that there were I think four either four or five circulator pumps which means there's four or five zones which means that that could be isolated drained and you're not paying and you're not paying down as a pain unnecessarily to heat it in a building that who knows what condition any insulation might be preventing but that's secondary the safety has a helmet of securing the door and I think I would recommend marking that fire escape access probably makes a good deal of sense it was it was it's a metal fire escape and the posts were in concrete but I think the one at the corner you can just you know it's not attaching it's in the air it's in the air well I think if you put weight on it it gets I mean it hits it as you fall down to the floor yeah the floor is securing that door yeah you know so if you know they can use the front door and get to the upstairs yeah yeah but not making it inaccessible so I have no idea what she knows it where did that finish I just assume it'd not be used especially if we're going to take out the fire escape I'll talk to you more I'll find out how much they're using it I mean frankly the fire escape could be repaired well it could be yeah but if you're not in heaven oh it's just the footing is that it's just the footing yeah but the structure itself is there but without you know being supported on something yeah or else right like the fire chief we don't need it why have it I think it was up there because they were using oh yeah no it's an necessity it's occupied the kids were up there and right well I think it was there long before the town took the building yeah and it's salvageable but that means spending some time not that far escaping I don't think so how did the concrete erode so quickly I mean it's been a while but I don't think it was there when we took over the building hmm really oh when we took over the building yeah was it there oh I think it's been oh I think it's been I think it was like for years it was the one they had a school it was in the building for quite a while yeah but I mean yeah because I think project lift was in that building a long time when it first started I think project lift was over there yeah but anyway I'm not sure we kind of we consider that now that we use it for an office as a commercial building and I'm not sure I'd have to check with Mike that you should have a second egress out of a commercial build yeah but we're not using the second floor no not the second floor even the first well we do we have multiple there's two you know you want to secure that no no no you have the one on the side right the one we want to secure is a bottom that's the one that opened and froze and that's why the office got flooded oh that one up there that's why they were using it to access to store stuff up there oh somehow it didn't now it didn't get closed or something or the snow got in the way and the pipes froze so our offices got flooded oh okay so we're not we're not eliminating ground floor access it's just that access to the fire escape yeah and now we don't want to eliminate it we just want you know shut bolted shut or you know whatever yeah something so it's yeah a dead boat from the inside with no access available outside yeah and if you did that you don't need the stairs yeah I mean that's securing the door from the inside if you want to spend a little bit to put another post another concrete post under there some excavation I mean there's nothing wrong with the soft fireworks the gate except it's not attached to the ground yeah I mean we're very happy there oh I'm very grateful to have a place to offer so I guess that's it that's it I think we're forever representing so should we go ahead and coordinate with Ernie yes that would be great as far as disconnecting the sewer to the associated electric oh yes definitely yeah all right that makes sense I mean we can hire somebody you know if you're willing to have it we always want to save money yeah but when they threw down the building didn't they cap the end of it somehow they didn't do anything they were thinking they were all over the place there was more drains or who knows what's in the ground we just want to make sure this is still open we don't know we don't you don't know the foundation is still there right the concrete foundation we're trying we're trying we're working on getting that yeah so we have a brownfield application and there's more work to be done but that doesn't mean that the pipes that went to those drains they clear it off and they smooth it out they're not going to do anything to the pipes right well you're saying we cut it off here wrap it all this whatever was there you don't have to worry about that's right it's all going to go away and put a building there so yeah nothing to do with sorry we're a parking lot and do you cut it away right before it gets to the street cut the right away cut the right away yeah it'll be on you know inside your property so you have to dig it up and cut the pipe and put a cap in there is that how you do it yeah it's not a complicated thing it's easy peasy it's just right we need permission to do it number one we'd like to have the time to assist what about water does that shut off too or is that a problem I don't believe it's shut off typically you know you have a shut off at the edge of the road or somewhere between the main and the building and I'm pretty sure that's shut off okay because they needed water to do the demolition and they had to hook up to a hydrant nearby because the water was shut off because you guys would shut off the water yeah well they couldn't access the water in the building while they took it down you know right yeah outside source so assumption is yes we shut it off prior to all the demolition all right until next time thank you for coming thank you thank you thank you thank you have a good night make a motion to adjourn all in favor aye adjourn at 817 yes yes