NH Muni WatchStatewide meeting record

All towns · barnstead

Selectmen's Meeting - 9/15/26

The Selectmen approved minutes from September 1st. SPEAKER_1 signed a lease agreement for a 10-wheel package purchase, costing $283,000, under $312,000 bond authorization. The board approved $138,950 from the FEMA balance ($449,248.74) for Narrows Road excavation and a DES permit for 342 Narrows Road. A $2,337.97 quote for a replacement town hall door, including hardware, was approved. The board authorized purchasing trusses and roofing materials for a ConX box roof for $24,524.69, to bid installation separately. Upfitting costs for a fire utility truck exceeded the $66,000 budget by $952.50; discussion favored using the operating budget over the expendable trust. Engineers are reviewing drainage at Damsite Road, White Oak Road culvert, and Narrows Road guardrails. No proposals were received for the highway garage. The board acknowledged a FEMA requirement to update floodplain zoning ordinances via warrant article. Two highway positions remain open. Source: https://www.youtube.com/watch?v=xxyXflQFQoc

Video

Oh my goodness.
Good.
>> So you take
Call the Barnight Psych Board meeting to
order 601. Stand for the pledge.
To the flag of the United States of
America and to the republic for it
stands one nation under God indivisible
with liberty and justice for all.
>> Everyone see payroll manifests.
>> Yes. Yes.
>> Yes.
>> Has everyone seen the minutes of
September 1st?
>> Yes.
>> I'll make a motion we approve the
minutes from September 1st.
>> Second.
>> All in favor?
>> Has everybody seen the lease agreement
for the 10-wheeler?
>> Yes.
>> Yep.
>> Any questions on that?
>> No. No.
>> Do you need a motion to sign that?
>> I do.
>> For the chair design.
>> Make a motion
chair to sign the agreement for the 10
wheel package for purchase
>> in the amount of $283,000.
>> Yes.
>> Second.
>> All those in favor? I.
And just so everybody's aware, that is
cheaper than what the warrant article
was. So,
original warrant article was 312,000 is
what it was. So, the payment will be
$63,8747.
Everybody see the veterans credit?
>> Yes.
One excavation tax levy,
two land use changes.
Get that
under new business. The invoice from
Earth for Narrow's Road.
>> Any questions on that?
>> No. So, the invoice amount was $138,950
and that all comes will all be coming
out of the FEMA balance
>> that we have. So,
and just in case somebody's curious, the
FEMA balance is 449,248.74.
So that balance, we've been trying to
take care of some of these FEMA projects
on our list with that money.
Okay. Has everybody seen the dees permit
for 342 Narrows Road?
So
over there,
that resident is repairing an existing
retaining wall is what that dees permits
for.
And then under new business, I'm going
to add the town hall door quote. Has
everybody seen that?
>> Yeah. So, this door over here that we
everybody's been having issues with. Um,
Fab's been having a hard time trying to
get the handle. Ultimately, the door
itself's drafty. There's some issues
with it. His recommendation was to
replace it. Um,
so a brand new door, just the door.
That's it. The quote we got was $2,000,
$2,337.97
for just a door. So that is Yeah,
>> includ
>> that. Yes, that includes the breaker bar
in that too. So everything um
is a I mean it's not really a house
door. I mean it's you got to think about
it. It's commercial use. So um but so
that that does not include installation
with that. So we're trying to hopefully
purchase the door to save money so we
don't have it get marked up on us. what
we're trying to do. So, we haven't
officially purchased it yet.
Um, does anybody have any questions on
that?
>> No, but I will make
to purchase the door.
>> Yep.
>> In the amount of
>> $337.97.
>> I'm sorry. Two.
>> $2,337.97.
That's all the hardware, everything.
>> I'll second the motion.
>> Oh, did finish it yet?
>> Okay.
All those in favor?
>> I I
>> Okay. Old village business, we're still
working on the rules rules of procedure
there.
um updating them
attorneys reviewing them all too as
well. So
Narrow's road update well that is
completed
that project is completed there. Um
we are waiting for a a quote for
guardrails that was not included in the
project.
So, that was pointed out after the fact.
So, there are Jersey barriers up right
now at the moment, but we're there's a
couple other town areas in town. Um,
we're waiting for quotes for guardrails.
So,
and just so everybody's knows the areas
of Koh's ledge road, the project we did
last year, the guardrails never got put
back up. So being a FEMA project, if
FEMA came through and saw that they
weren't there, they could potentially
make us pay all the money back. So
that's why we're getting a quote to have
them put back in Narrow's Road. It
didn't specifically say to have them,
but it makes sense to have them over in
that area. And the other one was
Sarah was getting a quote on was White
Oak down by the town beach, that culvert
there, um where it's washed out a few
times. So,
and then under old business, I'm going
to add the fire utility truck on that
has everybody seen
uh about the fire utility truck and the
price after it got done being done
upfitted.
So
ultimately the board had approved
$66,000
for the truck and a fitting. The truck
itself was 56,000.
I think it's said $810. I think I wrote
down
>> 70.
So $56,870
was for the truck by itself. The
upfitting
was $10,82.50.
which puts it over that what the board
approved for $66,000.
My recollection was the extra $952.50
we were going to find somewhere in the
operating budget, but the fire chief has
expressed concerns that he he doesn't
have it in his budget. So, how does the
board feel?
>> Where does the fire chief want to take
it from?
>> The expendable trust.
I
>> think if he has money in his budget, we
should allow spend his line.
>> I think he needs to take a little closer
look.
>> I I agree on that one. If there's if
there's the money in the budget for
that, I'd rather pull it out of the
operating budget than the expendable
trust honestly for that to me that
little amount I will say in it compared
to everything else. So, um, but I think
that's doable. I think we can manage
that amount.
So,
>> the other option,
there's a cup holder in here, dual cup
holder. We don't need that. at $73.
>> I mean,
we can start going through this line
item if we want.
>> We can unfortunately
>> has he has an arm rack we don't need.
>> Unfortunately, it's all done and all of
this was done before our current fire
chief.
>> So, I I know. So,
I don't know why it took them so long to
invoice us though, but we got the
invoice. So,
North Bared Road
update. I'm going to actually
combine this with just the engineering
projects itself there. Last week, Sarah
and myself met with both engineers
actually. Um,
the first
area we met was White Oak Road in the
area of the town beach there that cover
that keeps washing out over topping at
times.
So that is the boy and King the
engineers for that project. They're
going to get back get back to us with a
quote as to what things potentially
could can cost. They're also looking at
potential for grants uh may not cover
the full amount part of it. So
anything's better than nothing. They're
not looking at trying to do anything too
extravagant. It was pretty much just the
thought process when we were out there
was just a simple replacement. Maybe
upsize it a little bit, but nothing too
too crazy out there. Um,
so that's White Oak.
Then we met with North Point on Damsite
Emerson intersection for all of that
drainage issues we have over there going
on. filled them in on the history of it.
Sarah was out there as well. Uh so
they'll be giving us same thing quotes
as to what it potentially could cost. Um
surveying wetlands delineation
to go forward, timeline uh as to when
potentially the project could happen. I
said it all depends on it's all going
depends on cost is what it's going to
come down to with this. uh explained
that we do have money set aside already
that the town's been saving money for a
number of years and we've stopped that
for a number of years as well. So, and
they did have actual they actually did
just like I don't exact it was Rob
Livingston at DES himself or was the
homeowner that actually had aerial
footages of all the silk going into Lock
Lake. Um, but North Point had aerial
footages of that where they they could
see that all. So, they're going to be
looking at that
there. We also went to Narrows Road,
Crescent Drive, and we we all agreed
that it's going to be two separate
projects over there. One, the drainage
on the hillside. Two, the bridge
culvert, I will call it. So, North
Point's going to be looking at that as
well. Same thing. give us quotes what
they're looking at for everything. They
did say the culverts over there aren't
in bad shape,
but by the time everything gets
engineered, we have funding for it. They
even said it' probably be like 10 years
down the road. And at that point, the
culverts are going to be needing to be
replaced. So, if we can be proactive
with this and get everything planned and
start putting money aside potentially
knowing what expected cost could be,
we'll be time will be in good shape
instead of last minute and we we have to
rush. So, but them as well. North
Point's looking at grants for both
projects for all three projects I'll
say. Um,
if any would be beneficial to the town
if we could have um get some kind of
funding too as well. So,
>> back to White Oak.
>> Yep.
>> We replace that. Had it prepared after
the disaster. Didn't we put in a bigger
culver that would than what was there
and an overflow cover as well?
>> Nope. You put an overflow in because it
all washed out around with the cover
that was there.
And the overflow the just this year that
where the water was almost up and over
road up and over the road there was no
water going through that overflow when
Sarah called me at 7 o'clock at night
one night.
>> I thought we replaced the original.
Nope.
>> The original the original one. It's
still there.
So, but there is there is an overflow,
but it's doesn't seem to function at
all. The the other part with that where
is when that that did get washed out and
all that debris went on the outlet side,
all that sand silt debris there, um that
was being looked at to being like
excavated out,
>> right?
>> Due to on on the outlet side, the water
outlets the culvert pretty much does a
180 back towards itself and then
bottlenecks right down to another 180.
kind of does like an S turn and it does
bottleneck down to
>> only like a foot a foot width
>> for it. Um
>> I think we do we need to replace the
culbert anyways because that's another
fe dam situation there. If that ever
lets go, we're going to replace one.
>> Yeah. And there were there was the
concern of that with flooding um and all
that that debris that had already been
on the outlet side that used to not be
there going into Upper Sun Lake. So
being washed out and of course the town
beach is right there as well. So
potentially it would be some of that to
be like excavated out what we were
talking about. So but that's all through
permitting engineering. So
um
I did I did tell them because they asked
about timeline. I said again like I said
already said this pricing but
I told them 2027 we already have
projects going on. I said white oak
potentially could be 2028 depends on
funding. Dam site could be 2029
depending on funding.
Drainage
could be 2028, could be 2029. We don't
know funding though. So,
>> but white oak would be I mean we've done
we've done
but
>> white oak would be next, wouldn't it?
>> Well, not as a FEMA project.
So that's not a that's not a FEMA
project.
>> No, it's not a FEMA,
>> but potentially I mean that and that is
the most traveled road in town.
>> Yeah.
>> So this white oak road,
but we could do
similar situation where we put guards up
now and we can if they're still good
shape, haven't been damaged, reuse them
potentially um like we're trying to do
with whole budge. So
>> I thought we're under pressure from dees
for damsite
>> damsite
back in
200
>> couple years ago
>> 181 19 the town got a LOD from dees
letter of deficiency
>> um and that's that's when a lot of the
engineering
started to happen at that point and when
the board at the time decided we needed
to make
the account for Damsite Road. Um, but
since then, nothing has happened. The
board hasn't gotten anything anything
from the previous engineer
was one of the reasons why we we went
with new engineers. So, and this this
way here, breaking it up, we're not
overloading one engineer either. So
>> um
>> well we met with de
>> already once and um
>> well it's been more than more than once
>> most because of the situation with those
homeowners
>> so this is
>> so that
>> same place
>> same place but a lot of the runoff comes
out from Emerson
>> y
>> so
>> save was perfectly happy with what we
were doing and what our plan was to too,
but we haven't done it yet.
>> Well, we don't have a plan.
>> Well, we kind of did.
>> We don't have We don't have We never had
a plan a plan that was set in set in
concrete. There was there was a meeting
last year with Rob with a contractor and
it was everything was speculated as to
what could be done,
>> right, is what it was. So, in the the
original homeowner that
filed the complaint, which no longer
owns the home, the current owner there
is a civil engineer himself and has and
has expressed concerns with all the the
drainage,
too. So,
oh, at some at some point, to me at
least, at some point DES is going to
look at this and be like, why hasn't
anything been done? So,
>> exactly. I'm just trying to be
>> trying to be proactive and get on the
ball with it and just
>> but
>> it wasn't set in stone but
>> right
>> it was a pretty good idea.
>> So I mean they're both engineers
would know that cost is a huge factor
and try to keep it as low as possible
and not try to blow things out of
proportion for us and do this huge
extravagant thing. Um because I
emphasize that as well like small town
money like we can't spend a million and
a half dollars over there on damp road.
>> That's what the that's what the price
tag was originally.
>> Exactly. So we have half a million put
aside right now. So all of all of the
engineering
uh for damp site surveying has to happen
wetland delineation can all can come out
of that fund for dams site. So but we
got to have something to get it from
them. So between Sarah and myself, we're
trying to get the history to the
engineers for over there and everything,
but
that
and I did make it clear to both
engineers after I met with them,
everything from that point on goes
through Sarah. Sarah is their point of
contact, but just include me on any of
the emails just to keep me informed. But
ultimately, the engineers are going to
be talking to Sarah and trying to figure
everything out. So,
uh Pittsfield the joint meeting tomorrow
night 5:30 here in town hall
so
that will be happening and
having those but
did everybody see the highway garage
RFPs Y
>> well if you did I know you're lying
because we got none
>> we got zero. So Fab
>> Fab was up there up at uh highway for an
hour. So
we we received none.
Fab's doing some brainstorming for us is
what he's doing. Um nothing set in stone
right yet. So
ultimately we got to see what he he may
recommend for up there. Try to get
something done before repairs fixed
before winter time. So
but yeah, so it was an unfortunate thing
that we didn't get those get anyone
for that.
You want to talk about the ConX box
cover real quick?
>> We can. We should probably
>> Okay.
>> So, we have we got a price for the
the trusses for the ConX box, put the
roof on. Um, we got a price just for the
trusses
and then a price for um all the
additional materials such as plywood,
jingles,
all the hardware, stuff like that to to
put the roof on. Um, the trusses came
out to about 11,03
or somewhere around there.
I have
>> I have a total price for everything.
>> Um, but they're going to be four to six
weeks out. So, I'm really thinking that
the uh
if nothing else, we should order the
trusses like right away.
>> Yep.
>> I mean, if it's that far out,
we should do that right away.
This has to go on before the end of the
year.
So, and then the additional work was
like the additional material is like
13,000. So it comes out to about 245. Is
this right?
>> Y
>> that's exactly right. 245. So that's not
installed.
That's just for all the materials.
I think we should um
I think the board ought to ought to
consider ordering all of that now and
then we can put our maybe a request for
sake
>> installation
installation
>> at least we'll have everything there
and most of the money will be spent by
the end of the year. So, I'd like to
have it on forward. I mean, that the
whole the whole concept of it was to put
some of the machinery, some of the
equipment that we don't use
um in the winter time, our summer stuff
under under under
a roof instead of uh it sitting on the
yard.
I mean the with that
the long-term
uh essay vision was to have power out
there so that the equipment could be on
battery tenders so we're not spending so
much money replacing batteries in the
springtime because they've gone dead
they won't hold the charge anymore. So
when you get every piece of equipment
that has two batteries in it they add up
quickly. So,
so
>> is there
>> did we look at putting power out there
already?
>> No,
>> we didn't. We probably should. Um,
I mean, there's going to have to be some
kind of probably some kind of sub panel
out there or something to go to those
com blocks. If you can't
>> I mean, if if they do,
>> can't just run an outlet out there,
string some wires. No, I mean we can do
that down down there. We don't have to
do it right now. But
>> well, see the idea is to plug stuff in.
>> That was that was was the idea. So
>> but cuz you got to remember the weld's
right there, too.
>> The well is
>> Yeah.
Got that catch basin cover. The weld
well pumps inside that.
So
>> is anyone making a motion?
>> Yeah, I'll make a motion.
>> Anybody have any questions on that
>> on it?
make a motion to um to purchase the
trusses and the um additional materials
for the roofing
um in the amount of $24,524.69.
So before I have both the only
question I have is then for installation
we're going to try to go to bid with
that. Um
what we should do is see what the timing
is on it.
>> Okay.
>> And then
you know it's it's not a it's not a huge
project. Um, you know, it's just a
matter of somebody being able to whoever
does it obviously is going to need some
kind of lift,
>> right? Yeah.
>> I mean, they're 58 foot trusset.
>> So, can we put the bid out? I know we
don't have the stuff yet, but can we can
put the bid out now for the project,
right? When it
>> so that we have somebody when the stuff
when we need.
>> No, that's what I'm thinking. Just for
installation wise.
>> Um,
>> we we have supplies. That way we can
have somebody on board as soon as we get
the stuff.
>> Yeah, I
>> I don't want the trust sitting over
there.
>> Well, I don't.
>> That's why I'm asking. So, but
>> the rest of the materials we can cover
up. That's not a big deal. But you're
not going to cover up 58.
>> No. No. So, if we can do that, put out a
bid.
>> Have a have something ready for next
week and we can
>> get it out. But also all those in favor
purchasing the trusses
I
Okay.
Okay. Nancy
pushed you right to 6:30 just like you
said.
>> 629.
And maybe we consolidate the request for
for proposal for install quote into the
garage doors.
>> I mean if we can
>> if we can
get somebody
>> anything's possible. So
>> okay.
>> Yeah.
>> Well on you.
>> Yep. So when I was here a few weeks ago,
three weeks ago, it was um brought up to
me about getting purchase orders and
quotes for things
and
some of that is not
>> there's there's an encampment group that
we really want to get
There's only one
state
in that
we want to get them.
It's not like we're going to go out
to get this.
We understand. Yes.
And we have
been last night discussed cost of
different items that purchasing.
It's not as if
>> Well, if you're going to resell
something, then hopefully you're going
to get the best margin you can get on.
>> Otherwise,
>> don't get it.
>> Um, and as far as the militia group
goes, I mean, I don't I don't know any
of you.
>> Nope.
Nope.
>> I mean, you have to use your judgment a
little bit to answer,
>> right?
>> Even if you sent it out, you wouldn't
get anybody on it.
>> Well, well, it was a bit of a shock.
>> What was that?
That's why I'm back here.
The next thing is when we bring in the
money from its
money because you cannot deposit it
the same time
that
goes to the general
>> that would be in say $5,000 that $5,000
has to spend
you open the account. It would be
general fund but it will have a specific
name for funds to whatever so that
specific
That's not what we talked about though.
We talked about all the funds going to
Old Home Day.
So it so because it wouldn't be
>> Well, I mean that has been brought up,
but
>> two separate events.
>> They're two separate events, but we're
not going to have another 300 year.
>> So you wouldn't have another account for
a 300 year.
account.
>> No,
>> put it right into your old
>> and we can't set up a separate account
until it goes to town meeting
>> if if you have money left over from the
the time. Is it your intention for
what's left over to go to the old home
day
>> for the next year?
Yeah.
>> Yes. Right. I'm just thinking if you
could use if you use the old home day
account if it's your intent if there's
any money left over to go to that then
that wouldn't be you know
>> right
>> I I think it's important that we we
um
we account for the money and I think by
by utilizing that account
the old home day account for if we can
we can see what's coming in. We can see
what's going on. We can you know what I
mean? We can account for most most or
all of the money.
>> But we can't do that. We can't use the
old home days checking account for what
she wants to do. So all the money would
have to come in as a revenue and at town
meeting. It would have to be a warnard
over to to come back out. So if you
started receiving money now
>> for selling things,
>> is that your We'd have to keep track of
it, have it as a warrant article to pull
the money up to put it into an account
for you.
>> It is.
>> I know it is.
>> But we can't just open up account just
because we want to open up an account.
>> No, but we can create a specific line
item in the general budget, right? It's
still
>> u general fund, but we would just
entitle it
>> uh 300 years. It's still money going to
general fund, but that's where we can
track it.
It's not really opening up. It's just
creating an online item.
>> Yeah.
>> To travel
>> because
And there already is money in that right
>> in the
>> in the trust fund they have. Yeah.
>> Okay.
>> Nobody probably thought about that when
the account was set up, right?
Right. I know. I know.
>> So, we're just looking at items.
>> You have them on order, which means
they're prepaid for.
>> No.
>> So, you order them and then soon as they
come in, you'll be on the
pull it out, right?
Yeah.
>> You can't put money in the truck.
>> Not until
it's not a revolving account.
>> It's going to have to go into
>> I sell $600 stock. And I want to bring
home
that money.
>> Yeah.
>> Be the trust.
I do.
>> I mean, how how much is in the trust
fun?
>> 42,000. 42,000.
>> Oh, 42,000
>> and your agents to expend. So, lawyers
through the expenditure.
>> Okay.
>> Yeah. Money can't be limited,
>> right?
>> Okay. But it can go into the general
fund.
>> You can make a separate line. Right.
>> Okay.
>> You said you said they could pull the
money out of the general fund.
>> It's general fund. If they put money
into general fund, I don't know why
can't just allow a check to be cut
against it. We probably should make sure
with department of revenue
>> I was going to say DRA and the auditor
groups. We're not creating an account
that would be under dr
>> just like your bills every week. You
approve to pay all the bills. They're in
general fund.
>> I mean, we approve them, but we
clarification,
>> but we've been authorized at town
meeting to
>> be able to expend the money
>> on your budget.
>> Yep. Because that town meeting is what
authorizes us to be able to approve all
that.
>> Yeah.
>> To go out.
>> Right.
>> No, we can't use that one.
>> No, I don't. I agree. I don't want to
hear that.
>> Right.
Let's check with the auditors too just
to make sure
>> on that
>> it's the town's money.
>> All right.
>> It's not yes fun. All righty.
>> So
>> he likes it.
>> Not yet. So, what what other what other
things were you thinking you were going
to need to go out to bid for?
>> Really, it's just the drone.
>> The laser shows or whatever, you know?
>> Yeah.
>> Yeah. But you're not you're going to
spend $1,500 on one band.
We should get crazy.
>> We are. Yeah.
>> Yep.
>> I mean I mean I'm fine with just the
drone show, laser show, fireworks,
whatever you want to whatever the
committee chooses to go out to bid and
use your best judgment as to if you need
to go out to bid should go out to bid.
So, and then uh
if anyone has any questions, then we can
ask and just
state your reasonings.
>> So, fireworks.
We could get pretty good.
>> Yeah. Y
>> cleaned up anyways.
The other thing that you might think
about is in your budget because this
will happen next year.
>> Just increase your band concert line in
your budget. I know you don't have an
exact price, but
>> that's not hers though.
>> That's not hers. That's part of
>> But you could speak with parks and wreck
and ask them to include that in their
budget if you want to do it that way.
Just a suggestion.
>> I see that.
>> Yeah.
>> Okay.
That's it.
>> She's walk away.
>> This is in relation to Nancy here.
I just wanted to um take a moment to
thank all the election officials for the
election last Tuesday. It's a long day.
It's a lot of work. And you and all of
the elected officials and your staff did
a great job.
>> Got to do it all over again in November.
Okay.
Okay, just uh
two quick updates I'll say.
One was CIP met last week. Uh we went
over police department request there.
Theirs was just cruisers and the sally
port they had talked about last year.
some kind of
cover where they can park cruises under,
but they're not being driven instead of
out front. Um
originally on the request they was
trying to put money aside each year
conversation went into which which is a
board decision though uh lease
purchasing
you know and it was brought up as to why
and I wasn't on the board at the time
but why the board got away from lease
purchasing. um that seemed to have
originally was set up where it kind of
leveled out the tax rate there for us.
So ultimately that's something the board
looks at. So
>> go with the ambulance
the ambulance.
>> Yep.
>> They did it with the police cruises.
>> Yeah,
>> we did but there was one year we
purchased three of them and then like
last year we got approved for two but we
only purchased one. So, and that's the
only one we had purchased.
>> So,
and but some of that was we didn't
really need have the need for it,
>> right?
>> So, um
but when that report comes through
though, you'll you'll see that on it.
But just so you know, we did we did meet
I actually did make the meeting for
that.
>> We got to get them off to the same side.
>> Well, that's I mean, you can't have
three new cruises. They're all going to
die around the same time.
>> Well, that that's the thought process.
>> Buy three more.
>> So,
and then
just so everyone's aware, planning
board, there is a proposal for a cell
tower in town. Don't know if you've
heard of it, just so you know. And there
is, which is came from from FEMA, the
flood plane insurance program. So, and
we don't really have a choice. there has
to be a warrant article to change it
around. Um that's kind of new to the
planet that just got sent to us uh the
last couple weeks. So,
but
they're going through
they figured six month process for them
to go through and so that we have to
update the flood plane zoning ordinance.
If we don't, then property owners in
town potentially won't have flood
insurance. So,
and I'll pass it around so you can see
it in bold letters where it says it must
be put on the warn article. So,
but that's the email I got. So, but just
so everybody's aware. So, you will see
that
Yeah,
>> article. Yeah. So,
>> who does that study?
>> Right now, it seems to be them reviewing
them uh our zoning ordinances and giving
feedback. So, but
we there's a planning board meeting
Thursday night. So, if we talk about it,
then I'll update the board again. But
just so you all know, that'll be coming
through.
So,
anybody else have anything they want to
talk about?
Okay, I will open up
public input at 647.
Jes like, don't jump all at once.
Yep.
Thank you.
>> We got a lot of good feedback on that
ceremony and as well from a prospect for
the football game.
>> I just had a question. Um on the earth
invoice, was that really an invoice or
was that a quote? No, that was the
invoice for them replacing
>> they already had the work done.
>> Yeah, that's the Narrows Road project.
>> Go ahead.
>> That where they closed Narrows Road
down.
>> Was that a something that was in
progress or just
>> Yeah.
>> Was it
bid or
>> Yep.
>> went out went out to bids there. That
was all engineered.
>> The one we've been talking about since
last year.
>> Um I was just wondering about the uh the
trusses for the conx boxes. I know that
that's being talked about. Um, was there
like did you go for quotes or just go
supplier?
>> Uh, we only went to one. We went to L
Valley because they seem to have the
best price on them.
>> Yeah.
>> And 11 is pretty good price.
>> Like real good.
>> And then the uh what you think the uh
installation be I have no idea.
I mean, I would guess if I had to guess,
I'd say it's probably
maybe $5,000. I mean, no.
>> Um, it's probably it's probably 20
square, right? Somewhere around there.
15 square. So, there's a couple grand
right there.
>> So, the the additional material was the
roofing material. It's really Yeah. I
mean, as far as the job goes, it's
really just plywood and the
>> the the
>> you know, plywood and shingling. That's
really the whole job. It's not There's
nothing much to it.
>> Okay. I was just Okay, that's fine.
>> Okay.
>> And I'm not doing it. I tell you right
now, I'm not doing it.
>> I'm not even close.
Okay, thank you.
>> Thank you breaker
onet road relative to the 300th
anniversary
when we start we've talked about taking
and requesting donations from different
sponsors.
When that money comes in,
where will it go? Will it go to the
general fund as well?
>> Do we have to because the revenue
>> have to be able to have to be able to
follow it.
>> Yeah.
>> So to speak
>> should be, but we got to double check
with when it comes in. Um, even so,
whatever you take in from now
until I'll say middle of February.
Say middle of February. So there, you
know, we can have the warrant article to
pull that money out too for you. So
>> but at least with the the ledger, we can
keep track of it though. I was just
concern
>> it just so the 2024 audit is complete.
The auditors just sent an email today
and asked how many copies we of the MS
535 that he's the public document on the
audit and I told her we typically get
five. So it should be any date that is
>> and what about the um the system
conversion general
system to go January 1st at this point
>> still in process. We hope to have the
first part of that which does not
include the payroll
completed hopefully by November.
They were also waiting on some of the
audit as well,
but we're moving forward.
>> I'd like to
request to have items added to the
website.
>> Yeah, you can email
there.
Thank you, Linda.
Anyone else?
>> Have you been
Have you been uh following or
documenting any problems with the
website?
Um I couldn't go on previous
>> because if we find stuff, you know, it's
it's very important for us to at least
bring it bring it to the front, you
know, so that we can address those
before we add more functionality or add
more this or add more that. Let's get
what we have working properly
>> because I know last time I was on it, it
wasn't wasn't very nice. It's a little
different.
>> Yeah. Yep.
>> Where do those go? How do those go? Are
they just on our website or are they
published anywhere? Is there?
>> So, it depends.
Sometimes it's advertised on
association. uh sometimes and typically
also in the wolf paper
that it gets rather expensive to try to
advert.
We always post at post offices website.
>> We also like the locals to do most of
the bidding on it if they can, you know.
Um, so
>> but it doesn't
>> No, we're not. It's because everybody
should be.
>> Yeah. The time of the year. Everyone's
going to be in crunch time now.
The other thing
procedures, I know it's here on the
agenda, but
>> they're still being reviewed.
>> Yeah. Changes.
>> Yeah. Last week because of the election,
so it kind of
>> kind of to us off a little bit.
Um,
>> we apologize.
>> Um, the highway garage
that was
the as far as the tsentennial goes, um,
I see where the confusion
is, but I think you're right. If you
just create a general ledger
>> marking for it, you can easily find any
money that has come in
>> and
so
I think they just want to make sure
It would certainly not come in as a
revenue. Revenue would be separate that
tax rate. So it would not be that
>> we don't want it held on to and then
utilized because then we can't track it.
>> Yeah.
>> We don't know how much came in or how
much went out or what it was for or
>> exactly.
Thank you.
Anyone else? Public input.
Close public input at 6:55.
Um,
I did just think of one quick thing
though.
Can we make sure we have job postings
for highway because we have two open
positions at highway.
So, we need to get potentially get some
applicants.
with two
>> labor position.
>> Yep. Truck driver position. One CDL, one
non CDL.
I think we had two.
>> We b seven, including the road agent.
>> Okay.
>> Right. But we have the non CDL already
there.
>> Yeah, but we'll have two. Well, we got
three non CDL trucks, so which may be
easier to hire somebody. Okay.
>> But either way, whether it's CDL,
>> not CDL
first, but
>> we need we need bodies for this winter
more.
>> No, I'm not calling every storm again.
Not doing that. So,
>> okay.
Make a motion. We go into nonpublic on
RSA 91- A
col 3 2 B.
>> Second. All in favor?
>> I I