SB Meeting 9/15/2026
SPEAKER_1 moved to accept minutes, seconded and passed. Seven town properties will be auctioned October 24 at 10 AM. Goose Pond Dam gates will be replaced; $250,000 is withheld until completion. Drawdown begins October 1, work starts November 1, lasting 7-10 weeks. Generators: water plant operational; depot pumping station and wastewater plant need replacement; $3,800 approved for police station generator repair. Potato Patch Bridge design reimbursement of $321,000 is expected; design cost $80k (20% town share). New fire chief Jeremy Tibbets started. Water line flushing and hydrant testing is underway. Septic tank pumping will be contracted starting this fall. Source: https://www.youtube.com/watch?v=7uelLTx6B0w
There's a sign in sheet on the back table. Please sign in. >> There's a sign in sheet on the back table. Please sign in. All right, we got six o'clock. Please stand for the pledge of allegiance. I pledge allegiance to the flag of the United States of America and to the republic for which it stands, one nation under God, indivisible, with liberty and justice for all. >> Thank you everyone for coming tonight. Big crowd. It's exciting. >> No. Uh Sadi is out of out of the country this week. So just Scott and I. Uh uh September 1st meetings non non public just public meeting right Oh, interesting. I'll move to accept as written. >> I'll second. All in favor? >> I >> I >> So I think most of you are here for goosebond. So we're going to jump right into that. Got Corey here from All right. Um, thank you for having me tonight. Um, I'm for the record, Corey Clark. I am the chief engineer at the Dan Barrow at the Manchester Department of Environmental Services. I apologize. I am fighting a bit of a cold, so I'll do my best to speak loudly. So, the reason I'm here tonight is uh the ongoing Goose Pond and Dam repair project. As we all know, um we've been working on Goose Pond really since uh 2024. And while the project was substantially completed in spring of 2025, we have been dealing with some ongoing gate issues. And so just to build the timeline a little bit when we first kicked off the project and I first met with everybody here in uh 2023 2024 time frame at that time as part of the scope of the project the two existing what we call low-level gates basically drains at the bottom of the dam we were under the impression that those could be re rehabilitated once we lowered the water surface remove those gates rehabilitate them and replace them when We drew the water down in 202 uh three going into the winter of 2024. We discovered that those gates are actually much more deteriorated than we originally anticipated. Given their location of where they sat down inside the dam, it was hard to get any sort of um hammer or anything else on those gates prior to actually lowering the water surface. And so we made the decision um and working with our design team to actually replace those gates in kind. And so those new replacement gates were manufactured and designed and manufactured over the course of the next year. In the winter of 2025, those gates were actually installed. We started refilling Goose Pond. Um and actually before I before we started refilling those gates went through initial testing phase before refilling basically at that time even with the pond drawn down this the coffer dam that held water about 8 to 10 ft above the base of the dam was was breached. We basically flooded the gate area did the initial testing the gates passed the initial testing in the spring of 202.5. However, we have to do a final gate test essentially when the pond is is full or nearly full. And so in the fall, this time last year, um even though Goose Pond wasn't quite filled, it was still about four and a half, 5t lower than the normal regional surface, we um we elected to go ahead and and test those gates to do the final testing and sign off on those gates. At that time, what we discovered was when those gates were opened with about 15 feet of water pressure behind them, one of the two gates, the seal that is sandwiched between the frame of the gate and the actual gate panel came out of the the groove that it was in. So, the gate was no longer sealing and so water was was moving through that that gate at that time. Um, in order to prevent lowering the pond, we actually worked with our design team. And the way the goose pond is designed, there's actually downstream of those two gates is actually a tunnel that comes out. We elected to seal off that tunnel with a bulkhead and actually use divers to go in at the top of the dam, crawl their way down through and get to the two gates to replace those the seal on that one gate. We did that on October of last year in which the divers went in successfully replaced that seal. Um we exercised the gates prior to uh removing the bulkhead in the tunnel and then once once the uh the gate seemed to be okay. We removed that bulkhead and did the final gate test. Unfortunately, the gate did not pass that test again and the seal became dislodged. So, at which point in time, we elected to lower the empoundment over the course of um the month of November last year back down to where it was prior to and actually fully replace that seal. The gate manufacturer um completely replaced that seal on that one gate at the same time exercised the other gate and made sure that everything was um was within tolerances, at least what they thought at the time. and went ahead and started refilling at the uh at the end of um December of last year. On May 1st, the pond was refilled back to the summer recreational season. Actually, I'm sorry, June 1st, it was back up to the summer recreational season in which we figured we would go ahead and do the final gate test and sign off on the contract because the our our contractor's um contract actually expired at the end of of June. And so at which point in time we went in now we had 20 ft of water on top of those gates. We tested both gates and unfortunately seals failed on both gates. So at that time we closed both gates while they were um leaking substantially. We decided that we would hold Goose Pond at that current recreational level for the the summer season while we consulted with not only the contractor but also the gate manufacturer and our design team to figure out what exactly had occurred as a result of this and what was causing these issues. And so over the course of the summer, we've been having several meetings with the design team along with the gate manufacturer. And what was discovered is that at Goose Pond Dam there are actually three new gates. You have these two lower gates which are 4 feet by 4 feet and then you have an upper gate which is 3 ft by 3 feet. That is a brand new gate. That gate has passed all the testing measures um to date. What was discovered is when the gate manufacturing process occurred at the factory in California, the press that was used to make that upper gate was not retoled to make the lower gates. There's a thicker gauge steel that is actually used for the lower two gates. And so what happened was is when they went to go bend the radius for the frame on the lower two gates, that radius was too large because the press was not retoled at that time for the thicker gauge steel. The resulting effect was that gasket that sits around that gate frame was actually sitting slightly on that radius rather than on a flat surface. Typically, there's a tolerance, I believe, of about a half inch or so. Don't quote me on this. I'm not exactly sure, but basically it's a a tolerance in which that seal is supposed to sit on a flat surface. And as a result of the the bend, it was um it was not. And so the gate manufacturer has done an afteraction report on this and um clearly identified uh what occurred. I believe I passed that along to the town. And so the only remedy unfortunately is to actually replace both of those gates. And so the reason I am in here tonight is to discuss the draw down necessary for gate replacement. We did look at an alternative or two alternatives to drawing it down. Could we go in with divers once again and do the work underwater? That would require because the way the gates are actually set within a grout and all the anchors are epoxied within the concrete, the the divers would have to demo out all of that material underwater and then we would have to try to get those gates reestablished in the proper configuration underwater with chance of success um being minimal. We also looked at uh doing a sheet pile coffer dam around this area. However, a couple of constraints with that is there would likely be a level of draw down required to install such a sheet pile coffer dam system. And the other issue is due to the relatively shallow bedrock that is under the dam, making sure the sheets actually tie in appropriately and we're not getting blowin from the bottom of that excavation below the sheets. And the third thing is also the um the site constraints for getting a barge and sheet pile driving equipment in not only through pond road but basically at the site as well as getting that level of equipment on site um to actually do that volume of work. So that's why the team and myself have elected to lower Goose Pond again and um remove both of those gates in their entirety and actually install two brand new gates. And there was a number of questions that were sent to me prior to this meeting that I just want to go over and help answer some questions. So I'll go through these and um and certainly take any questions from the board or others afterwards. So first question is how does this gate leakage compare to other dam installations? How common is this? And so this question this question and several others were sent directly to the gate manufacturer. and this install leaks. Basically, they're saying this install leaks excessively well above the actual specifications due to the frame not being fabricated correctly. This would be considered rare. Number two, what is accepted allowable leakage based on this design? Septible leakage is in compliance with AWA, which is American Waterworks Association specification C561-21 defines the minimum requirements for fabricated steel gates, which is 0.1 gallons per minute per linear foot around the gate. And so that's what we were testing for in the initial phase prior to the seals actually coming undone. If the gate leakage is due, this is question three. If gate leakage is due to a 1/8 error in the gate construction, why is this a sound design? Should it be compensation, for example, oversized track and gasket? The gate style has been fabricated in this configuration since the early 2000s and has proven suitability over the years. The gate being fabricated incorrectly is a rare occurrence. Therefore, has this design been used elsewhere? This design has been used numerous times over the past 20 years that the gate has been manufactured. Was this design ever lab tested? This design has been lab tested over the years in an unseated capacity. Essentially, what that means is they don't have the the functionality to test each gate, open up the gate, and allow water to move through under that full head, but they can certainly test the gates under under a full capacity. This design has been field tested as well over numerous installations throughout the country. Many design engineers require field tested part of their specifications similar to what we had here at Goose Home. The next question is, "A 3x3 sliding slookate operating on a 20 foot seating head typically uses a four-sided resilient seal composed of ultra high modular weight polyethylene sliding seats combined with compressible neopre EVM bulb cord. This is still the question. The accepted allowable leakage rate for the specification is 1.2 gallons per minute under standard code requirements through high performance design. Although high performance designs also achieve 0.6 6 gallons per minute or better. How does these gates compare to that standard? NPI gates, which is the manufacturer of wing fabricated correctly, can achieve half of the AWA requirement, 0.05 gallons per foot of seating perimeter. This would equate to 0.89 gallons per minute allowable. Who is in who's in charge of this after project? Who will be monitoring daily progress? Will someone be on site daily to clearly progress, evaluate progress and determine if work meets all expectations? This is from our design engineer who will be on site as the designer and construction engineer. Gamut Gamut Fleming Transportation Systems will have a representative on site for the duration of track of duration of work to track and document the replacement gate work to ensure contract conformance and quality. Is there a detailed schedule available with this project? Yes, Michaelels has put one together and I can certainly share that as necessary. How however I will state that I um in conversations with the with Michaelels is it's it's kind of a worst case scenario in which filling of goose pond starts um January 1. In my talks with them, we can shift that back particularly if Goose Pond is fully drained by the end of uh October. Are there contract penalties for schedules incentives for early compensation? The current contract does not allow for additional payment for early compensation or schedule ship. However, NHDS has been holding over a quarter million dollars for the for the repair of these gates. That money has been held since the initial testing happened last spring and no payment has been made since that time in order to complete this work. So, all the dive testing, the other the other seal replacement, um, and this work coming up is all still part of the entire gate process. And so we've been holding payment until this is rectified. Who are the subcontra contractors subcontractors for this project? Michaelels is the contractor for this. McWain Services will be the contracted um subcontractor to reinstall the gates. And McWain um is the gate manufacturer company out of California. Will work start at 7 a.m. on Monday and end after 5:00 p.m. on Saturday? Will work be done during holidays? Does the contractor have the manpower scheduled for this program? This is from Michaels. We work will start at 7 a.m. daily and we will work a minimum of eight hours per day. As of now, we will not be working weekends, but we'll have somebody in the area to monitor pumps as needed. Obviously, the weather will be a huge factor. For example, if we lose a day or two during the week because of inclement weather that will force us to work the weekends so we don't lose days on the schedule. We will keep an eye on the cold as well, but we are ready to build heated enclosures that we have in the past as needed. We will not be working holidays. We we want our employees home with their families for these special occasions. We have emergency on-site coverage as needed during these holiday weekends. We will commit to the right project staff to make sure we get this replacement completed in a timely manner with good quality and safety at the forefront. Why are you waiting until October 1st to start the draw down? We could possibly start earlier. It's really just making sure that we don't leave anybody who may not be aware of the October 1st draw down stranded with either boats or other things out on the empowerment. But DES is certainly available to start lowering the water surface and we may um in consultation with the lake association start drawing things down a little bit earlier. And what can Goose Pond do to help with this situation? And the answer to that is really making sure that everybody's aware of this and making sure that watercraft is off the body of water particular if we start lowering things a little bit sooner. So, uh the other thing I did want to say as part of this is so the new gates are actually being manufactured right now. In fact, that that water testing at the facility in California is actually taking place tomorrow. As part of that, Ganet Fleming is actually on site in California, making sure that those new gates pass that on-site testing and also to make sure that all the press radiuses and everything else on those new gates are actually within factory tolerances. So, we will be making sure that prior to even stripping those gates, they are within what the design specification actually calls out for. And so with that, I will open it up to any questions that the board may have and however else you want to handle. Any other questions? >> Um, what what I mean, how often are those lower dates even used? I mean, what is this? >> So, here in the state of New Hampshire, all all hazardous dams, regardless if they're high hazards, such as goose, significant or low, are required to have a a what they call a pond drain, basically a low-level drain. If there's ever an incident emergency situation in which we have to lower the empoundment that has to occur. One, you know, one example of this is we actually had a request uh last week in Pittsfield, New Hampshire to lower Pittsfield Mill Dam by the police department over there for an active investigation. So that is just one example, but certainly if there was ever a dam safety emergency or some other need to lower the empoundment, that is why that requirement is actually established. So here at Goosebond, we have to have one um means of actually lower the water. I will say we do not need two and if it was discovered that one gate was faulty and not both gates, we may be having a different conversation where maybe one could be sealed up while we maintain the other one. However, in this case, both gates are found faulty. Therefore, that's why we're replacing both of them at the same time. And so our intent moving forward is as you may recall this dam used to have three large wooden discharge gates. Um our concern with those wooden gates is due to their age and um integrity. We were concerned that if they were to ever fail to be catastrophic loss of Goose Pond and basically flooding downstream. So as part of the project we remove those wooden gates, put in that small 3x3 gate. That will be our gate we typically use for operations. However, if we ever get a large storm event, we will certainly be using the lower gates to help mitigate any any storage issues within Goose Pond, but also any downstream flooding issues um after we store water at Goose Pond or anything else like that. So, they will be used in the future um moving forward. >> So, I know you talked about the specs of leakage around the current situation with the two lower gates. I mean, the lake has stayed full. You've been able to manage water levels even with that happening. is again what's the concern leaving it there's water blow by those >> the concern about that is uh twofold one um while we've been lucky here in the um in the Cananan area it's actually been a little wetter than other parts of the state a lot of the other lakes throughout the state are actually well below their below their average and so certainly with Goose Pond um not only the gate leakage but the other factor that we now have to contend with with basically water moving through Goose Pond is is we put in very extensive foundation drains on the downstream side and they're doing their job perfectly and they are running quite a bit right now. And so the concern is is over time if if we have a significant drought in this area as we have seen in years past prior when we used to have flashboards on Goose Pond is we can lose upwards of a foot or two off of goose pond relatively easy and so this is only going to compound the issues with having those gates continue to leak. The other concern is because those seals are neopre in nature is if we open up those gates and if one of those seals gets jammed in the gate guides, we won't be able to close the gate properly and we will end up with a jammed gate. So while both both gates are now closed, if we had to use those for any particular reason, our concern being basically they could jam up and they wouldn't work properly and we'd be stuck with an open gate. Okay, >> any questions? Not really. It's he explained pretty well that it's manually a timeline right now that we're looking at. >> So the timeline is um we would start the draw down on October 1st with the with the expectation that we would be lowered to start work um by November 1st. I've already discussed with Michaelels. They're going to be showing up to look at basically tentatively starting to mobilize the middle of October with the uh expectation as soon as we hit that draw down mark to start working um installing reinstall establishing the coffer dam upstream and getting equipment in there necessarily. One of the things that we have to address is in front of both of those gates are two large trash racks that were installed as part of this project. those have to be removed before we can start removing the gates. And so there's a fair amount of heavy crane work that we got to do just to get just to get those gates um exposed and get those gates out of there. And so the the timeline essentially being they start work November 1st. We have a 7 to 10 week period. And so as by the middle of December, we would we would have the new gates installed. They'd be going through all their testing and fitting test. We would be doing the initial gate testing like we did in the spring of 2025 at the end of December with those gates being closed like they were last year on January 1st. >> Um so once again Goosebond Road's going to be exposed to some pretty heavy equipment coming in and out. >> Yeah. And so it will be exposed um our intent is to have all that exposure hopefully happen before any any freezing or freeze thaw cycles. So certainly you know next spring we don't intend on having any any issues at that point in time. I know Michaelels has been cognizant um with heavy equipment traffic of working with their delivery drivers to make sure that um they're aware of the speed restrictions on the road and any other issues along with working with the highway department. So certainly if we have a wet fall then we will be working with the highway department on any on any potential issues. Yeah, because that is unstable ground under that road from just in from Route 4 to the dam is not good uh ground. >> Yeah. So particular what what we what we were working with with some of the equipment deliveries and such is making sure that essentially they are being escorted by Michael's staff so that they're staying away from I know in one corner in particular where the road is is kind of caving off on that side to make sure that they are not >> traversing that one that one area of concern. >> Yeah. The biggest problem is going to be more so when they're done that they've got to have any of that heavy equipment out by February 1st or it will or it will be there until May. >> Yep. Yep. And so our intent is to certainly have all that equipment out of there like we did last year. Everything was demog um by uh by the start of the year. The one thing we will have to do like we did last year um and I I can't thank the lake association enough for monitoring this. Michael Ree is we will have to um once again have bubblers out in front of the the new gates to make sure ice formation doesn't compromise the gates. Fortunately, this year, unlike last year, we will not have a generator on site. One of the things that we did over the summer months is pull permanent power into the site. So, we'll be able to use that to basically run those bubbler mechanisms. So, there won't be a on-site generator to uh to worry about in this this particular year. So, end of the project, lake back full. What do you What's your >> So, lake back full. We still have to make sure that these gates pass the final test. So, it's going to be a timeline just like it was last year in which we shut the gates come January 1st. Lake fills up. Hopefully, we have a good winter and spring runoff like we did last year in which by summer recreational season, the lake is now full. We can test the gates and sign off on the contract, get final payment, and we are done. Any questions from Mike? >> Cory, I thank you for everything you gave us here recently, but um you know, one of the things one of the things I covered in my phone conversation with you was it seems like I mean the the draw down, you could watch it. You could watch it six inches and a foot and nine inches today. As we're getting closer and closer to the 20 foot, it they really got to have all of the equipment on on site already. the all the men on put them in the hotel for two days for to just play dominoes. But you know when the water hits 20 feet or the magic number, they got to be ready to go. They can't make a phone call there and say, "All right, guys, show up." Because you you only have effectively about six weeks, right? They're going to take Christmas and Thanksgiving off, >> right? And so the conversation I had with Michael today was as that water is going down because they're going have to reestablish the road coming in. not only the road coming in on the upstream side of the dam, but they can start working on that, but also making sure all the sandbags and other materials needed for the coffer dam in place. Right. >> Unfortunately, the gates, if they pass testing um tomorrow, I believe there's a couple other QAQC tests, but really they should be on a truck heading this way by early October at the latest from California coming in. So, they should be arriving, I would expect, mid October. Well, I mean, one thing that might help is that they did this same exact thing last other than replacing the gate, but they did the same thing last year. You know, they had to build the igloo with the heated >> space for the concrete. And I mean, this this is this is a fire drill, you know. >> Yeah. >> The same people. >> That that was another question. Do you know if it's the same crew, the same Michael's crew? So the um you may be um the uh the project manager that came in towards the end of the project, Jamie, he's going to be the the primary uh manager along with Tom as well. So it's going to be the same crew that did the work last last winter out there to do this work. >> And Alex from Gana Fleming, same guy. >> Yes. Or Scott. Yes. It was also been part of this project from the getgo. Oh go I was there almost every day the original not every day but you know every two three times of and I never saw Alex out on the dam he was always in the trailer so I I don't know if he's got to be watch I I don't know anything about that business but it just seems like somebody needs to be looking over somebody's shoulder to make sure. >> Yeah. In fact, one of the things that we required as part of this um is a full extensive work plan from Michaels on how this is all going because I made it very clear to them is I don't want everything to be watered and all of a sudden they discover oh well how are we going to core out this anchor bolt and actually replace this anchor bolt or move this anchor bolt. All that needs to be figured out well ahead of time. We know exactly how those gates were installed due to the current existing design drawings and all the documentation under constru that was done during construction. So, as part of the submittal package that they have to put in for these gates is a full work plan of exactly which bolts need to be removed, which ones are going to be cut, which ones are going to be poured out, which ones are going to be grouted. So, that way to help expedite the process. There's no there's no what they call RFIs or requests for information that comes out during the actual project. All of that is taken care of well ahead of time. And see, you know, in the after report, which was fascinating, there were Yeah, but there were anchor bolts put in the wrong place. Like, nobody noticed that when they were doing it. I mean, it's 22 and a quarter inches from the edge, ready to drill. Boom. How does it become 27? >> Yeah. You know, >> I don't get it. Nobody was watching, you know? That's what I That's what I thought Alex would be doing. >> Yeah. No, you you're you're completely right. And so that's that's going back to the the um the work plan that we're establishing is to make sure that whether bolts were put in the right spot or wrong spot to to begin with, we know where they are now and how they are going to get addressed in court. >> You mentioned that the gates are now uh probably finished and and and ready to be tested. Are they being tested under a load? Is there a dry test? So they get dry tested and they get tested under a static load. So it's my understanding they have a facility in which they can install the gate and put 20 ft of water on it or I don't possibly more but they put that water pressure on the gate. What they don't have the facility to do is because when you open a 4x4 ft gate the volume of water is such that you cannot maintain that load on that gate. So they have the ability to statically test that gate. But unfortunately there is not an ability to basically allow testing to occur where you load up the gate, open the gate and then close the gate under that same loading criteria. >> Isn't that the problem we ran into? >> That is the problem we ran into. And so >> um so unfortunately that's why as part of all these projects we have the final gate testing. And so while the gate will be done to the the the tolerances as required. And according to the manufacturer, these gates are installed all throughout the US and they don't have problems with the other gates. Fortunately, each gate >> they opened them. >> Each gate is custom made. And so it's where until you finally get it on site and you go through all the final gate testing on site, um you you unfortunately just don't know how they will actually perform. Are these uh are we using the same seals or a different type of seal? Because I thought you mentioned earlier that when you tested them, the seals didn't hold. >> The seals didn't hold. And basically what happened was is is the the frames. So the there's a there's a stainless steel frame that gets bolted up to the concrete and then the panel that actually opens and closes sits within guides in that frame and rides on these seals. >> The way the um the way the frame was constructed cuz the frame actually curves into the opening that the water moves through. that that curvature was too great on the gates that are currently at the dam. And so that seal is actually slightly sitting on that curve. And we're talking only an eighth of an inch. So it wasn't caught unfortunately either during the manufacturer review or on site review. And it wasn't until after the manufacturer dove into their m manufacturing records and figured out that the tooling on the press was not changed. Therefore, that's why that radius is too much. >> Okay. So, so there's a high degree of confidence that they're going to get it right. >> That is what they are delivering to me. Yes. >> Thank all the issues they've had. Is there going to be a state quality assessment team on site to ensure that some of the things that they're doing is it's not 27 in but the actual 22 and a quarter inch that it needs to be. >> Yeah. >> Or are we going to just wait till they're done and then >> you know because it seems like some of that stuff could have been caught if earlier if there were people outside of the Michael's team doing the inspections. >> Right. So typically the way the way any sort of construction project works whether it's here or a DOT project is you have the design process that takes place in this case you know two gates that are going to be installed they have to meet this spec it's up to the manufacturer to provide a drawing or document stating that the gates meet that spec and so then the design engineer and dees review that spec gets signed off on um that it yes it meets the spec and then it goes in when it was installed the manufacturer then has to sign off that it was installed in accordance with with proper protocols and that's what happened with these gates the gate manufacturer came out in those initial tests in 2025 signed off on the gates they came back last year after doing the seals signed off on the gates however it it in this case obviously the fault was what was approved on the drawings was not what was actually manufactured and because the tolerance was so small it wasn't caught. Um so moving forward not only do we have the work plan that we are going to be following but also yes dees is going to have certainly a much more active role in making sure these pass standards. In fact, what I will say um when we did the initial gate test um this last year is even myself and a couple others went into the tunnels to check those gates at that time signed off on it. I was up here um on the day that they started the final testing the spring to make sure that everything everything seemed to be fine. It wasn't until they went back into the tunnel after after they cycled the gates. I was here during the cycling, but it takes a period of time for the tail water to come down in order to get back in there in which it discovered that the the seals have popped out. So, we will certainly have a very active role in this as well. >> You can't afford another. >> No, I I completely >> environmentally that lake will not do well. >> So, as you know, >> if manufactured correctly, the seals will not or should not >> correct. Yes. like the upper gate. And we have not seen, of course, that gate doesn't have 20 feet of pressure on it, >> but we have not seen the same um issues at the upper gate as what we've seen at the lower two gates. >> Doesn't the Army Corp of Engineers provide a service to these types of inspections when things are constructed? I thought the Army Corps of Engineers gets involved with these when asked to expect these issues. >> I am not aware of an Army Corps service for dam safety related issues there. I may just be not aware of one. Army Corps is certainly involved on Army Corps related projects. So like for example the flood control sites in New Hampshire, whether it's Hopkins, Everett, um Franklin Falls, those are owned by Army Corps. There's a number of levies throughout the state that have to go through review of Army Corps as well, but a dam that's regulated by the state of New Hampshire does not have to go through Army Corps review and approval. I there could be a service out there that I'm not aware of and I'll I can look into that to see if there is such a thing. >> What's the early finish date? Is the schedule available? >> Yeah. So, I I can provide the schedule. Um, what I will say is, like I said, that schedule is a worst case scenario in which filling starts the first week in January. I've already talked to Michaels about shifting that schedule a little sooner. >> I don't think you don't you didn't ask them for a, you know, minimum schedule. They said be be done by January 1st. >> Yeah. And so the the the process is a seven to 10 week process. So, I would say if if weather cooperates and we we have good weather, then we might be able to be done in middle of December, but I would say it's probably going to be the end of the month before we >> Well, if Michaelels does, it'll be the last day of the year. >> For sure. I guarantee. >> I guarantee. >> I want to know the early date and then we'll find out how many days they're not going to show up because it's too cold. Well, in this case, you know, one thing that was mentioned in in the in the questions is that making sure that they are already tenting stuff and have all the equipment on site for tenting because all that grow has to be done under certain ambient temperatures. >> I'm I'm very concerned about this whole schedule because it's another one of Michaels. >> Yeah. >> They don't show up and they leave early Fridays they're not here and Mondays they're not here. So, somebody going to be there to crack the whip. >> Yeah. Who's that? >> Well, I I mean I'm I'm intimately involved in this project. That's not who who actually controls the schedule, Michaels or you? >> So, it's it's a combination of both. You know, it's it's it's pushing them to meet the to meet the the required schedule. Um, at the same time certainly there's contractual obligations in the way the contract is set up in which there is leverage but there's not ultimate leverage. I can't I can't dictate you shall be here today. It's just not the way the state contract is set up unfortunately. >> I also don't have infinite funds at my disposal. So if there was change orders required with no you are working absolutely over the holiday weekend then I don't have additional funds to apply for for that unfortunately if I did then we would have a different conversation. >> Do they have a man power estimate for the program? >> Uh I have not seen um exactly what the manpower they're they're estimating on that front. Um I guess >> and do they have the people? I guess go. >> Yes, we've certainly we've certainly been assured that >> they are already they are already gearing up with a the personnel in the equipment and um a lot of the equipment will be rented equipment from the greater area. So, they're already reaching out to vendors that they worked with last year to make sure that everything is in line from midocctober to get going. >> But on the monetary, you said you have a budget. Is the state having to cover the cost of this because the manufacturer of those gates should be covering the cost. >> That's correct. So, we have not been covering any additional cost. In fact, we've been holding over a quarter of a million dollars in final payment because of this. So, we've been holding that and they know that we're holding it until this work is satisfactory complete. We were hoping to release it last year after the gate testing. We're open and release it this spring. In fact, we had to go and actually ex >> in order to make sure this work gets done once we discovered that the gates did not meet um testing criteria in the spring because Michael's contract actually expired at the end of June, we had to go back to governor and council to actually extend their contract for another year in order to actually get this done because technically Michael's contract was expired at the end of June. And so we worked with Michaelels to make sure that we could get that extension while still holding that quarter million dollars as part of this project. >> Yeah. That saves you having to go out to bid again. >> Yes. Yes. Certainly. >> Yeah. But I just want clarification when you said you had a budget. This should all be covered by the manufacturer who gave >> equipment was fault too if they installed me correctly too. Right. >> Right. And so that's that's where I I have not been part of the back and forth that Michaelels has had with their with their subcontractor. So I I can't speak on on negotiations that they've had internally on this. >> Is Michael solvent enough to be sure he's going to have enough money to finish before he gets his payment? >> Yes. Yes. Um I will say um there hasn't really been any discussion on the payment or anything like that. It's just been a discussion around how do we get this result. And so that's been so that up to this point there hasn't been any conversations and worry about money or holding money. It's been what do we need to do to get this project done and and get these gates signed off so that we are completely done this project in Goosebond is operating for the next 50 to 100 years. >> Do they have the portaotties on order? >> Any other questions? >> You don't know why. just one quick I know that you get the permits to do this kind of work from wetlands I guess right wild wetland >> and I guess this isn't more of a this is more of a statement than a question I guess but I just find it so hard to believe that wetlands would allow three drains in four years of of a lake with without it seems like without any consideration for the wildlife impact you know I mean when that water went out the first time there were 1 billion muscle shells in that lake You couldn't walk someplace without stepping on a muscle shell, right? And where' they, you know, what happened to the, you know, they all died. How how many years it going to take for the stuff to come back. You know, my wife and I do the water sampling monthly for the lake. And we noticed this year it's very different than it has been in the past. Our phosphorus levels are higher. Our conductivity is much higher. Transparency is in half of what it used to be. And the dissolved oxygen went from like 10 mil milligrams per liter throughout the water column 30 feet to we're at less we're we're less than one at five meters. There's zero oxygen in the bottom half of goose pond right now. The fish can't live less than two or three milligrams per liter. So it's just like I just I don't know. I that's frustrating part for me that wetland says, "Yeah, well just drain it again and fix that dam and we'll be okay." It's like it's impossible. I mean, how many years will it take to get back to where we were? >> Transparency used to be five, six meters. Today, it's three, >> you know, >> it's just all that crap in the water that's decaying. So, they don't have any I mean, as a scientist, they don't have any I mean, nobody came out to study the lake to do a species count or anything that I'm aware of. >> Yeah, I guess it's a question for the lake association. I can certainly talk to Amy Sangula and see what see what they have is I would be curious to see data going back to when it was originally collected. >> Yeah. >> Um to see what occurred between then and now given that the lake was drained in the early 90s to see if there's any data there to see what it took when it was drained in the 90s >> right >> to recover. I don't have that. I I tell you, I'll reach out to Amy in wershed and see what they have for data. >> One last one. Uh the type of contract that you have with Michaels, is it firm fixed price or is it cost plus? Do you do you know? So, is was it a set price and they are set to that price or is there you know you are going to have change orders that you're going to have to pay for but like goes back to your question there is contractually is the state could be held liable still for some additional cost. >> The state could always be held liable for some additional cost. It is it is a firm set price um for the contract. And so and one of the un one of the things that we have to do at the state of New Hampshire is when every contract that we have is there's always a contingency pot for change orders and things like that. You know, one of the biggest contingent one of the changes we had right off the bat is discovering that these old gates were actually we couldn't we couldn't rehabilitate them. So we had to actually remove them and replace them. Um, however, what I will say is all that is upfront. So, when we sign the contract, the way the the way the the way the funds have to get encumbered and the way the governor and council approval process works is the contractor not only sees what that base price is, but also what we have for contingency. So, we work with them on that. But in in the case of Goose Pond is we have only what we have. And that that that messaging has been made to Michael's um from the get-go. In fact, one of the things we actually had to do as well this summer with governor and council is as many of you know this project was funded through ARPA funds through American Rescue Plan Act funding. the that that money that we're holding a quarter million dollars was ARPA funds that if we do not spend them by the end of this calendar year they go back to the US Treasury. >> So one of the things we had to do this summer is actually go to govern first we had to go to the state legislative fiscal committee and then we had to go to governor and council to swap out those ARPA funds with state capital funds. That way we could continue holding that money, use that ARPA money on another project that we have going on because otherwise we would have had to pay Michael's out before the end of the year, right? >> And so we worked with Michaelels to make that switch so that we have capital state funding which does not have the end date and we can continue moving forward. >> So we are holding those funds. >> You could probably fix more dams if you don't have to deal with it all this administration. >> It is a process sometimes. So the interest on that quarter million dollars cannot be put in escrow in case there's any consequences to the lake that needs to be mitigated at a later point. >> So unfortunately no the way our in-house accounting system is um how because basically it's it's it's it's at the the state treasury and then gets moved to us. So unfortunately it's to my knowledge that that cannot occur um just because of the way the inhouse county system works. >> Any other questions on gooseb Thank you. Thanks >> everyone. We're out. with police or the motion to then something up here. >> We have a motion for our truck lease that we have to finalize. I move that the re resolution entitled resolution to authorize $266,173 lease purchase financing of equipment be approved in form presented to this meeting and that a tested copy of said resolution be included with the minutes of this meeting. >> I'll second all in favor >> I >> I said we're not signing. >> You don't have to. Authoriz authorize me to sign it. >> What's that? >> So, authorize me to sign it. >> Uh, I'll make a motion to author Jack to sign it. >> I'll second it. >> I >> uh So, we have uh one nonprofit that we did not approve. We're waiting for some more information. um Terry and uh has put together the whole package. It was submitted. Um so I'm going to make a motion that is approved for Thank you for all that work. >> Any what >> that one completed now. I just want to make sure that >> uh bridge shed proposal. Uh I just wanted to uh keep on the landscape uh the proposal that's we got about a month ago or so um that's we posted on the website and uh circulated um from Masoma uh Valley Preservation Alliance to basically uh buy from the town the freight shed um for $10,000. Um and uh their plan is to uh get grants and funding in the amount of estimated at 540,000 to basically restore the building, turn it back into some sort of productive use, um a business, a restaurant, uh whatever. um basically put it back on the tax rules and u uh basically what of course what they do is they try to restore it to um uh its historic elements and apparently there's there's a number of them there that that they've looked at and uh you can look on the website kind of see some conceptual >> ideas of that >> put probably 50,000 into it too over the years so >> already >> um So, I just wanted to kind of keep it alive to see when uh the board might be um ready or what their thoughts are on it. And um so I'm not necessarily looking for a decision tonight, but I just don't want the the conversation to go stale. Uh I think the only other thing what we had mentioned is what size any lot adjustments because the actual lot that the freight shed is on is what it sets on. It'll be a matter of designating build delineating a lot line as to what they see as necessity as far as parking or >> separate from the local historically. >> Yes, because it is on its own law, but it's like I say, it's just what it sets on. >> Yeah, >> I'd seen recommendations for there's recommendations from them on that. I didn't know but I was I guess I thought that's what the deliation was. Clarify that. So >> I can I can get information on that. I don't have >> Yeah, because I know conversation was they would look to have a lot size that would park six to eight cars. That was a conversation I listen to, but I've never seen anything from them to further that. >> All right. Is there any thought that the town would simply keep some of that property and make it generally parking available for both of those properties which ultimately will potentially be sold versus transferring those spaces to the occupants question. >> I mean we have to come up with a decision on cabins for too. Yeah, which also cost near future. >> And and just just generally for the public, the that the blog store there that the town has had to taxes at the same time as the freight shed that are interested parties or both that want to basically redevelop the property and put it back on the tax roles. And uh and the large shed isn't ripe yet because we're still doing research on when we took it. Was it property? Did we go do all the notices, that sort of thing. Typical stuff we've done with all of the tax needed properties that we'll be disposing of this year. Um but ultimately that we'll we'll have some some discussion. The board's going to have to make a decision about >> I think we need to separate the two now. >> Yeah. Yeah. So I mean if we sell the the lo cabin store um you know it's going to get all that property and that's not right either. So >> right let me let me do a little more research and get back on their thoughts on parking >> a lot a lot online pretty easily one meeting. >> Sure. Let me get a little more information on that. Any other concerns or questions? >> Has one. >> So the freight shed, that's another taxed property. >> It is. >> Didn't know that. >> That that started that came up in discussion eventually a couple of years ago, a couple few years ago. I think we finally some some months ago, we issued an RFP for it. Um and that's what resulted from it >> that the u the caretakers of the building really um Judith >> Kushner and others have actually gotten some of their own money to kind of stabilize it do some stuff. So they've had kind of not only a vested but an invested interest in preserving it and trying to uh leverage it into be rehabilitated, restored and then repurposed. >> Good. Great. Okay. I'd like to move on that sooner than later if we can. >> All right. Thank you, Chair. Um we are going to set Halloween treat hours. >> Oh, sorry. Go ahead. There's a question about the assessments. >> Uh, we'll get that at the end of the meeting. Okay. >> I can't say that late. I'm in bed usually by 6:00 for health reasons. >> Okay. >> I live at 18 Chief's Drive. It's probably the best lot in the whole town. However, a lot of the land is wet. I've already had to replace a wall in the garage and I soon have replaced the basement wall. What's happening is taxation without representation because nobody's come to my yard and nobody's come to my house. The last 25 years of my husband's life, he had cancer. So, nothing has been done to the house except the garage wall and replacement pro deck that caused the problem with the garage wall. I want to know why we don't have assessors that come around in their body to look and see what is really there. Because I'm saddling our seven kids with a white elephant. There's no way anybody will pay that kind of money for that place. >> Okay. So, the assessor is the one that makes that decision and that's the person >> and twice and not received any call backs and I'm going to demand somebody. You're going to have to get the cops to hold me back. >> I mean, you have every right to have the assessor come out and look at your property now. So, I mean, that's that is your right. And you can based on your property card, you may have a very strong argument, but that's got to be done with the assessor before it comes to the select court. And I'm sorry to say that that's that's the person who makes the first >> Well, she better start answering her goddamn phone. >> It's not a woman. It's Brendan. It's a man. It's Brendan is the assessor, >> not Donna. >> No. >> Okay. >> Do you have his name that I can have and call him? >> Brendan. If you stop down at town hall when you get a minute, we can get that. >> Thank you. >> Okay. Um, moving on for approving >> without representation 26 Halloween trick-or- treat hours. Again, that's uh WM, which is out every year. So, we are going to set them for Saturday, October 3rd. I'm sure we can make a motion. >> So, move. All in favor? >> I >> I October 31st, 5 to 7 minutes. >> Thank you. >> Uh water ordinance. We're started looking at water ordinance. We're not going to do too much tonight. Um really uh the last time water ordinance water were looked at was in 1998. Uh so it's obviously time for them to be brought up to speed and taken a look at. There's been a number of questions about a couple different things uh that we need to take a look at. So, I started going through it. Um we have a a template. Uh Scott really just looked at it today. You only got it today. So, um but we are looking at it and uh uh we'll come up with a new set of ordinances for water and sewer or an updated set. Um, and then we'll have a a public meeting to uh bring them up to seat and have them uh uh voted on by the board. Just trying to keep everybody on the board with that. >> Yes. >> Uh Upper Valley Stray Animal Contract for the Police Department. This is, I think, our third year of this renewed contract uh with Upper Valley Humane Society for uh helping the police station pick up strays or or take strays when we pick them up. Uh we already voted on the contract. This is just signing the actual contract. So required. We've already done it. Um, and again, um, I don't know if we're going to, again, we're we're looking at Kianne and Aiden this summer went through a whole process of looking at all the job descriptions of all town employees. Um, and there's a chain sheet here. Uh, again, just letting people know that we are looking at this and, uh, the the level of work that was done. I think there's 100 almost 200 pages of job descriptions uh with the actual job descriptions for all the town employees uh for all the job descriptions. There's a couple things missing just in the in the organizational chart. I come and talk to you at some point and just make sure I got everybody. I know how we did it, but it looks like there's a couple positions that are not on there. So, just want to make sure we get them lined in. Um, and then we'll start to roll on this as we move forward. >> We can actually tell people what their job is. >> Hold them. >> Um, somebody's very trusty. >> You're up again. You got to speak out loud. >> Well, I don't know how much you like it. >> Yeah, I hate it actually. But um I had Nancy write something up because well anyway basically um we gave a revised treefold to Scott last night at our meeting. We had we had um we had put out RFPs and there were we put out I guess Nancy put out four and there were two companies that responded and so we >> or how many? Oh, I I don't know the total number of trees, but it's for like three cemeteries, >> four maybe. >> Um, but in any case, we finally uh decided on uh the lower estimate, but we were shocked at how much it was. So we met again and said well maybe we can eliminate some of the trees that you know were like we'd like to take care of this branch or we'd like to remove this one because it could come down versus what really needs to h have to happen their emergency type things. So, we revised the quote and the cheap one, the original one was $29,200 and that was for um Scott, do you have your copy of the the new one? You don't have the original one, but no. >> Um Oh, all right. Which portion of the >> um well that we have um the Wells Annex and the Cananan Street Cemetery. There were uh one, two, three, four. There were seven maples that needed um deadwood uh limbs removed. One of them needed to have some kind of like cabling put up to help hold it. I don't quite understand it all. Um, but there were two that needed to be cut completely. Um, that's in Kanan Street. And then in Wells Annex, there's there was one small tree where there were branches that are hanging over the shed that's there that are like I think they're getting in the way of the wires or something. But for Wells Annex and Kanan Street, it was $9,000. And then Wells Cemetery, which is the cemetery that we have funds for. >> Um we had one, two, three, four, five, six. Six trees to remove, but we decided to um remove one of the pines. We weren't going to deal with that. um their original cost for the well cemetery work was 16,200 and we reduced it down to 10,600 and then we had a $4,000 cost for um four trees in Birch Corner and we completely removed Birch Corner out of the out of the bid. So our new our new total is $19,600. The problem is we only have $11,000 in our in our budget. So we >> Yeah. So we Nancy wants permission to overspend our budget by about $8,600. >> Okay. >> Um there might be a little bit more money in there that we can take out, but there's we're not really sure. There isn't a whole lot in there. Um, the amount that we have in our budget would take care of Kanan Street and Wells, which is 9,000, but the tree company is asking for a 50% or they're demanding a 50% deposit, which is $10,000. >> So, that's why we're, you know, we need to like juggle some money around. Does Wells annex have funds because it's part of Wells actually? >> No. No. >> I knew that's how we got it. >> Yeah, that's part of the problem. I was guess it was a new purchase. >> What was that, Ellie? >> I'm just saying I'm a trustee, too, so what I say counts, too. But just let you know that Pen and Nancy have done a tremendous amount of work on this for over a year. This has been going on for over a year and it needs to be done. And we've listened to people complain on Facebook and everywhere else. And if you want to have another, if you don't follow through on this, we're going to have another episode. I spent eight years before, and I'm just talking for myself. eight years from 2008 until 2016 trying to get the select board to cut those trees in soya hill and we've damaged stones in there and why somebody hasn't come to you guys to complain to have them fixed I don't know but if these don't get done that's what's going to happen is you guys are going to be liable for having to fix the stones but we have money like but we don't know how much in in wells to pay for some of it and we also have another fund called the Mildred Nex fund that we can pay for anything in well as long as it's in well cemetery. >> So those are priorities and they've cut back everything that they have put on that list is things that are urgently needed. It's not a wish list or anything else. It's stuff that needs to be done soon before the end of the year. >> I see you. Okay, that's just my Lynn can, you know, give hers too, but I just want to know that we've done a lot of work and we don't get paid. So, um, >> so and and mostly it was Lynn and Nancy that did it all and they deserve a lot of credit. >> Agreed. >> So, just say yeah, >> want to weigh in on money situations? So, we're looking at 9,000 that you don't have. >> Like roughly 8,600. >> Yeah. >> But that's like immediately. I mean, we can definitely pay it back, >> but we just need to we need to we need to um come up with a deposit which is going to that kills our budget right there. >> Is the amount in a tree budget repeat every year? This is the first year we've been able to for a tree. We were hoping to have it, >> but the collection never spent it. They spent it on other stuff. We had like a a surplus of like $30,000 in our budget two years ago that somebody else got to spend. >> So, basically, trees have been deteriorating. >> So, we have a good amount of trees >> that really need to be taken care of. So, I would say probably the next few years we're going to have to have some big tree work done. >> That's exactly where I was going. If if every year there's a certain amount of money put in for trees and given we're already in October. >> Yeah. >> Maybe just roll it roll it into roll it into two. >> Did 20 almost 20 years ago we did this. >> Every year I was on the on on the on the cemetery trustees. We put money in the budget and it never got spent on >> free. But but we're talking about today. So, okay. And we're trying to we're trying to help here. We're not trying to shut you down. Okay. >> We had plenty of time. Do it. >> Like like I would say with most department heads, if you don't have enough money this year, put it in next year's budget. >> That's my plan. Um, but we were like when we when Nancy first talked to one of the tree people >> um like a year ago his quote was like half this amount. So she was just absolutely shocked at how much and and the other one was even higher. It was like 30 something,000 and it was like oh my god. >> So this was the first year we're trying to catch up past you're absolutely right. It's just the fact that now knowing what this is and going back to your point it's like okay you know what would sought to be 11,000 whatnot next year it's like okay we'll increase it to compensate for >> but this being the first year it's kind of a learning curve going down and needs to be done otherwise >> it's just going to compound on the issue >> what does Kianne had to say about >> yeah I was gonna say it's midepptember and we haven't spent the contingency budget yet we still have the contingency fund Anybody else want to weigh in? Since we're I'm going to make a motion that we approve this uh expenditure. >> I'll second that. >> All in favor? >> I depend on the contingency. >> What's the contingency budget? for cemeteries. >> Oh, no. No. I just was wondering what it was. >> I was just wondering what it was. That's all. >> It's a town rainy day. >> Oh, I see. >> A year ago. Last year. >> Yes. >> Well, thank you. >> Thank you for everything you guys been doing. So, it's much needed. I appreciate. >> When did we have one more request? Did we have one other thing you wanted to ask, but I forgot what it was? >> Uh, no. >> No. So, >> not now. >> No, too late. >> Are you discussing town property for sale? >> The um ordinances >> that's already been done. >> We already have it. I sent you an email earlier today. It's all set. >> Thank you. Okay. Yeah. >> So, um, as you know, you're you you've got, I think, seven properties that are going to go up for a sale auction on October 24th, uh, right in this room at 10 o'clock in the morning. Um, and, um, the only official that that kind of needs to be available is for somebody to sign off on the auction sale documents. And so one of you uh a prestigious gentleman could actually >> there's only one here >> attend attend that meeting and sign those documents. Um >> what's the date >> or you October 24th? It's a Saturday >> Saturday. >> It is. Yeah. >> Um >> great. Thanks. >> So I just want to bring that to your agenda. I know the three of us will be here. One of one of you will more than likely be. >> Okay. This be a good time to vote for Satie because she's not here to >> No, that that'll come back in place. >> Okay, that's good. I just wanted to be be sure you knew that because those that isn't going to take long. They don't think it'll take more than an hour to get kids open make get her done. >> Okay. >> So, you won't be here long. >> Yes. So you say I promise. What else you got, Jack? Um um not not too much. Just in the interest of of time, I just want to give you a little update on the generators. I know we've talked about them for the last couple years. We actually have have them under contract. Um the um the generator at the water plant uh is actually up and running. Um, one of the things that happened with it, it was simply unplugged and so the battery the battery wasn't being charged. There are some other routine maintenance because it doesn't maintain things. Um, the depot tree the depot pumping station generator has been broken for years. Apparently, it is not repairable. um the the hoses and wires, they're all dried and crumbled and and rusty. I mean, it's just terrible. So I will be um um looking working with um our engineers on not only the continuing effort to rebuild uh and try to find a reasonable solution to that pumping station >> um but also depending upon what the solution is we might be over here by a smaller generator because that pulls a lot of power right now. But again, we're we'll be having a meeting tomorrow at 11:30, Scott, which you're also invited to if you want to. >> I can't go on that. Oh, yeah, you can. Oh, so you're required to attend. >> No, I am going. >> Oh, you are going. Oh, okay. Good. Um, >> so you know, that is one of those requirements. We should have been working all along, but it's been broken for years. Um and the wastewater treatment plant also has a generator which is um disintegrating according to the report uh from the maintenance people. So uh we we have two two of those generators that have not worked in years um that I'll have to scope out some sort of replacement for. I am going to look at uh the state of New Hampshire because I uh it used to be that Homeland Security Emergency Management used to have some grant funds kind of a 50/50 split for emergency generators on the water side of things. I'm not sure if they have to on the wastewater side of things but >> I'm not sure because that's where number of these municipalities those generators they're as large as they are because they were uh surplus >> that they turned over to the towns. Yeah, >> we'll just move the water plant one there and then >> but anyway, so we'll work on that. The u the fire department uh police station um that one uh needs about $3,800 worth of work. It it also hasn't worked in in some number of years. And so I subject to your consent, I'll I'll I'll approve that $3,800 repair on that one. >> So we're making some progress. three cool just a little more money to spend fixing things. >> Nothing that money won't fix. >> Yeah. Um and we have started flushing the water lines uh which again we talked about uh last week. Um and um that of course followed on on the discussion that all of the hydrants endowment likely don't work because they've never been exercised properly. Um, so, uh, we're we have a plan for those as well. We'll get some parts and inventory just in case things break. Um, but we have a plan that's already on the website and the newsletter about the, uh, waterline flushing schedule. So, uh, most people will see some discolored water after that. So, just let it run until it's clear. that actually should uh at least uh uh in our conversations with dees help with the discolored water that some people have complained about. I know we've tested that water that was discolored. It doesn't violate anything. It just is an appearance issue. Um, but the waterline flushing will uh will actually become routine as it should have been all along and will actually flush all of the lines, not just the ones where the hydrants work. >> So, onward and up. Um, subject to any questions, I'll I'll leave it at that. We we continue to Potato Pot potato road bridge is actually due to go out to bid this fall. Um >> so it's still on schedule. >> Yeah. Well, yeah, it's a it's it's been on the 2027 schedule >> and um that bridge is expected to cost about $3.4 million. >> Uh the construction of it is 100% federally paid for. Um the uh design of it is 80% paid for by state funds and um we have to pay 20% of the design costs which are about $80,000. Um so so far we have because these are reimbursementbased projects we've actually already paid $321,000 for the design of it. And uh I was speaking with the engineers today. We're because this has now been approved by DOT to go out to bid, we'll actually be getting 320 320 321,000 back >> that we've already spent. So again, this will be kind of a cycle with some of these bridges. Obviously all of these bridges which we'll be fixing in 27 28 29 potato grist mill transfer station that's all in it's a $12 million >> package uh at the end of the day uh we'll only be on the hook for about 800,000 total. That's not a small amount of money, but when you look against what those projects cost that we're already under contract for, by the way, because a lot of money's been spent on >> paid out half the >> Yeah. Gris Millill Bridge uh will go out for construction uh well go out for bid in 2027, construction around 2028. That is a $6 million bridge. It's a very big bridge and um we'll be on the hook for 20,000. It's 100% paid for by the federal government on design and construction. We had to pay 20% of the engineering study. We spent 119 119,000 on that. So, we're in for about 20 grand. So, we're getting a $6 million bridge for $20,000. And the transfer station bridge um is estimated at the moment to be in the $3 million range. Um um I mentioned that before. That's an 8020 state and federal split. Um and so that that one will be a little more expensive for us because it's more of our bridge, not not somebody else's. Um and that that that will cost us about 700,000. So um but again that's not till 2029. We will likely have to update uh some of the bonding warrant articles because when some of the bridge projects were originally teed up uh in >> in 2020 2020 actually um because of of cost escalations and that sort of thing. I can imagine we'll have one or more warrant articles to update those prices. Again, we've we've agreed to do these projects. We have to do these projects. These roads are very important. Um the overall cost to us, while significant, is is it's a small amount compared to the actual cost. >> Yeah. Because we've already had a co initial cost increase on the transfer station bridge. >> Oh, yes. just because of mandatory design changes that we had to do. >> Yeah. Yeah. >> So, other than that, life is good. We're making some subtle changes to some of the office structures in town hall. It's it's either been done by donated materials or um staff labor uh on the weekends. So, not a lot of money there. Other than that, life is good. Um I just want to say that uh a formal announcement will be coming out but um our new fire chief started this week uh Jeremy Tibbo KBO >> TBO. Um so I mean look for he's got a a long resume of success in the upper valley and he lives in Kanan uh which we're we're kind of lucky to have that as well. So um I know he's been meeting with some of the fire staff and everything else from what Jack told told me. I have not seen him since he started, but um I hope to shortly. So >> So I just want to let everybody know that, you know, that's that's a good thing for the community, too. So >> one more step forward. >> Yeah, Kelly. >> Yeah. When we're talking about fire hydrants, I noticed that the fire hydrant, it's on the corner between Route 4 and School Street, has got like a plastic bag. >> So I'm assuming that's one of the ones that was tested this week and it probably failed. So, >> okay. So, it's going to be replaced. >> Can't even open it. >> Yeah. So, >> well, are you ever going to come to my house and look at >> Yeah, we're going to do the whole town. The schedule is out there, Ellie. The schedule's out there for you to see. >> So, the day you flush, it's on the schedule. You'll be you're testing the hydrant. It said water system flushing, and I didn't know what that meant. >> We're testing all the fire hydrants. >> You're testing the whole system. >> Well, you you you use the fire hydrant to flush the water. >> Oh, that's what I thought. Okay. You just want to make sure. Okay. >> And so to the extent that we try to flush the water lines and the hydrant has a problem, we'll have to fix the hydrant. >> So I'll look for them then. Okay. Because the fire department used to do this back in the olden days when we had just volunteers. They used to do it on a regular basis. They haven't done it in a long time. >> Thanks. Okay. Good. >> So out of seven hydrants, you have one that failed. >> I don't know. I don't have the schedule in front of me. Uh >> four that are couldn't even find the gate valve and the tool and I put a 10 pound sledgehammer to and I couldn't even get >> because there was a fire I mean this was like 50 some odd years ago and there was a fire across the street from my house in the middle of January and it I assumed it was frozen but they ended up we had just bought the tanker and pumped it they pumped it out of the river so luckily >> you know I live near the river so as long as this water river >> I want to thank uh the DPW and the water department for jumping right on it I mean it was just brought to our attention two weeks ago that this was an issue and had not been done. So, we'll move it as quickly as we can to get it. >> Uh that was 67 by Tucker. >> September 18th is your street. >> Is there like a preventive maintenance for loose fire hydrants? Like I know when I worked in the town where they they they had them like scheduled almost yearly. >> That's supposed to be what was happening all along and the board was under the impression that that was happening with with our it was not. So or it was halfhazardly working with the ones that he knew worked and opened up. So >> again that was brought to our attention. Right now the plan is to kind of have another scheduling of flushing probably sometime mid late October too and then another one be Aprilish May and then October of next year how it's kind of laid out right we have any issues. >> Um the other thing that's coming online shortly is we we're contracting out for Sterns to start pumping uh the individual septic tanks at each of the houses because that hasn't been getting done on a regular schedule either. uh basically uh they were getting pumped when the failed or they were full. So uh that's not acceptable as well. So they're going to start doing a third a year. Uh there's some other I mean there's a couple locations that are high high volume that even more recently that they're coming on board this fall to start doing that. So >> do we not have a used to have a septic tank? Uh the pump failed on it, but it really was the manpower of doing it ourselves is really not realistic and that's probably why it wasn't getting done in a >> less. No, but I was just curious cuz that's not in the surplus auction. >> Uh well, it it just broke. It's uh we haven't made a decision on if we're going to uh we're looking for a pump to see how expensive it is. Um yeah, >> you know, it's a good thing to have in case of emergency, but uh it's really not was never designed for basically being having daily use like it needs. So, >> okay. >> Anything else? >> Oh, one more question. Um you said that you seven properties properties. >> That's correct. >> The taxed properties. >> That's correct. >> Okay. And is there a way we can find these online? Yeah, they'll be we're going to put them up on the uh the website probably in the newsletter. I'm awaiting probably in the next few days the um material from the auction house that will identify them. >> All right. So, we got to have the same auctioneer doate is doing vehicles. >> Okay. All right. Good. All right. I'll look for it. Thank you. >> Make a motion to move. All in favor? High five. Thank you. Thanks everyone.