April 2026 MPO Minutes (PDF)
The MPO approved the minutes of March 24, 2026, with Messrs. Laverdure, O’Neil, Ali, Somers, Battaglia, and Mmes. Kunhardt, Vadney abstaining. TIP Amendment #4 was adopted unanimously, removing 2026 construction funding for the Candia-Raymond 43889 rehabilitation project, moving Derry Londonderry 13056C construction funding beyond the TIP horizon, and shifting right-of-way funds for Hooksett 29611 to fiscal year 2028. The amendment also increases Section 5339 MTA funding for 2026–2028. Regarding the FY 2029-2038 Ten-Year Plan, SNHPC will verify existing municipal projects rather than soliciting new ones due to funding constraints. Contingent priorities for reinstated funding include the I-293 Exit 6 and Exit 7 reconstruction. An RFQ for on-call engineering services will be released in early May to replace the VHB contract ending June 30. Vice Chair Schnakenberg adjourned the meeting at 12:16 PM. Source: https://www.snhpc.org/DocumentCenter/View/2808/April-2026-MPO-Minutes-PDF
1 Minutes of the SNHPC METROPOLITAN PLANNING ORGANIZATION April 28, 2026 11:30 A.M. Meeting held in-person at the SNHPC office (438 Dubuque Street, Manchester, NH). Virtual participation was also accommodated via Zoom. MEMBERS PHYSICALLY PRESENT Bedford Ed Comiskey, Alt. Bedford John Nelson Bedford Marc Snyder Candia Ron Laverdure Chester Deb Munson Deerfield Erroll Rhodes Derry John O’Connor Derry Richard Tripp Francestown Gary Schnakenberg, Vice Chair Francestown Linda Kunhardt Goffstown Jo Ann Duffy Londonderry Arthur Rugg, Secretary Londonderry Deborah Lievens Londonderry Suzanne Brunelle Manchester Dan O’Neil Manchester Peter Capano Manchester Raymond Clement, Treasurer New Boston Ellen Kambol Windham Edgar Lapointe MEMBERS VIRTUALLY PRESENT Bedford Nadir Ali, Alt. Francestown Jennifer Vadney, Alt. Goffstown Barbara Griffin Goffstown Jacob LaFontaine Hooksett Mike Somers Londonderry Brian Battaglia New Boston Jonathan Willard NHDES Jack Wade NHDOT William Rose MEMBERS EXCUSED Auburn Bill Jean, Chair Chester Andrew Hadik GUESTS VIRTUALLY PRESENT STAFF VIRTUALLY PRESENT Ben Herbert Mobility Manager Adam Hlasny Sr. Transportation Planner VOTING REPRESENTATIVE SEATS VACANT Candia Weare Manchester Airport MEMBERS ABSENT Auburn Chris Sterndale Bedford Dan Heath Bedford Danielle Evansic Chester Dana Theokas, Alt. CNHRPC Craig Tufts Deerfield Fred McGarry Derry Jeff Moulton FHWA Leigh Levine Hooksett Jarrod Williams Hooksett Sheena Gilbert Londonderry Jeff Penta, Alt. Londonderry Patrick Cheetham, Alt. Manchester Elyza Agosta Manchester Kevin Sheppard, Alt. MTA Mike Whitten MTA Ryan Renauld-Smith, Alt. MTA Tracey Whitehead, Alt. NHDES Jessica Wilcox NHDOT Bill Watson NHDOT Denise Sherburne RPC David Walker Strafford RPC Colin Lentz Windham DJ Withee Windham Peter Griffin Windham Tom Earley STAFF PHYSICALLY PRESENT Sylvia von Aulock Executive Director Nathan Miller Deputy Executive Director Aloyo Yen Office & Finance Administrator Suzanne Nienaber Principal Planner David Tilton Sr. Transportation Planner James Vayo Principal Planner Zachary Swick Senior GIS Analyst Liliana Vornehm Assistant Planner Hl!!llilf H A M-P'& f-fi J .11 ! SNHPC Southern New Hampshire Planning Commission 438 Dubuque Street, Manchester, NH 03102-3546, Telephone (603) 669-4664 Fax (603) 669-4350 www.snhpc.org 2 CALL TO ORDER Vice Chair Schnakenberg called the meeting to order at 11:40 AM. A quorum was present. ACTION ON MINUTES OF MARCH 24, 2026 Motion by Mr. Rhodes of Deerfield to approve the minutes of March 24, 2026. Motion was seconded by Mr. LaPointe of Windham, and carried with Mr. Laverdure, Ms. Kunhardt, Mr. O’Neil, Mr. Ali, Ms. Vadney, Mr. Somers, and Mr. Battaglia abstaining. The vote was taken in conjunction with the roll call. OLD BUSINESS (none) NEW BUSINESS Consideration of TIP Amendment #4 Senior Transportation Planner David Tilton provided an overview of TIP Amendment #4, which had a 10-day public comment period from April 13 to April 24. TIP Amendment #4 includes the following project changes. • Candia-Raymond 43889 (rehabilitation and reconstruction of a section of NH Route 101). The proposed amendment involved removing construction phase funding in 2026 and adding engineering phase funding in 2027, reflecting a schedule change. • Derry Londonderry 13056C, (construction of Tsienneto Road from Pinkerton Street to NH Route 102). The proposed change was to move construction funding beyond the TIP horizon due to a schedule shift and additional right-of-way acquisition time needed by the NHDOT. • Hooksett 29611, (Reconstruction and widening of US 3/NH 28 from NH 27/Whitehall/Martin’s Ferry Rd to Alice/West Alice Ave.) The project schedule has changed, with right-of-way work extending into fiscal year 2028, resulting in a portion of right-of-way funds being moved beyond the TIP horizon. During the 10-day public comment period, one proposed change was received. The proposed amendment increases Section 5339 MTA funding for fiscal years 2026–2028 to utilize unobligated funds from previous years. SNHPC has worked closely with both NHDOT and the Manchester Transit Authority to process this change. Mr. O’Neil of Manchester made a motion to adopt the TIP Amendment #4, seconded by Mr. Rhodes of Deerfield. The motion passed unanimously. Discussion of FY 2029-2038 Ten-Year Plan Process Deputy Executive Director Nathan Miller discussed the upcoming 10-Year Plan (TYP) process. The current TYP for 2027 to 2036 is still under review by the legislature. Mr. Miller noted that preparations have already begun for the next plan covering 2029 to 2038. He explained that the plan includes all transportation modes such as highways, transit, and airports. 3 Mr. Miller outlined the typical Ten-Year Plan update process: • Starting in spring of even years, RPCs review and update project prioritization criteria and solicit project submissions from municipalities. • Submitted projects are reviewed and prioritized through engineering evaluations with an on-call engineer. • Candidate projects are then prioritized, and an initial shortlist sent to NHDOT for feedback. • NHDOT’s internal Ten-Year Plan committee will review and provide feedback, after which the shortlist will be refined into a final, fiscally-constrained set of regional project priorities. • These priorities will be submitted to NHDOT for inclusion in the draft Ten-Year Plan, which will then proceed to public hearings via the GACIT process (Governor’s Advisory Commission on Intermodal Transportation). Mr. Miller noted that this will be a different update cycle due to ongoing funding constraints, similar to the previous TYP cycle, including stagnant federal revenues and higher construction costs. NHDOT has advised that no new project solicitations be conducted for the 2029–2038 plan, given the current funding limitations. Instead, SNHPC will focus on reviewing and verifying the scope and necessity of existing Ten-Year Plan projects with municipalities. Mr. Miller proposed a contingency plan in case of unexpected funding increases. Historically, federal reauthorizations have resulted in level or increased funding. If additional funds become available, the first priorities for reinstatement would be the projects in the region cut in the previous Ten-Year Plan, including: • I-293 Exit 6 and Exit 7 Reconstruction • Manchester 44221 - Exit 8/Wellington Road Improvement Project • Deerfield 44223 - Intersection Safety Improvements (Route 107/Candia Rd./Church St.) If further funding is available, the next set of priorities would be projects previously queued for inclusion in the 2027–2036 plan, but not funded due to financial constraints: • Engineering Study of Beech and Maple Street Active Transportation Opportunities (Manchester) • Add Supplemental Funding to Project 13692F to Include Preliminary Design of the Multiuse Path as part of the NH Route 101 Engineering Study (Bedford) • Intersection Improvements at I-93 Exit 11 and Hackett Hill Road (Hooksett) • Windham Greenway Trail Improvements (Windham) • Add Supplemental Funding to Project 44221 to Extend Bicycle Lanes to Lindstrom Lane (Manchester) • Town Center Roadway Improvements (New Boston) Mr. Tripp inquired if any projects were removed from the plan. Mr. Miller noted that I-293 Exit 1 in Manchester was initially cut but later reinstated by GACIT at their final meeting. He expects it will remain, but if removed, it will be prioritized for re-inclusion if additional funding becomes available. Future funding remains uncertain, especially with the pending federal transportation reauthorization. Discussion: • Mr. Tripp inquired about funding for engineering support. Mr. Miller confirmed that the Unified Planning Work Program provides funding for on-call engineering services, which are used for project scoping and maintaining the regional travel demand model. • A question was raised about whether increasing tolls for out-of-state drivers would affect project funding. Mr. Miller stated that higher toll revenue could facilitate funding for the Exit 6 and 7 projects, which are turnpike projects. Advocacy for these projects remains a high priority due to regional safety benefits. • Mr. Rose from NHDOT advised everyone to monitor Senate Bill 627, which proposes toll rate adjustments for the New Hampshire Turnpike system. Next Steps: Mr. Miller advised that, in the coming weeks, SNHPC will correspond with municipalities to verify the existing projects in the Ten-Year Plan are still priorities. A solicitation for on-call engineering services will be conducted, as the current contract with VHB ends June 30. The RFQ is expected to be released in early May, pending NHDOT review. SNHPC aims to have an on-call engineering firm in place for upcoming project work and updates. OTHER BUSINESS (none) ADJOURNMENT Motion to adjourn by Ms. Kunhardt of Francestown, seconded by Ms. Kambol of New Boston, and carried unanimously. Vice Chair Schnakenberg declared the meeting adjourned at 12:16 PM. I hereby certify that this is a true and correct copy of the minutes of the April 28, 2026 meeting of the Metropolitan Planning Organization of the Southern New Hampshire Planning Commission. N~ Nathan Miller, Executive Director Aloyo Yen, Office and Finance Administrator/Recording Clerk 4