March 2026 MPO Minutes (PDF)
Meeting Minutes for March 24, 2026: The minutes from January 27, 2026, were approved. The SNHPC reviewed the Manchester Combined Sewer Overflow (CSO) project. This $600 million initiative, funded by sewer revenue bonds, includes the TBM contract costing $360 million. The group discussed the construction timeline for the 2.25-mile Cemetery Brook Drain Tunnel, with drilling expected to begin around fall 2026. The MPO considered FY 2025-2028 TIP Amendment #4. Key actions include delaying Derry-Londonderry project 13065C construction funding due to right-of-way needs and shifting Hooksett project 29611 construction to 2031-2033. A public hearing on the amendment is scheduled for April 28, 2026. Chair Jean adjourned the meeting at 12:44 PM. Source: https://www.snhpc.org/DocumentCenter/View/2679/March-2026-MPO-Minutes-PDF
SNHPC Southern New Hampshire Planning Commission 438 Dubuque Street, MMchester, NH 03102-3546, Telephone (603) 669-4664 Fax (603) 669-4350 www.snhpc.org Minutes of the SNHPC METROPOLITAN PLANNING ORGANIZATION March 24, 2026 11:30A.M. Meeting held in-person at the SNHPC office (438 Dubuque Street, Manchester, NH). Virtual participation was also accommodated via Zoom. MEMBERS PHYSICALLY PRESENT VOTING REPRESENTATIVE SEATS VACANT Auburn Bill Jean, Chair Candia Auburn Chris Sterndale Weare Bedford Ed Comiskev, Alt. Manchester Airport Bedford Marc Snvder Chester Andrew Hadik MEMBERS ABSENT Chester Deb Munson Auburn Jeffrev Porter, Alt. Deerfield Erroll Rhodes Bedford Dan Heath Derry John O'Connor Derry Richard Trioo Bedford Danielle Evansic Bedford Nadir Ali, Alt. Francestown Garv Schnakenberg, Vice Chair Goffstown Barbara Griffin Chester Dana Theokas, Alt. CNHRPC Matthew Baronas Goffstown Jo Ann DuffV FHWA Leigh Levine Londondenv Arthur Ruaa. Secretarv Francestown Jennifer Vadnev, Alt. Londondenv Suzanne Brunelle Hooksett Jarrod Williams Manchester Dan O'Neil Hooksett Sheena Gilbert Manchester Elvza Aaosta Londonderry Brian Battaolia Manchester Kevin Sheaaard, Alt. Londonderry Jeff Penta, Alt. Manchester Peter Caoano MTA Mike Whitten Manchester Ravmond Clement Treasurer Manchester Marcus Ponce de Leon, Alt. New Boston Ellen Kambol NHDES Jack Wade New Boston Jonathan Willard NHDES Jessica Wilcox Windham Peter Grtffin NHDOT Bill Watson Windham Edgar Lapointe RPC Tim Roache Strafford RPC Colin Lentz MEMBERS VIRTUALLY PRESENT Windham Tom Earley CNHRPC Craia Tufts Derrv Jeff Moulton STAFF VIRTUALLY PRESENT Goffstown Jacob LaFontaine Adam Hlasny Sr. Transportation Planner Londonderrv Deborah Lievens Anthony Summers Field Technician NHDOT Denise Sherburne Cameron Prolman Senior Planner Windham DJ Withee STAFF PHYSICALLY PRESENT MEMBERS EXCUSED Svlvia von Aulock Executive Director Bedford John Nelson Nathan Miller Deoutv Executive Director Candia Ron Laverdure Aloyo Yen Office & Finance Deerfield Fred McGarrv Administrator Francestown Linda Kunhardt David Tilton Sr. Transoortation Planner Londonderrv Patrick Cheetham. Alt. James Vavo Princioal Planner MTA Rvan Renauld-Smith Alt. Suzanne Nienaber Princioal Planner MTA Tracey Whitehead, Alt. Zacharv Swick Senior GIS Analyst NHDES Mac Bevier Liliana Vornehm Assistant Planner RPC David Walker GUESTS PHYSICALLY PRESENT GUESTS VIRTUALLY PRESENT Manchester DPW Robert Robinson Parsons Moll Foster A1b1ua• 0.0lord • Candia• Clltsler•o .. u itld • D.rry• GoU110111n •Hooks ell• Lond 01de11y• Manc h Hier• N•w Bosio•• Raymoad•Weart CALL TO ORDER Chair Jean called the meeting to order at n:36 AM. A quorum was present. ACTION ON MINUTES OF JANUARY 271 2026 Motion by Mr. Rhodes of Deerfield to approve the minutes of January 27, 2026. Motion was seconded by Mr. Rugg of Londonderry, and carried with Mr. O'Connor, Mr. Schnakenberg, Ms. Duffy, Ms. Brunelle, Ms. Agosta, and Ms. Kambol abstaining. The vote was taken in conjunction with the roll call. OLD BUSINESS (none) NEW BUSINESS Guest Presentation: Manchester CSO Project City of Manchester Combined Sewer Overflow Project History Robert Robinson, Chief Engineer of the Manchester DPW Environmental Protection Division, provided an overview of the Manchester Combined Sewer Overflow (CSO)' project's history, tunnel design, and current construction status. He explained that the project began in the 1990s with engineering studies and initial separations, followed by Phase 1 from 1999 to 2009, which had a budget of $58 million and included eight separation contracts on the west side of the city. Phase I included new/rehabilitated sewer and drains. Added benefits of the program were reconstructed roads, new/reset curbing, new sidewalks, and more. Phase II is a continuation of the CSO effort, centered around a project to construct the Cemetery Brook Drain Tunnel. Cemetery Brook Drain Tunnel Project Overview A video of the City of Manchester's Cemetery Brook Drain Tunnel project was shown, featuring Mayor Jay Ruais. Mayor Ruais highlighted the project, a major infrastructure initiative in collaboration with the US Environmental Protection Agency and the New Hampshire Department of Environmental Services. The project involves constructing a 2.25-mile, 12-foot-diameter stormwater tunnel beneath Queen City Ave and Mammoth Road to reduce sewer overflows and improve water quality. Key construction activities include mechanized excavation of a rock shaft, installation of drop shafts for tunnel access and machine retrieval, and construction of a stormwater inlet and outfall structure. The project has been planned to minimize disruptions through limited impact areas, noise and vibration controls, pollution controls, and ongoing community outreach. Cemetery Brook Drain Tunnel Route and Project Details Mr. Robinson discussed the details of the Cemetery Brook Drain Tunnel project and locations of seven drop shafts (DS 1-7) along a railroad corridor, which begins near Queen City Ave by the 2 Merrimack River. The drop shaft sites will be developed sequentially along streets such as Brown Ave, Queen City, Beech, Union, Somerville, Maple, Wilson, Valley, Taylor, and Massabesic. It crosses near Elliot Hospital, with key sites like DS-6 and DS-7 involved in drainage and tunnel infrastructure, extending from Queen City Ave to Massabesic Street. Mr. Robinson noted that the active launch zone and drop shafts 1-3 targeted for construction from summer 2025 to fall 2026. The Tunnel Boring Machine (TBM), disassembled in Germany, is expected to arrive in late May and be assembled at the Queen City location, with drilling to begin around fall 2026 and last approximately 18 months. Detailed subsurface mapping will ensure proper tunnel development. Subsurface Investigation Prior to starting design, the geotechnical exploration was initiated, involving approximately 170 borings over two and a half years along the profile, extending 80 feet underground in some areas. The drilling allowed mapping of subsurface conditions crucial for tunnel design. Cemetery Brook Drain Tunnel Design and Construction Senior Engineer Molly Foster reviewed the design and construction sequencing of the Cemetery Brook Drain Tunnel project, including the tunnel's path through various soil types and rock, with the machine progressing approximately 40 feet per day. She discussed the launch site excavation and the outflow structure, which has features incorporated to slow water before it enters the river, protecting wildlife and preventing washout. Logistical challenges include multiple work sites, utility coordination, and spoils management. Discussion: • A question was asked about the handling of residue produced by the tunneling. Mr. Robinson explained that the material expelled during tunneling with the TBM will be directed to various locations depending on its composition. Material will be tested as it is removed. He noted that the type of soil to be encountered varies, including both rock and other soil types. In the case of pure rock, the material can potentially be reused, as it is considered valuable and suitable for reuse. • A question was asked about the dimensions of the rock. Mr. Robinson explained that cores are extracted, typically two inches in diameter, and drilled through after boring. The depth varies. • Ms. Lievens asked if there would be effluent water going into the pipes, if so, how it would be treated before it gets to the river. Mr. Robinson said it would be purely stormwater and that it would not be treated. • A question was asked about property acquisitions. Mr. Robinson said they acquired four properties and had to establish easements and subterranean easements. • A question was asked about the total cost of the project and where the funding comes from. Mr. Robinson said that the TBM contract costs $360 million, and total CSO project expenses, including engineering, property acquisitions, and future separation, exceed $600 million. He noted that the program spans 20 years and is funded by sewer revenue bonds. 3 • A question was asked about the bike path near the outflow. Mr. Robinson said that the bike path will be rerouted around the outfall structure. • Ms. Griffin inquired about the quantitative measures of water quality improvement after the project is completed. Mr. Robinson said that it's not something that can be easily measured. Overview of FY 2025-2028 TIP Amendment #4 Senior Transportation Planner Dave Tilton explained the Project Development Process and how the Transportation Improvement Plan (TIP) fits within it. He noted that the Metropolitan Transportation Plan (MTP) is a document produced by the MPO that identifies regional projects for the Ten-Year Transportation Improvement Plan (TYP). The TYP is a state-level process and is currently in the hands of legislators. The TIP covers the first four years of the TYP, focusing on projects closest to implementation and construction. This is the fourth amendment in the current cycle. Mr. Tilton presented the proposed changes to the Fiscal Year 2025-2028 TIP Amendment #4. He mentioned that the changes will be released for public comment starting April 1ih. The MPO will consider adopting the following changes at a public hearing on April 28, 2026: • Derry-Londonderry 13065C: Moving the construction phase funding beyond the TIP horizon due to additional time needed for right-of-way acquisitions. • Hooksett 29611: Decreasing right of way funds by moving a portion of right of way funding outside of the current TIP horizon. The project development schedule now has right of way phase work continuing beyond FY 2028. Construction phase work for this project is now scheduled for 2031 - 2033. OTHER BUSINESS (none) ADJOURNMENT Motion to adjourn by Mr. Hadik of Chester, seconded by Mr. Capano of Manchester, and carried unanimously. Chair Jean declared the meeting adjourned at 12:44 PM. I hereby certify that this is a true and correct copy of the minutes of the March 24, 2026 meeting of the Metropolitan Planning Organization of the Southern New Hampshire Planning Commissio . Sylvi von Aulock, Executive Director Aloyo Yen, Office and Finance Administrator/Recording Clerk 4