CIP Meeting August 27, 2026
Speakers are labeled SPEAKER_N. This transcript is machine-generated.
Good morning, folks. >> All right, good morning everybody. [cough and clears throat] We'll go ahead and get started. Thank you all for coming. Uh, this is the Thursday, August 27th, 2026 meeting of the planning board and the board of selectmen. Hey, Marian. Sorry. We're just going to jump in. Hi. That's all right. Good morning, everybody. Thanks for coming. Uh just a reminder, we're recording today, so this uh can be watched back later. Um Adam's going to kick us off here, but I appreciate everybody coming out. I know it's hard to align schedules and appreciate all the department heads and other folks being here, as well as of course planning board. Um great. So, for planning board members who uh grabbed a spreadsheet the other night at the planning board meeting, just want to make sure everybody saw Vicki on your way and then got a different one. We found where one um project did not actually turn up in the one you were given the other night. So, everyone have the new one. >> Okay. Um so, Lynn is here and has the um the software live on the screen, which you probably can't see very closely. That's okay. um it's just a matter of her being able to make the changes in um the software in real time if we have any changes um and hopefully that will help um with efficiency. Um so we will go through each one of the four departments um and hear what they um have for highlights if there's new projects, if there's updated projects, if there's a particular project of interest. Um and then feel free to ask um relatively minor um questions that are department specific. Um but the idea being once we've gone through all of the department presentations then the um you can all sort of deliberate on if there's things that you want to move around year to year once you have a more holistic view of um of the plan. Um things that you might notice are slightly different from years past. We have um held a threshold of $50,000 um for what is capital um in discussion um [clears throat] with department heads, we decided that we're not going to pay super close attention to that threshold um because that can create a scenario where um for public works especially, some tractors are over $50,000 and some are under. And so you end up with this plan that shows half of the mowers that have to be replaced and half that um need to be replaced are not there. And so if we want department heads to and the community at large to be able to use this and have a better understanding, it makes sense to put like things with them regardless of the the monetary value. And there's some um police equipment and things that Emily will get into that also fall into that category. Um so that's a a difference that you might notice. Um other than that I think we should just let um folks get started. Um any procedural questions from anybody? One other thing I guess to mention too for um so it's technically a document of the planning board. So um when uh adoption actually happens, it's a public hearing at the planning board meeting. We typically shoot for the first meeting in October. Um so our goal will be if we can get the the actual projects pretty solidified today um in September we can um update the narrative that um from last year's session uh and then be ready for if we could hit our end of September meeting for public hearing that's fantastic but the ideal being um I think it's like October 11th is the or 13th is the target here and that's 10 days prior to the selectman's uh budget workshop. So that gives us time to turn that over to the selectman. Let them sort of marinate on it before they get into that. So any questions? All right. So uh we have the fire department up first. So um Mike, all yours. >> Well, good morning everyone. I'm new to this, so bear with me. So I'm not 100% sure with the format, but basically I'll go through my line items. But before I start, the first thing >> absolutely the first thing I would say is coming in as the chief, one of the items that was on the CIP was the expansion of the fire department tanker bay, which I looked at, [cough and clears throat] excuse me, did not see any reason to not or to do that. Um, based on, excuse [clears throat] me, the reason the expansion was there was because the former chief thought with the replacement of the new ladder truck, it would have to go into a bigger area. But we've looked at options to figure out that there are different things we could do to use the envelope of the building right now. one of them which was we just recently had a vendor from Quebec come down with um a ladder truck that they build up there that we demonstrated to the selectman to the town and to our members um that basically fits in the envelope of the building comes in at a substantial price tag a lot less than a full ladder truck does under a million dollars actually and um so we put it through everything we have some opposition to it because the mentality is that that the town needs a full-size ladder truck. So, we formed a truck committee to look at the all the aspects, not only purchasing this truck, replacing it with a full-size ladder truck down the road or refurbishing the current ladder truck. So, that's in the works right now. So, that's my savings right there is it's basically one and a half to $2 million not doing the building expansion um because there's definitely other options. So, excuse [clears throat] me. So, the first thing I'm looking to replace is the 2015 Dodge Durango that we've had for quite a while now that basically has 92,000 miles. Um, it's used as not only for inspections, but because we have drone operations now, we need to have a platform for that as well. So, we do have a couple of of licensed drone operators, and the drone gets used quite a bit, as well as by other officers around the town. So, it has 92,000 miles. Um, it's in rough shape transmissionwise and it has quite a bit of rust on the under body as well. All right, >> back in service. >> Any questions on that? Good. Okay. So, as you see, the 2032 is the replacement year for our current ladder truck as it stands. Um, the $1.9 million was put back in there. Just the worst case scenario that we do have to you go forward with the full-time replacement of this truck. So that's based on current pricing right now. And obviously it's going to go up by the time that rolls around. And then the third item I have on there is the replacement of our current utility truck, which is our first due piece for medical calls and and basic calls around town. That was just replaced in 2024, so it's not due till till 2034. >> Yes, sir. [clears throat] Um, in regard to the latter truck, the DES I apologize I haven't been part of the meetings leading up to this. Um, how will that decision be made and over what period of time will it be made? >> So, the board of firewards would like it made fairly quickly. We have actually we don't have a contract with this company because we wanted everyone to come and see it first to make their own conclusions on it. Um, we're still waiting for some things to be worked out on the legal side, but the board of firewards would like to see resolution to this within, I think, 6 months at the most. The build, this is a build on this truck, if they do ultimately go with this one. It's a two-year build, just like everything else. We would be the first department in the United States to have this. they only want to work with us because of a proximity to Quebec and they'd be able to do the maintenance on it. Um, you know, without having to find a vendor down here. The biggest thing is with this truck, and I think this is the opposition, it's on a Ford F600 chass chassis. It's a smaller truck, but it's more maneuverable. It's four-wheel drive. It can get to a lot of the houses where our ladder truck can't can't get to. So, it would be me, you know, it would be serviced by a Ford dealership here locally as far as the chassis is concerned. >> Yeah. And so if that timeline is correct, is the um placeholder of a million nine in the right year? Because that decision by the firewards would be made this year and then once the decision's made, then the contract, if it's a purchase, would be initiated. And that would put you into, wouldn't it be in 2031 you'd get the truck? 2032 was the year that was initially on the books for replacement of that of of our ladder truck right now, which is the 2012. So, it's on the 20-year cycle basically. >> Okay. >> Yep. >> All right. Thanks. >> Yeah. >> Did you have any other details you wanted to add? >> I think I've covered everything. Those are just the three line items. Our biggest tickets was just our SCBA was just purchased this year. So that's good for another 15 to 20 years. So we're all set there. >> Perfect. All right. Thank you, Chief. >> Thank you. Um >> questions from others. Yep. >> Okay. Next up, we'll hear from the library. Thank you. which the just so everyone is in the right spot, library is on page four about midway through. Um it's under cultural and recreation. >> Thanks. Y >> good morning everybody. I'm Richard Tottweiler. I'm the library director for the Tracy Memorial Library System. So good morning to you all. Bright and early ready to go. Uh so for RCIP this year, not too much has really changed since uh the last time I spoke with you all last year. Of course, we're a year ahead. Um and for 2028, we're our big project is interior renovation of the building. Uh so that'll encompass uh a lot. We'll be repainting the building, ripping up some very old and well past its prime flooring. Uh redoing some tiles, redoing the bathrooms and things like that. So, we're also probably going to entertain the possibility of retrofitting one of our supply areas in the basement of the library uh for the creation of an expanded teen space. Um although that's something we're probably going to go out on a capital campaign for in terms of funding. I know that this isn't a a funding mechanism meeting, but just so you all have a idea of the breadth of that project. Um, for years in the future, um, we do have, uh, new furnaces to be put in to replace two old cast iron boilers that are already at end of life. We've, you know, maintained them quite well, so we're pretty happy with the performance so far. Um but they are about 5 years past their you know expected and so it's just about time to get them done. Um past that in 2030 we have mechanical systems which would be the replacement of basically some of our air handling equipment uh mechanical equipment tied to the um the elevator that's just you know need of repair and beyond that um not as much uh building painting two years later again we just need to make sure that we're on top of building painting so that the um the framework of the building is protected year-over-year from the weather. Um, right now there's some, you know, wear, but I think we still can get quite a few years out of it before we need a full repainting of the building. And the garden shed in the back of the building that's used by the garden of the Tracy Memorial Library, but it is our perview to maintain it. Um, and the the top of the building, the roof in particular, uh, it is also a slate roof building just like the library proper, and it's starting to fall into disrepair. There's some mild leaks and what have you. It's a shed, so it's not a huge pressing need, but it is something we want to make sure that we're not letting just kind of fall off. And that's pretty much what I have for you all. Again, there's not a whole lot changed from last year when I presented in front of you all, but I'm happy to have any discussion about any of these projects. >> It's great. Thank you. Uh questions. >> Question. Um Richard, the paving of the front um area is being done this year. >> That's correct. >> Okay. And what maybe Sam can help us with this. What's the life of paving um generally if it's done properly? So, when would it need to be re redone again is I guess my my question. >> Uh, if the base is good underneath and it's used, you know, like like commercial like the library, I would think 15 years would probably be the life expectancy of it. That's my guess. But >> yeah. Okay. Thanks. >> And just an FYI for everybody, that project should be happening uh just after Labor Day. We'll begin with the curbs and then later in that month, we're going to be doing the full paving of the the space. I saw a question. >> This is a general question. Are the dollars cited here in present present dollars? Okay. Thank you. Okay. Uh other questions from folks. Uh the only other thing that I probably should have mentioned at the beginning is that um one of the limitations of the software is um how much you're able to see in descriptions. So um the planned replacements uh line is a good example of that where while the report that we can get from the software doesn't show you the description behind that. Um we actually if you were to go in and click on that $60,000 year um we can see what it is. So we're not necessarily losing track of of what that 60,000 is allocated for. It's just a limitation of the reporting system of the software. Yep. So Lynn's hovering over this. This is what Lynn and I see when we are in there. Um and so you can see when you hover over we get the descriptions. Um so just so everyone's aware they are there. It's just a reporting limitation. >> Yep. Good reminder. Thanks, Adam. So any other questions for the library? [clears throat] >> Okay. Thank you very much. Appreciate >> Thank you all. Yeah. All right. Next up, PD Chief Cop. So, this is the middle of page two. Okay. Thank you. Um I will start with the cruisers. Um those are the items that I'll cover today. This is the first year that in in working with that and we really decided to delineate the cruisers in the CIP so that it wasn't just kind of one big bucket of just cruisers. So just as a reminder for folks, we have four marked cruisers, one uh and two unmarked, one of which is mine and the other is the detective car. So you can see it says chief cruiser, detective cruiser, and then patrol cruisers. So there's four in that um patrol cruisers line item. So the $85,000 that we put in for CI for um planning purposes is typically what it has cost us over the past few years um for patrol cars. So the cost to replace um either the detective vehicle or the chief vehicle might be a little bit more or less because we don't need some of the equipment in the cruiser like um a partition in the back to hold prisoners. So, that number might fluctuate a little bit, but I think the 85,000 is a safe number to put in there. And as you can see, the um it's due out for the next six years. Um and every year we evaluate the health of the fleet and what we have put into the each cruiser for vehicle maintenance and just kind of what the vehicles are are saying to us at the time, if you will. So certainly it might fluctuate if we decide to push out one of the lesser used vehicles, but generally I think this would be the plan going forward. Any questions on cruisers? >> Chief, thank you. Um are these sourced in the United States or? >> Uh yes, we usually um go through the state bid process so we get the cheapest price we can for cruisers. Um, so yes, that's we try to stay I don't think they're made all in the United States, but uh we do try to go with the state bid and we work with one company for the upfit uh of those vehicles and another company who's local that does the uh painting of and the um striping on the side of everything. So >> Emily, just as a reminder, what's what's I'm I didn't mean to No, that's okay. Cruiser related. What's the general replacement schedule that you work with in terms of mileage or wear or to? >> We typically run them for about six years, give or take. The patrol vehicles anyway and sometime somewhere between four and six years for the patrol vehicles typically because they're not used as much and as hard every day, the unmarked cars can go longer. So, for example, the detective cruiser that's supposed to be replaced in 2029, that's a 2019. So, we will have had that vehicle for 10 years. Um, and so that's just a good example, a good example of that. Another um item to point out is that in FY27, which we're in right now, I had not budgeted for a cruiser. And I feel like it was no sooner that I made that decision that the cruiser started breaking down. And we've had some real issues with one of the our last charger actually. So, um I think I mentioned it at a select board meeting. You might see my cruiser in town with uh patrolman in it doing work because we were down cruisers. Uh we had one that was in an accident and then one that was down and is giving us a lot of problems. So, um, in an effort to, uh, skip a year with a cruiser, I think honestly that just kind of bit me, um, quite frankly, and in an effort to keep cost down. I know cruises are expensive. Um, I skipped this year of FY27, but I do think ultimately that will be detrimental. >> Um, Chief, the $85,000, does that include all the technology and everything else that should go in one of the >> Yes. Yes. That's the purchase purchase price for the cruiser itself and all of the upfitting. Okay. >> All the technology and and those cars are about as full as as an office is. I mean, there's a computer in there. There's body cameras. There's radars or dash cameras. There's radars in it. There's there's a lot of equipment in those cruisers. So, yes, that is inclusive of all of the technology and the cruiser price itself. >> Okay. Thank you. Thanks Shar. Thanks Chief. Other questions. >> Um then I'll move on to police equipment. Again, like Adam had mentioned, this was the first year that we had put police equipment into the CIP, which I think ultimately is a good idea because it highlights the the cost to maintain some of our equipment. So, for this police equipment, this is really encompassing our tasers and our body cameras and dashboard cameras. In 2023, we um got the body cameras and the dash cameras as part of a grant. And so, it was um just over $100,000 to outfit all of our police officers, all of our cruisers. And so, the grant had paid for about half of that. So this year um in 2028, March of 2028 is when we will be due to replace those. And so that's cost is into this first year of 2028 as well as our tasers. Um and with those we go on a yearly cycle with those. And so the reason that the number in 2028 is more than in subsequent years that is that there are some upfront costs when you start a new plan essentially with both tasers and or body cameras. So that's why that that number is a little bit more. But going forward I know what the cost will be for those larger police equipment related items um going forward. Chief, >> what's what's the status of VO? How how are we still have a dog or >> Yes. Yep. VO is still on the road. Um he is going to be 11 this year. Um so he is getting up there in age a little bit. Um so you know he's he does take some I think it's like arthritis medication and [laughter] things to try to keep it. He is he he is still being used. Um I would say that he is not as active as he was at one point just due to the nature of the calls that we do or do not receive. >> Um many years ago when he was kind of in his prime if you will. Um there were other opportunities that departments would call on us or that we would use VO for. um like in the state of New Hampshire, he would get called on to help with search warrants or other things with the New Hampshire Drug Task Force um which was a a task force through the AG's office and that that entity went away and it's transitioned into something different now. So, we just don't get as many calls to use the dog for those reasons. So, some of those things have changed. Also, other departments um in our area have also started K-9 programs. Um so he he isn't used as much as he has been in the past, I would say, but he is still active. >> Are you planning on um getting another dog if something happens to VO? >> I don't know that that is a direction that we're going to go at this point. Um, I would have to say that when we do decide to retire VO, it would be a conversation that we would have internally at the police department. And it is it is such a huge commitment for the handler >> to commit to for years and years. Um, that I think that the the current handler might be looking to do some different things um in his career. And I don't know that we have anyone else lined up ready to take on that type of a commitment going forward. So, um, I would say that the K9 program has been overall a benefit to the town of New London certainly over the years. Um, but I'm just not sure that the the need is going to be there going forward to justify that cost. >> Who is the officer that is hand >> Jeff Dailyy? >> Oh, yeah. >> Excuse Corporal Daily. >> Thank you. >> Thanks, Shannon. Thanks, Chief. Um [clears throat] and then next for me to discuss is going to be dispatch uh replacing the dispatch consoles. And those consoles were purchased and implemented in 2015. And when I say dispatch console, it's the it's all of the equipment that the dispatcher has in front of them, the radio screen, and basically our whole communication system um of of how we do those how they dispatch every day. So those were brand new, state-of-the-art in 2015. So they are definitely due to replace. Um we had scheduled to replace them in FY27. Um, but I was asked to inquire if we could put it off one more year, which I did. And the the answer was yes, you can, but they would not recommend putting it off any longer at this point, replacing those consoles. Um, so they can keep updating the software, firmware, etc., but it they are truly due for replacement. So that would be the the cost of replacing the the dispatch consoles, of which there are two in our dispatch center. >> Yeah. Marian, go ahead. The dispatch uh function services a number of towns. Is that correct? >> Yes, we're a regional dispatch center. So we service uh New London, Newberry, Sunip, Sutton, and Wilmont and New London Ambulance Service. >> Do the towns um contribute to the replacement of the console uh equipment? >> Yes. So over the years they have contributed to the capital reserve fund that we have established for communications equipment and I believe there's about $250ish,000. The one thing Lynn doesn't have up on her desk there, but [clears throat] there there is uh some money in the capital reserve account for that purpose. And that capital reserve account was established back when this was done in 2014 2015 because um I wasn't here at the time, but the the police department had a um had a technology issue and some things crashed and went wrong. So they got the new consoles. Um they had done the two dispatch studies, determined that yes, this is a service that the town would like to keep and maintain. And so the town made those capital investments into the dispatch center which included starting that capital reserve fund. And so over the years there's been contributions to that. Typically it was $34,000 over the years. One year it was um cut in half to 17,000 and then a couple of years there wasn't anything put in there. But I think that there's Oh, Lynn might have an answer for >> I do after my after the contribution for this year 2027 it'll be 301. >> 301. Okay, great. Thank you. Um, so in answer to your question, a longer roundabout way, Marian, thank you for it, is yes, the towns do contribute to that. Thank you. >> Thanks. >> Um, and I think that's it for my presentation. Um, as far as the, um, police facility and land acquisition, I think that is going to be someone else. You want me to say something? Thanks, Chief. >> So, you will see in the CIP that we've shifted the police station project funding from one year to another. So, we've shifted it. We've shifted that uh $2.5 million placeholder for land acquisition. Closing planning and design is being moved from FY28 to FY29 along with a $9.5 million placeholder for construction of a new police facility from 2029 to 2030. The board of selectmen don't have anything new to report at this time, but they believe that it makes the most sense to maintain these placeholders in the CIP for planning purposes and provide flexibility should a project develop. So those are really just placeholders and we're just shifting them out a year. >> A general question to us. Yeah, >> I apolog um Maryanne asked earlier whether these dollars are present dollars. We've had discussions in prior years is whether or not we should think about inflation um in our number projections, particularly these that are longer bigger numbers. And um based on timeline I didn't I didn't know what the sense of the committee is at at this point on doing that in the CIP. I'm a proponent of putting inflation in unless we have selected a range of cost um that allows for a low and a high assuming you're going to land in the middle. But I I don't have a full appreciation for the assumptions utilized to drive the actual number present and I'm not singularing out the police facility by any stretch. I think any of the numbers would we might consider uh thinking about inflation because it's a real it's a real cost that will will bear and I don't see prices going down I guess is the other component. So I don't know where everybody else is on that and Adam if you have any thoughts. >> Yeah, I think when we've had this debate in years past the I think the most challenging part has been that there's not an easy standard across all of the different components of the um CIP. So asphalt for example um changes much more dramatically than um some other components. And so the the general consensus has always been that picking it in an even number of that year, knowing that you're updating it every year. Um, and as you get closer, those numbers get closer to accurate is the sort of best standardization. Um, I'm not sure. I guess I would look to department heads a little bit also to give some insight into their >> I would if if we don't apply it um across the board you we could select percentage that's reasonable over historically and what we think is reasonable going forward. Maybe on the larger projects we ought to do that but the smaller may not warrant it. And I think that Charlie, one thing that could be done, and we'd have to probably do this outside of Questica, unless there's a custom report thing that we could come up with, but is maybe like a bottom line. Um, I mean, obviously all of these get totaled out, but um, maybe you could say, you know, these are the the six departments or whatever that are in here. These are the bottom lines for each fiscal year adjusted by 3%, 4%, 5%, whatever you say. sort of a separate table that can be a resource, but it doesn't actually change the project. Okay, Lynn and I can look at if there's a way to do a report like that. If there's not, we can that's fairly small. We can export to Excel and do something. Um, and maybe that lives as part of the narrative or we'll figure something out to display it. >> Adam, I would and I would like to I I volunteer to actually sit down and work on that for a morning with you. I'd love to do that. got a bunch of smaller things like that that I think would be helpful to all of the committees, planning board, budget, selectman that might be nice ways of kind of getting at long range costs and and kind of understanding them a little bit more. >> All in the realm of presentation. Uh, thank you, Chief. I know you you pushed that over, but I have a question relative to that. I think that is more in your and that is, uh, given that we're maintaining where we are, is there a number that doesn't show up on here that you're investing or feel the need to invest in where we are to maintain >> your function? on a yearly basis. I um >> one thing that we added in the last year was we updated the security system, all of the cameras and all of those uh the door keypads next to every single door that you see. And we were forced into that situation because there was a a small fire in the panels of our old door keypads um because the equipment was so old. So we were really forced into that situation. So that would have been something that I would say that we should look at if we're going to be there for the long term, but we were forced into that situation anyway, which ultimately I do think was beneficial because we encompassed the town office um in some of those security measures that we updated and improved upon. As for other things, um right now we're having a problem with the Sallyport roof and it's it's got some leaks and some things which um Department of Public Works is already addressing. So I guess I don't know of any other numbers or big ticket things that I can think of right now aside from what we've already had to do because we were forced into it or that aren't already being addressed. Paul, if I can jump in on that a little bit too, just as facilities, um, we do still keep up with the like planning and maintenance of the building as far as exterior and interior shell. So, uh, Chief touched on the Sallyport roof. Um, it's not necessarily leaking. I don't want someone to think that there's just water pouring into the Sally Port. >> That's fair. Thanks for that clarification. You're right. >> Um, but it's getting close to the end of life. Um, we have that in the plan. You'll see that when I go through my presentation as well, along with the roof. Um the restoration work that UCB done to Buer or to Whipple right now also extends partially over into Buer. So we are protecting the building still. We're not just letting it, you know, fall to the wayside and not maintaining it. Um we do have things within our budgets of our facilities that continue to maintain the interior like flooring and um sheetrock work and all those types of things along with, you know, we keep the fire panels up to date and sprinklers inspected and all that. So it's not that we're just neglecting the building. >> Oh yeah. I wasn't I wasn't implying that, but I was saying functionally, [snorts] >> you know, with all the dis discussions that have been had and things like that, are there hidden expenses that you would anticipate having to >> modify the building or equipment or whatever? >> No, not at this point. It really would have been just the security system and the the keypads, but we've done that. >> Maryanne, you had a question. I've got a a couple of questions. Um, first of all, Chief, does the population I'm woefully um ignorant on this. The population in New London increase substantially um in projections and do you have sufficient staff to address that if that's the case? And you know, that would certainly imply that you would need additional capital investment in to support that. Yes, I think we're adequately staffed currently as we are, but if the population were to increase uh dramatically, then that would definitely be a conversation that we should have. >> Okay. And Maryann from the state demographer does do population projections by community. Um we are not projected to see a substantial increase in population. If you look at our historic trends over the last 30 years, it's been fairly minor. Um and certainly we don't have a whole lot of new housing for those folks. So >> one could hope for additional housing um availability, workforce housing and things like that, but certainly wouldn't move the needle that much. I guess I have another um comment if I could. Um Charles, um the discussion about how to factor in inflation, I think, is a very substantive one. And um the impression I've got from what I've heard so far is that the rates of inflation would really be um tied to the materials that would be in what that would be being invested in. Excuse me. And um it would get a little confusing I guess unless we kept really good notes about what the what the assumptions are behind each of the numbers. Otherwise, you know, we could do a straightforward, you know, up 5% or whatever the historical or projected inflation rates are. Um, I understand the issue because g whiz 9 million5 could be 12 million by the time we get there depending on what happens. And I I think you raised a very good issue. I'm not sure that we can solve it today, but I would welcome the opportunity to discuss it further. If I may, I think we face that not only in this document, in this planning document, but in our just every year annual budgeting. I mean, the money that we're trying to project now or trying to plan for now is what we're going to be spending potentially almost two years from now or just shy of two years. So, it is a really difficult thing to, you know, to try to crystal ball at some point of, well, I think this is what this might cost, but um it's a really hard thing. And so when when I'm building my budget anyway, I do try to account for that not knowing if it's going to be a 3% 4% 5% increase for whatever goods I'm trying to provide um for the police department. So it is a tough thing. And then additionally um you were talking about putting in a a flat across the fee price. Some of the things in the police um lines anyway might be subject to that, but others would not be like the police equipment. Those are costs that I know going forward when we enter into those agreements like for our tasers and body cameras. Those are set fees going forward. So, it wouldn't be an all or nothing, but it kind of comes out in the wash if if that's an all allin and something is more than what you expect it. Um, it might kind of even out that way, but it is a tough thing to try to navigate, not only in this document, but in our operating budgets. >> Thanks, Chief. Okay. Yeah. The only other thing I would add to that for not to put something on Charlie and John, but it could also be that there's a sort of budget committee process that happens between when CIP is adopted and when you are getting into the work of figuring out what transfers of capital reserves and stuff are where there's sort of a a subset group that kind of takes this document and manipulates it to to better help members that you know that it might not happen wholly within this process, but doesn't mean that it's not part of the larger process. >> Not trying to refute that, but um this is I mean this is a nuanced conversation and a difficult one. I mean their entire industries, banking, investment setup to actually calculating this figure. It's how they make their money. So this is something that is not really that easy to do. I mean, I think from a business standpoint, which essentially is what we're talking about here, we need to make some sort of estimate that is reasonable and then more or less stick with it and and re readress it every year. I mean, I don't know how. So, so in in my own world, I do around $600,000 worth of capex every year. Every five or six years, we may do a couple of million dollars worth of capex. um on the buildings at at camp. I have no idea how the tariffs are going to affect that because that's lumber prices. I have no idea how unemployment's going to imp impact that because that's uh labor prices. I mean, that's where that's where your major cost centers are going to come when you're doing construction, that and steel in this particular case. And um so you have no idea what steel is going to do. Also because of of various policies and pick a figure, make sure you're comfortable with it, address it every year, and move on. We'll sit here in the weeds for years trying to figure that out and not get any farther than Goldman Sachs has and not make nearly as much money. >> Thanks, John. Uh, okay. Yeah. Any other questions? Yeah. Right. Good context. >> Emily, are anything else you want to add on yours before we move on? Okay. All right. >> Thank you very much. >> Sam, uh, you are up. Um, for everybody else, um, Sam starts first on page one, and I imagine he's going to go page by page because his is filtered out between here and the end of the document. So, >> all right. Good morning everyone. Glad uh you got the quick ones out of the way. We should only be here for four to six hours on this. So it'll it'll go really fast. Trust me. >> Our day is yours. [laughter] >> Excellent. You're going to need it. All right. So we're going to start like Adam said on page one, uh general government buildings. Um I'll try to be as brief as I can just because we do have a bit of information to get through. Happy to go through kind of a block of it and then stop and take questions then we can go on to the next category. Um, the first like five to six that you see, fire station furnace, Elkins Dam spillway, fire generator, town office generator, town office carpet, town office furnace, and town office roof will stop at town office roof. The ones all above that um have been existing within this plan for quite a while now. So, there shouldn't be anything new there. And I think there is essentially no changes to cost there. Um, moving down, the town office roof was prior approved like five or six years ago um at a town meeting, but we just felt it was appropriate to read it since it's kind of been long enough that we want to make sure that it's falling within here and then um it's recognized. So once we get into town facility paving, this is a new line this year. Um it does two things. I think Charlie will be happy to hear about some of this even though I know he loves paving. [laughter] um we broke out facilities out of my operating budget. So in this current state um we handled facility paving usually within the operating budget. The problem is that really took away from what we could do on town roads and with a very small paving line that we have. It's difficult to complete a sufficient amount of roadway paving to keep up with our paving index which is quickly falling behind. So we chose to break this out but it also just is better document planning for all of you to see. Um and so we can go through which each one of those numbers represents. The first in 2028 um for $20,000 is Whipple and Buer. That's this location here. Uh the next is 2029 at 40,000 for the transfer station. We have a short break and then go to 2031. That's the municipal lot. Um that's a relatively high number for a simple paving lot, but we're hoping to handle multiple storm water infrastructure improvements there and a small parking lot expansion just to improve the um municipal lot in general. 2032 we go to town office at 25,000. 2033 is the sewer pump stations. We have five pump stations and that would handle all of those. uh 2035 20,000 for cemeteries that is West Park, Old Main Street and Elkins. And then lastly is 2036 for Buckland. Um the fire station and the Elkins um beach is not included because the fire station is being paved this year and the Elkins beach you'll hear about in just a minute. So um just for the planning board members perspective, this is one where we have changed the style of how we're presenting it um pretty dramatically where each one of these used to fall in as an individual [clears throat] item. Um so looking for feedback I guess from folks when we get there as to whether or not this is preferable for um for planning purposes. It helps to illustrate the cadence of um paving that it never really goes away that every year instead of having these random projects that are just kind of hidden among Sam's five pages of um of items. So, um just keep that in mind if you have feedback on how that gets presented. >> All right, any questions up until this point or halfway through facilities? Yeah, good. All right. Uh Elkins Dam maintenance that uh remains unchanged along Yeah. 150,000 in 2033. The next is Ilen's uh gazebo replacement. So through assessment of that structure in the last two years, um it's kind of been determined that it's a light construction gazebo that needs a decent amount of repairs. Along with that, if we do too many repairs, it would get us above the threshold of an ADA compliance upgrade. And to do that, it would require us to add a like very extensive ramp onto a structure that probably couldn't handle that ramp. Um, so Adam and I did some planning and just kind of looking into what gazeos cost and if we could do a ground level or close to ground level mounted gazebo upgrade. Um, and based on the structure that's there, the condition that it's in and such, we felt that um, replacement is probably the most financially responsible option to go with. And you'll see that in 2032 for $40,000. Um, Elkins Beach Leechfield is a new item, 2031. It's $40,000. Um, the current condition and exact location of that leechfield is unknown. And with the town having our own um sewer pumping regulations, we decided that that was uh something we wanted to work on. So, we are working with a um surveyor and septic designer now to start working on plans for that. um it is in operational condition that is not abnormal to have um leech fields and septic systems that aren't exactly known. We do know where the tank is and it is pumped regularly and we don't there's no issues at this time but we want to make sure we're staying ahead of that. So that's why you see that that most likely is a leech field that's under the parking lot now. So when it was replaced we would also be doing a parking lot you know repave and such. So that's why you didn't see the Elkins Beach land within um the paving plan above. So, Sallyport roof. Um, as chief touched on that already, that is something that we're planning for. Um, it we couldn't do this any sooner even if we wanted to just because all the contractors are not taking on flat work roof for pretty much the rest of the year. Um, so it will be a summer of 2027 plan regardless. So, that's why we put it within the CIP. This $50,000 represents like a worst case scenario or we're hoping worst case scenario. um there's a chance that we may be able to just reskin the roof and remove the ballast, which is the stone on top of it, and just put a new roof on it. Um the 50,000 represents if we need to there's a layer of insulation on top of that roof. If that insulation has absorbed water, we may have to replace that as well. So, uh Elkins post office repairs, one of my favorites, is still on here at 135. I believe we increased that number about $15,000 just based on the condition of the building. Um, that'll be a fun one for the selectman to debate when we get there. So, uh, next one. >> Does the federal government contribute anything to the maintenance? >> No, they pay rent to the town. Um, and then they obviously make adjustments interior to like P.O. boxes and just general operational things, but they contribute nothing to the repairs or the like. >> So, we're the landlord for them. >> You got it. Yep. >> All right. Um the next one is a big ticket one, which is the public works complex at um South Pleasant Street. This number is to the conversation that we've been having a projected number with inflation included. Um this was given us to us by the architects. Um, and this would be a completion of 2028 if it was approved at um, town meeting this year. So, it's a $10 million number. Um, that's in the area that they're hoping to land and we're hoping it's going to stay close to that. >> Questions? >> Yep. Please. >> Yeah, David, go ahead. for for that um complex um when you have down there 10 million. Does that includes anything for for land in the future for maybe a police department or or or is that just for your your complex for your your operation? So, we did go down the um exit ramp of looking into seeing if we could fit a police department on the DPW complex site, and it was determined that while a structure could go there of size that the police department needs, it wouldn't be functionally efficient for us to do that. Um so, we've chosen to abandon that option of potentially putting police at public works. Um so that it gives public works the ability in the next 50 to 100 years to expand to other areas of its lot. So unfortunately it wouldn't work out there but we did explore those options pretty intensely. So >> thanks David Paul you have a question. >> Thank you Sam. Um just my lack of knowledge is the 10 million to replace what had to be taken down or is there more involved? >> Yeah, so the 10 million represents Great question Paul and I should have touched on it more so thank you. Um, it represents replacing what was lost with modern-day, you know, equipment and size and things like that. So, the shop that was torn down was obviously six bays, but they were very small bays, so most of our equipment didn't fit within them. Um, these will be to today's standards of bay sizes and such so that all equipment can universally move freely through it. This also includes um space for the employees, you know, a break room, locker rooms, things like that. uh no bunk rooms but also office staff area training space and those types of things along with a renovation to the existing building the 2004 building that was completed in 2005. Um that building needs you know new siding, interior renovations and things like that. It addresses all that along with um storm water management of the site. That's one of our biggest concerns and areas that we want to improve upon and potentially a new um sand salt shed and such. So it does address basically the entire complex as a whole is represented in that 10 million. It's not just to build a structure of 10 million. It's the entire complex will be redesigned, reimagined and improved. So yeah, thank you. Any other questions on that one? No. All right. Whipple exterior repairs. I left this one in here at 120,000 in 2034. As you know, right now we are undergoing um repairs to the exterior of this building right now with the lol front. you can see that um we thought that the best thing to do would be you know every eight years kind of do a look at the exterior of the building and see what we need to do as our next options and things like that. Um through talking with the current contractor that we have now he's recommended that we potentially do a um service plan where for the next 10 years we would lock into a number. He hasn't determined that number based on the condition of the building yet. He'll give us that once he's done um which is basically a warranty on the building. So after the work is completed that he's doing now, he says that if we agreed to this contract, which might be, you know, 8 to10,000 a year, it would basically guarantee any work that needs to be done would be covered within that money. Um, which has worked out well for other towns. He gave us references. I've called a couple of them. Wilton was one of them, and they pay the $10,000 a year. They just had an $80,000 job due to snow damage have to be done, and it was all covered under that $10,000. So, it might be a great option for us, but I haven't fleshed all that out yet. So, we're still working on it. And so, since I don't have those hard numbers yet, I've left it in there at 2034. Uh, the last one you see, which is still remaining from prior, is the wastewater main plant renovation. Um, that's just upgrade roofing, siding. That's a brick building um with some pretty old cedar clapboards and such that need to be replaced. So, and that completes general government buildings. >> Yeah. David, another question. under your Whipple Hall. >> Mhm. >> For the interior here, >> have we completed all the renovations to this for the interior of this building? >> Almost. We're 98%. I'm looking at Janet. We have a few small areas that we want to touch up. The electioneer um closet or corner over there needs some work done to it. And then the stairway going down to the police department first floor. Other than that, yeah. All after the exterior, we're 99% done with the structure. >> So if there's work to be done, it's not listed in here. This is the general work that you will do. >> Correct. Within my operating budget, we will handle the maintenance of this portion of the building moving forward. Correct. Yep. >> Yeah. Thank you. Good question. >> One quick Sam, how talk a little bit about um dams. Is there a line of demarcation between the dam bureau with the state that has responsibility for some component of the dams versus what the town incurs? Where's where does that fit? Do they own any of the 150,000 dam repair, I guess, is what I'm asking. Little Suny, Lake Suny has a similar >> but less. That's a I believe a state controlled dam to begin with. Like the state owns that dam. So all the dams in town that you see listed within here are town controlled and in typical state fashion. They govern what we do to it um and tell us when we do it. So talking with when they do the inspections with the inspectors, they've kind of recommended some options moving forward as to what we could do just based on maintenance. So we have nothing that is of major concern in any of these areas, but maintenance on dams is relatively complex. This only represents the Elkins Dam, which controls the level of um Pleasant Lake as you all know, but it does require us to do a decent amount of um renovations and just repairs. You'll also see that we have the spillway and then the dam listed. Maybe that was partially what you were kind of commenting on as well, Charlie, is that the spillway is separate from the dam. So, the spillway would hopefully prevent the dam from ever having a catastrophic breach in a, you know, 500year flood or anything like that. It relieves the pressure of the lake, but that does still again require maintenance. It's a concrete structure that was installed in the 40s or 50s and then the dam is, you know, what it was originally installed to make Pleasant Lake what you see today. Um, so to more directly quickly answer your question, they tell us what will need to be done and it's usually only on a one-year notice unless you can catch the inspector and ask them to tell you, you know, what do you project us needing to do? At this current time, again, it's just basic maintenance of crack fill, um mortar repair, some um armoring done to the banks and the sides of the dam so that like as the outlet comes out, it doesn't continue to erode the banks, things like that. [clears throat] But nothing of extreme measures. So, >> okay. Thank you. >> Yeah. Very good. >> Um thanks for the explanations of your varying numbers, I should say. I have a question, a sort of a general question and it relates also to the fire department. Um, somewhere the lint in the velcro of my mind has uh filed away the idea that or the concept that the fire department structure would have to change in order to accommodate this new gigunda thing. Is that still the case? And who under whose budget would that appear? No, that's incorrect. So, we've scrapped the idea of the building expansion and this truck would fit in the current envelope of the building, which means we don't need the building expansion. >> Okay? >> And it would fall under the category that you're seeing now of the um general government buildings, it would fall under there. If there was to be larger projects to be done there, most of the work that's going to be done at the fire station in the next, you know, 5 to 10 years is going to be covered within the general budget, not within capital. So, >> yeah. Thank you. Yeah, David, >> ju just going back to um the the um the money for land in in a couple of years. Um 2.2. Do we know what type of land and where that land is that we're looking at right now? >> Are you talking for the police station? I assume 2.2. >> I'm sorry. Are you talking about the police station? >> I'm talking under the under the um police department. >> Yeah, the 2.25, right, David? >> Land acquisition, closing, and planning. >> I'll leave that to a select minority. >> But do you do you have an idea what land that you're looking at? >> Yeah, Janet's gonna talk to that >> David over here. >> Thank you. Um [laughter] there there are several areas in this town that we are looking at as a possibility for a new police station. However, none of them um have moved forward. We're we're still pursuing it and as soon as we know um we'll let you know, but at this point we don't. >> Thanks, David. Thanks, Janet. Um, while we're still on page one, um, give Sam a minute to catch his breath. And if you're okay covering the energy committee while we're right here instead of going back, um, at the bottom, the energy committee's, um, $750,000 um, buyout of the solar is um, unchanged from previous years. Um, and Tim, if you have anything else to add, but I told Jamie we could cover it. Um, so >> did you want to talk about it, BB? Or who who did you ask to talk about? >> I didn't know if the energy committee you guys had. >> Sorry, I was confused. >> I told Jamie we weren't changing it and so he didn't need to be here. >> Yeah. No, it's fine. I I [clears throat] don't think there's any change there. I think that was same uh with all these things. It's kind of an estimate of what we think it would cost to buy out that array that's at the uh >> on one of Sam's buildings then across the street. Yeah, I was I asked Sam a question uh about whether this document contained all of our buildings all inclusive and he said oh no there's you know 32 structures overall and and so one of the things that I would like to point us to especially as it as it inter as as planning intersects with budgeting I think it I I in in the future, not today. Let's not get bogged down in this. I think it would be good to include those even even if we're saying none or even if we're carrying many of the repairs to those in the general budget, it would be it would be nice for us to actually plot out and we're going to I'm going to hit this up in a couple of different ways. plot out all of our capital all of our capital expenditures and sort of set up a regular funding mechanism for them. This is how I see it in my own head. So that we have we have regular M capital capex expenses going out and then more AB one-time or special capex expenses going out so that it's an easier way for everyone the citizens the committees the the staff uh everyone to sort of like think about it and and prioritize it and put it in different buckets. So that was more of a statement, less of a question. Just wanted to kind of put a marker on the table for that. >> Yeah. John, I think the other thing that um we think about is the the building asset management report that was done on those 32 buildings, we kind of use as a planning document and a north star. And so sometimes that will have it represents numbers that may be accurate or not, but we use those numbers to still give us a like it's a you know it's a light bulb turning on so that we can say all right let's look into that and see what we need to do. Um and so that just becomes a planning document for us and that's why some so much of those 32 buildings don't end up in the CIP is because they're less than that amount or they're unnecessary or we've you know we've decided to pause on them until we decide what exactly is going on with the building. So, yep. >> And that's where I I think mostly of what you have exists. That document is overwhelming for general consumption. I don't what is it like 90 pages of like spreadsheets this big. Um, and so it definitely exists. We can send you the link. >> Yeah, it is a public document that's available for anybody. We do have copies at the town office, too. So, if anyone's really curious and wants to melt their brain, it's there. >> I have a a question. Um Tim, this is probably yours. Um in regard to solar, do don't we have additional expenditure for the two new fields that we're planning? >> Yeah, I I actually missed our last meeting, so I'm not sure what the latest is on that. Um or the last meeting actually where that was discussed rather. Uh there is additional money, but I don't know off the top of my head what it is, >> but my understanding was that that's within this fiscal year, >> I believe. Yeah, I Maybe that's incorrect. >> I think that's incorrect because I think >> there there was an approval in the operating budget um and I think on the capital reserve help me with this actual numbers of an amount that would in aggregate allow for the deposits to be made on the two new fields. But the total acquisition price is the delta between that deposit rate and the purchase price of the fields. And I think I don't know what that number is now. I I had understood that the original projections were different because of the vendor or vendors involved vendors involved um and some changing in their original pricing. So I I think we might need to look at something in the 2829 year if those installations and those projects are moving forward. >> So Tim, can we charge you with Yeah, I can follow up with Jamie. I honestly haven't kept up with with the latestes on that because he's been kind of running point on that, but I can >> Yes. >> follow that. >> I I think the total number I remember was a million. So if you took the if we took the capital reserve amount off of that million, it probably leaves us with about 700,000 is just quick quick numbers. >> Yep. I can follow up on that memory. I believe so, but I'm not 100%. >> Yeah, sorry. I was I was not thinking energy this morning, so I didn't look at those numbers. So, but I can follow up. >> All right. Um I just have a small blip on page two at the very top of the page which is transfer station. Um the first item is the refuge tractor or trash tractor. Refuse is just the fancy word for trash. Uh that's what hauls your trash from the New London um transfer station to Meredith and then from Meredith it gets transferred to the landfill. Um that will be the purchase of a new tractor. And then the next item is the transfer station cottage which is 65,000 in 2031. Uh that remains the same. That's just kind of a brief and quick uh remodel of the cottage or just upkeep of it. So I think something that's kind of >> Sam one question is that still mostly storage? >> Yep, mostly storage. It's also where the facilities are and a small break room that's in there that the guys use as well. It's one of the best and only heated spaces at the transfer station too. So in the winter time that's where they go and then obviously there's AC in the summer. So >> yeah. Perfect. Okay. I just wanted to know >> Sam I'm sorry Maryanne go ahead please. >> Somewhere again in the velcro of my mind um I recall that there was an effort sort of an exploratory effort to change the location of the transfer station. Does that have any impact on any of the numbers going forward? Uh, at this current time, I don't think in a 10-year plan there's any plan to change the transfer station location and such. I know that it was done in the 90s. They researched it and then most recently 2007, I believe, or 2009. Um, but I think ultimately decided at this time that the best thing to do is just leave it where it is. Personally, if in a perfect world, I think that the next time the transfer station is changed, that would be where hopefully communities would band together and do a tri- town transfer station or something like that to reduce capital cost of all towns, reduced employee cost, but also improve your ability um to get better rates at landfills. You'd improve your recycling power. Um and I think it just be improvement to this area in general. So, I hope that when that time comes, that would be something that towns would look to do. >> Yep. Um, and John, if you do jump into the buildings report, the transfer station cottage line in here is a good one to just sort of use as a display for where some of the limitations of the full building report are. I think if you look at the number in that report, it shows something in the >> 3500,000. Yeah. >> And so that is a number that the engineers say is a total replacement of the transfer station cottage. This is sort of the practical application of what needs to be done to maintain the service of life of that knowing we don't need a brand new. Yep. So, it's a good spot to sort of look at both ends. >> Yeah. Two other quick points about the transfer station. Uh, one, we do have like the trash trailers end up getting moved into the um like highway and streets. I think that is just basically a Questica issue that it jumped over to there. Um, so I'll touch on that when I get there. But another thing is uh the town of London's fortunate that we have such a robust uh recycling program that makes us quite a bit of revenue. And so we've actually kept some items out of CIP and the operating budget just due to the fact that we're able to use our recycling fund um to either do maintenance on the recycling buildings. It can only be used on things that involve recycling, but that's pretty much everything at the transfer station except the compactor building. Uh so this year or 2026's budget at the end before it was the account was swept we were able to purchase a $10,000 shed for the stump dump. And so in the buildings and facilities report that was represented as a $50,000 shed replacement for the swap shop and area for the employees and we were able to handle it 100% with recycling money but also outside of the operating budget in general. So I think that's just a pretty cool point that the town should be very proud of and that's being everyone in this room. So >> and for far less than $50,000 >> and far less than $50,000. Yeah, that's a good point as well. >> I'd like to make a Go ahead, David. No, please. >> Go ahead, David. >> Sam, I have just one other question about the dispatch and and the fire and the police department. >> When is that area going to be handicap accessessible? >> The police department current >> to get into the police division and the dispatch, you've got to go downstairs. It's not handicap accessessible. >> It It is actually, David. If you come down the um like the entrance that the police use, there's handicap spots at the end where the chief parks and then there's a paved ramp that meets ADA to get into the police department. >> And the public knows this. >> I I I would believe so. >> Yeah. I don't Chief can probably touch on it better. I don't spend a lot of time in the police department. I'm thankful of that. But um [laughter] >> yeah, >> I'm I don't think they've >> you come in a different entrance when you come down. [laughter] >> Uh yes, I I think the public >> the Sallyport is also ADA. >> Yeah, >> I think the public is aware of it. Um and matter of fact, we we had an employee um who required the handicap accessibility a few years ago. Um so I think folks are aware that it's there. >> My question I'm sorry, Tim, did you want to >> No, thanks Charlie. Go ahead. >> Long range planning. Um the the topic of recycling waste statewide is big. It's a problem. Um it's a challenge and our environment needs better solutions. If we're looking at a 10-year plan and Sam's would recommendation or hope of may maybe thinking about a regional uh transfer station recycling operation um on face makes a whole lot of sense but there's intricacies ownership etc and operation that come into play if not by some number but by certainly notation in the narrative. I think this is an area that the town really should be planning for in our future. And in [clears throat] the event that we went to a regional facility, state-of-the-art of recycling of whatever we can and optimizing the economies of scale, there's going to be a significant capital number associated with that. And if it's multiple towns, you divide the pi, but the pi has a value. If we don't do that, then the status quo of maintaining a transfer station at its current um configuration and operating capabilities um would I would I would advocate that we be planning for something that the town should be doing regardless. And in the event a regional facility could move forward certainly within 10 years that the number we place in the CIP could be transferred to a regional allocation versus um so it wouldn't be um I guess it would be a realistic reflection of capital whether it ultimately went regionally or was retained locally. If it helps, Charlie, the reason that you don't really see more in the transfer station in general is even if you know my pie in the sky is that we would go to a regional and all that, um I would still represent items that needed to be in capital now if they needed to be just currently there isn't anything that needs to be added to the capital that what that isn't already there. Um so we have paving and we have the cottage and things like that. the rest of the buildings there. One, the compactor was just um refurbished three years ago, I think, right before I took over. So, one was four. So, it's not within its cycle yet to show up in the um CIP along with the other structures there are just the reason you don't is there's nothing complicated about the transfer station in the like nothing's an expensive building. Nothing is overly complicated. Like we re- roofed the recycling building this year out of one again that was recycling money 100% paid for but it was just it's a smallish building that doesn't require high dollar amounts. There's not sheetrock in them. They're uninsulated all those things. So that the numbers represented to continue to maintain them is just small. So you end up being that the most expensive things are the compactor, the paving, the cottage maintenance and things like that. But or the tractor, the equipment, that stuff can be a little bit more money. But even people always get scared of like bailers. Like what happens if a bailor goes down? They're 10 to$15,000 items that are easily purchased. So you just don't see them because they don't need to be there yet and we handle mostly within our operating budget. So hopefully that helps a little bit though. I mean I understand where you were also coming from from a bigger picture. If the town that that's a little outside my wheelhouse, but if the town were to agree that we should do something in 10 to 15 years to do something regional, they should start putting money aside. But that's not my number to determine yet, I don't think. So, thanks both you guys. >> All right, Sam. So, should we >> Yep. Yeah. Moving on to page three. um highway and streets. Um for for the planning board members, uh the first item is sidewalk uh improvements. Uh at Tuesday, we presented our 10-year sidewalk preservation improvement plan. All the numbers that you see within this plan are represented within this document. So, if you're unfamiliar, I would kind of put push you towards that to review that document. Um and then you might develop questions after that, but maybe on the spot right now might be a little bit difficult. Happy to take any lingering questions if anyone has them on sidewalks. It's probably the biggest ticket item or to a lot of people the most important item in the page that we're about to go through. That means we must have done a good job on Tuesday. Nice job, Adam. [laughter] All right. Uh moving on, we have gravel road paving, which is just a placeholder at 2031. Um most likely at this time, we're projecting that would actually be Camp Sun Cipe Road, but um to be determined. Uh the next item loader uh unchanged at 2030. Uh this is where we talked about the trash trailers repres being being represented in highway and streets. Uh 170 and 29 and then 235. Excavator is this year 2028 coming up um at $200,000. That was a reduction I think of about $70,000 via a new partnership we have with a um company that's been giving us really competitive prices. Um, and so I was happy to be able to reduce that number and get more excavator. So, >> yes, please. That would be great if we can, please. Thank you, Lynn. Um, grater, again, I'm going to call it a placeholder just because I have no intentions to replace the grater, but in the event that we do not um get gravel roads paved before our grater somehow has a catastrophic failure, we may need to purchase one. I really do not plan to. I also think that there's options that if our grader was to have a catastrophic failure, there's other options to have companies come in and grade once a year at much less than 600,000. But I think similar to the fire truck and what we were talking about for the transfer station, it makes sense to keep that in there just as a realistic number of this is what it could cost us. Um, ground maintenance equipment, that's just lawnmowers. Um, but kind of what Adam was saying is, and I want to actually add to that in the beginning where he talked about we didn't stick specifically to that $50,000 threshold just so you understand what's going on with our items and what we have for inventory of equipment. But also, even though $15,000 doesn't seem like a lot of money and maybe shouldn't be within capital, that's a lot for me to absorb within an operating budget where some of my biggest lines are only, you know, 15 to $80,000. But you know 80,000 is built is equipment maintenance and so I can't buy a lawnmower out of that and then not maintain my equipment. So some of those items we choose to leave in CIP so that it doesn't add such um spikes in our operating budgets in general. So uh facilities vehicle um currently we have been passing down our wastewater truck to facilities. Um this was our first round of doing that. has been working very well, but I that truck is already uh 12 years 12 years old. Um so we know that in a few years it will most likely have to be replaced and you know we will adjust that number and that timeline based on the vehicle condition at that time but it is a new addition to the CIP. Uh 10 wheel dump truck in 2032 at 225,000. That is also a new addition um that this truck has usually not appeared within the CIP. It's currently a 2006 truck. Um, and we put no timeline usually on the replacement until it needs to be replaced based on the condition and the cost that it is that it's incurring for us to maintain it. So, um, we've gotten really good longevity of that vehicle just due to maintaining it well. So, uh, six wheel dump trucks, uh, those are just one tons, but we classify them as six wheel dump trucks because they're no longer called one tons because they all more than one ton. Um, [laughter] so you'll see that represented in a few areas, 2028, 2030, and 2033. Uh, the 2028 will be replacing a 2012 uh plow truck. So definitely due to be replaced at that time. Then you'll see below that line, six wheel plow trucks. Those are our full-size um trucks. The we just completed our cycle of purchasing our five new fleet trucks that are frontline um plow trucks, but unfortunately that means they have to start appearing again in our CIP. So, sidewalk plow at 2032, that number is unchanged. And then a highway pickup. We maintain two pickups within um the highway department, which is the foreman's truck or my truck um or the director's truck and then a like general use pickup that the crew uses to as a mow vehicle or um to get parts or so on. So, and that completes Highway and Streets questions, thoughts, concerns. Um, and just for uh PB, John, and Charlie, um I should have put these up your seat. I think Sam actually has the stack, but um copies of the sidewalk plan that have the details that the planning board was given the other night. All right, going to everyone's favorite uh sewage collection. Not a whole lot of changes there other than just some increases in numbers based on um what we're seeing in the world as we're doing them. So um sewer pipe uh supplyline and manhole rehabilitation those are in the 29 31 33 and 35 those are what's continuing to maintain your wastewater system that's over 100 years old in places. Uh we had really great success this year in our work that we were able to do with the money that we had. But um you know systems age quickly when they're in the ground. So, uh, Job's Creek valves and manhole. Uh, that's just continuing maintenance on our force main system that gets your waste water from George's Mills to Sunipe to be treated. >> Uh, >> hey Sam, quick question. Sorry. On the slip line, I've always wondered how long do those when you do that, how long do they last generally? >> So, slip lining lasts usually 75 to 100 years. It's essentially a brand new pipe within the old one. Um, which is great. So, yeah, 75 to 100 years. And then the manhole rehabilitation we use is it's through a company called Quadrretch and it's um I'm dropping the name of this the material that they use to put in the manholes but basically it's a polymer style concrete that they spray in and then trow into the inside of the manholes. And those have that system's been around for about 25 years but they project that to last 100 years. And they tell us that the existing manhole could essentially like dissolve around and the new system that they spray in it or product would remain and continue to support that for the next 50 to 100 years. So >> and at you know onetenth the cost of replacing manhole structures or sewer pipes. So >> yeah that's great. That's longer than I would have thought. So I appreciate that. >> Yeah absolutely good question. Thank you. Uh Job Seammens pump replacement. Those are just the wastewater pumps that move it. Um Edmonds Road pump replacement. same there. And then sewer realignment on Whipple Court. Um that is to straighten and bring the sewer pipeline that currently runs from behind uh Woodcrest down to Barrett Road onto Whipple Court and then down South Pleasant Street. The reason that we want to do this is currently the wastewater line that's there runs under a resident's house. So the sewer line itself was actually underneath a house and they continued to build an addition over it. Had it been done during modern times, I don't think that would have happened. But and then uh you'll see a main plant electrical upgrade. That's obviously just due to the fact similar to dispatch that there's a large amount of um electrical requirements at these pump stations, three-phase power with a lot of um phase inverters and things like that that we just want to keep up on so they don't cost us bigger money down the road. Uh main plant pump upgrade. We're starting on page four. Sorry. uh George's Mills wastewater grinder unchanged and then a sewer department pickup in 203485. Uh again, similar to the facilities truck and all actually equipment in the highway department and sewer department transfer station. Um we don't we put them there as placeholders, but that doesn't mean that that might not change in the sense of we may push it out based on the condition being wellmaintained or if the vehicle starts to give us problems, we may move it closer, but we always put something there as a placeholder. So, and I think in a relatively short period, we got through all of public works, but I might make you guys all hang out. We'll go get the the building's asset report. We'll make we'll go through >> just to kind of experience it together. >> Sam, we're in the thinking generally this is vehicles and large equipment. >> Lease versus buy versus contracted out. So grading might be contracted greater could be leased possibly. Where where in are you at a place where you've started to conclude whether it it makes any sense to lease versus buy in particular? >> Yeah. So we have looked into leasing even for the six wheeled plow trucks and most of the time it hasn't been cost effective. It also puts you usually at a very limited date so you're always stuck in a payment. So like to lease a six wheel plow truck, they the max they'll let you lease it is five years and your payment each year is like $75,000. So you quickly exceed the cost of just building a truck and keeping it. We usually keep our trucks for anywhere from 10 to 15 years. Um so currently it has not made financial sense with the numbers given to us by um companies when we've done that because we have gone through those exercises each time. We've also, you know, sold some equipment before, um, like last year that we decided we just didn't need anymore and it was cheaper just to rent the equipment occasionally each year versus trying to maintain a full-size piece of equipment. Um, so it's kind of handled on a base by a case- by case basis, but we haven't found something yet that's been specifically sticking and working because the lease just seems to be like you're paying just to always have something new and we don't always just need something new. So, >> um, and we always try to purchase when we can and negotiate extended warranties on all of the equipment that we buy, and that's worked out really well for us. >> yeah, thank you. >> Thanks, guys. Uh, questions from folks. >> Yeah, Charlie. Actually, David, then Charlie, >> thank you. [clears throat] on page four under culture and recreation. There's no budget for that. I I have to tell you, I think Putman's doing a phenomenal job with the kids in the summertime um providing instructions for swimming and activities for them. I would like to see that expanded to include more kids during the during the winter and and springtime and also for senior citizens for seniors to be able to go on some cultural trips and and under the recreation department and expand that program. So I I would love to see an an item in there for future recreation developments and for kids and seniors. David, so I did have discussions with Putinham last week about capital expenses that he may foresee. Um he didn't see anything as ready to include this year. Um they are working with a playground consultant, I guess you would call it, um on some future playground work that I think next year it's likely that you'll see a capital um project related to that. As far as his programming and his annual um budget, I think when Putnham is on the docket for this Lechman's um budget day or with the budget committee, um he would likely be very receptive to um those discussions as part of his operating budget. >> Thanks, David. Charlie, did you have a question? >> Um [clears throat and cough] we we've not put anything in this plan uh related to water. Is there anything we should be thinking about along those lines? >> I think the hardest part for the way we have things set up now is that all of these are tied back into our budget setups and so when we don't use the the water department's actual budgets are not part of our system. Um you know I did have discussions with a planner at the state last year um about you know how that interfaces and um because obviously we don't include the school either and they do their own um capital improvement and um any other sort of the county or whatever it may be all these other layers of government um that those are really the sort of obligation of those organizations. The difference being if there is something foreseen as far as a cost sharing goes that it's actually an expenditure of the town of New London's. Um in that case I think what it would go in is under um sort of under public works we'd have to sort of put some expense in um one of their existing siloed budgets of X for investment in system. Um, but as far as, you know, the water systems, trucks, and all of those individual items, we couldn't easily roll that into our system. >> And I would just add to that to say that those conversations are ongoing with the water precinct about the possibility of cost sharing models and they're in the middle of another engineering study on the on the well fields at the moment. So it might be too early at this point to put money in for that. >> Does that answer your question, Charlie, for now? Yeah. Okay. >> Yeah. Paul, this is in the nature of a general question. Uh more to um help the planning board at looking at the CIP. Um, and I just I would I guess John, Charlie, and the select people, I would ask when the CIP is approved and it goes to the budget and and select persons, um, do you look at anything other than the next year, possibly the year after? >> I can talk to the budget committee. Um we look at the immediate capital requirements for the fiscal year we are budgeting for and we then look out what is the obligation that comes with that capital expenditure and that comes into the funding area of funding discussion. How how will it be funded? Bond other mechanism over what term what period and how does that project out over the length of the bond or the length of the financing instrument? um and where there's a recurring expenditure the aggregation of debt for example then I think at least not speaking for the select board but budget committee as well would be what is our budget threshold what's our constraint from to handle debt um at what level over what period of time so that's generally how we try to think about it and treat it. >> Um the only >> Can I make that can I make a make that question even muddier? Um, so, so when I looked at this, I one of the things that I came in here kind of wanting to get my head around was what do we as a town spend every year just to sort of run and by looking at this, you know, using these numbers and even listening to some of Sam's um, explanation of operating budgets and which is great. Thank you. Really well answered. Um, you know, I'm I I came up with a a window that we spend around $900,000 to$1.3 million to keep the town running every year. Now, here's what I mean by that. Roofs, pumps, um, trucks, equipment, cars, cruisers, like that's all of the replacement value. It's almost any any expenditure under $500,000 per year. I sort of lump that in a normal category. we got to we have to replace our greater. We have to you know all of these things are just sort of come up. So when you get to a year that's over 1.3 all of a sudden you're looking at something that is special. And then I think that goes back to Charlie's question. How do we finance? How do we fund that? Do we fund that knowing that we have this regular expenditure every year? Um and and do we can maybe say that we're going to assess taxes for that amount if we break it up in that direction, but do we want to fund these other what I'm going to call exceptional amounts? And I mean that they are the exception, not I'm not trying to place a value on them, but these um exceptional amounts of over 1.3 million, do we levy taxes? Do we set aside a capital improvement fund? Do we take out debt? Do how do we finance those in the long run? And I do think that that's where the water system, the water precinct in the school, even though we're talking about things that are outside of our purview and we have no control over, I understand that those things matter because they do still end up on the same tax bill. So, they're conflated by the citizen. And um we would be wise to think about those so-called exceptional expenses, as I called them. Sorry if that muddied the water, but that's how I was approaching this meeting. If that made any sense. >> Yeah, it does. I think this I I think this is gerine to exactly what you said because I'm looking at this 10-year thing that we've labored over and you know obviously all the departments have labored over and there's nothing out I mean essentially if you take your number there's nothing out there after the first two or three years and I I guess to that point to my knowledge, we haven't set up a capital reserve account for the police department. Um, I think we did. I think we have a an account for the ladder truck, things like that. But I I'm just interested in the process that then goes on after this comes in of saying, you know, what are we are we properly acknowledging things to the future? and are we, you know, are we really thinking that we don't have $5 million, $10 million out in these seven years that that we've looked at? And I think Charlie and I have had the discussion about bonding and thinking about the debt and stuff like that. I'm just I honestly I'm just wondering on a yearly basis, which I know the focus comes down to what's the tax rate and what what are we spending um how this plays into that. I just want to add um when you guys are done and you adopt your CIP, I marry that to a capital reserve spreadsheet that looks pretty similar to what you guys are seeing, but what it does is it takes into account what we already have in capital reserve, what we're going to add, and what we're going to use over the next 10 years so that they can see, everybody can see where we're going to land, when we go negative, and that. So, I I can share that document with you if you want to see it. Um, but I know that that's a document that they look at very closely to see where are we going to land and and when are we going to have to increase things. So we do marry this to that >> which if that helps >> which then helps us with our discussions and decisions how much to ask the taxpayers to put to add back into capital reserve. And I just wanted to say we did establish a police department capital reserve this past uh town meeting and we put $100,000 into it. >> Okay. I have nothing more. [laughter] >> Thanks Paul. >> Um I think there's only one item that we haven't discussed yet. Um and it's under conservation. Um, and so most of you will remember from conversations in previous years that this number is just sort of a placeholder that is essentially in a random year out in the future knowing that at some point there's going to be some land purchase that comes along and it's not necessarily tied to a particular parcel. Um, I talked to Mark Vernon on Tuesday just to obviously he's the new chair of the conservation commission. He may have a different outlook on that. he shared that he thought that was still a relevant planning tool that um this is really just a a placeholder so that in the spreadsheet like Lynn is talking about and and um BB mentioning that it still stays in the mind of the budget committee and the selectman as they're figuring out transfers to capital reserve which we have a land acquisition fund that there may not be a specific parcel identified in the future we know that there's always a desire to um have the ability to act on a parcel that's desire desirable that comes available. >> great. Thanks. Good context, Adam. Uh, other questions from folks on any of this? I know we've covered a lot of ground here. And so then I think the the next question is having heard everything now, is there a desire to um move anything or make any adjustments to what you've heard or do you think everything is um you know justified in the year that it's in the the project and we can move forward with um finalizing the the narrative that goes ahead. So that the next meeting would be probably midepptember. Um and we would um bring to you the narrative based on um this document being very solid at this point and then at that meeting we would leave saying yes this is ready to go forward to public hearing. >> I don't have anything to say right now but I'm absorbing this and there may be further questions. It's likely there will be, but >> I've I have historically been an advocate and remain that in the narrative we if we we consider including a little more detail around assumptions associated with particularly large expenditure capital expenditure items primarily from the standpoint that I think this is an incredibly well-informed and talented group. And um rather than be questioned in a public forum, um well, how'd you come up with 10 million for that one? Oh, well, we estimated it based on what the contractor said. And I I don't think that I don't think that I I think by adding a little more substance to support a particular expenditure, especially the larger ones, would serve the presentation at the public hearing as well as ongoing discussions so that people aren't sitting there thinking actually they did, you know, this and it's not that. It's a lot of thought has gone into this and whether the assumptions accurate or not that's a that's a different discussion point but that there is an assumption to support particularly larger expenditures. >> Um and Charlie I was planning on asking you if you were I know you did the lion share of our narrative work with me last year. So if you're willing to participate in that. Um I think what we to understand what those assumptions are that's going to fall back on the department heads to provide to us. Um so if maybe we could um in the next couple of weeks get them feedback on which items you think they should focus that on they can get some of that information to us. Um Maryanne as far as additional questions go we have a regular planning board meeting on September 8th. Um, I think if we add CIP as just sort of a very quick um, agenda item that night as a okay, we've had a couple of weeks to think about it. We need all of your sort of final questions then and then we can plan to meet as a CIP committee that second time the following week, the week of the 14th. um we can hopefully take anything into account in that um that week's time so that hopefully the week of the 14th we are pretty well tied up and ready to move forward for um public hearing if that sounds fair to everybody. >> Adam is it would it be too much work to ask for a fiveyear actual going backward? Here's here's why I asked that. Here here's why I asked that. So, I'm I'm I'm trying to figure out what the normalized expenses are over the years. And and I can and and some of this I can sort of easily get my head around by the amounts and what they are in here. But then you've got these more exceptional expenses in here. Like for example, the $10 million down on Pleasant Street um for the Department of Public Works, that's going to obviously be, you know, an unusually high amount. What I'm wondering, and we've got three of those right in a row. >> And so what I want to know is as the window gets closer, do the amounts go way up? And [clears throat] this is simply factoring back out to our normal expenses minus what it costs to actually maintain the 32 structures that exist in town >> or are these truly exceptional events and and we should budget for them in the short term because one would suggest different taxation strategies, one would suggest different reserve policies. I mean there's a lot of policy things that we could address by having sort of a 5 to 10 year uh report that goes backwards so that we could see if if what we're proposing forward is normal. It's >> all you Lynn. >> It's not [laughter] >> I know. [gasps] So, it's not just like I can't just run a report, but if I can if you and I can just talk and I can get a better understanding of what you want to see, I can probably marry a couple together and and and figure out something and that will help you. >> And it won't tie back necessarily to our CIP of those years. The CIP has changed dramatically in the last 24 months. I think 10 years ago it was like three items each year. Um, and they were like the three priorities. So, um, Lynn's information may not be directly pluggable into our old plans, but >> yeah, it's and I I what is it was it two years ago that I started marrying CIP to capital reserve, but we can look at capital reserve in relation to, you know, what we thought we were going to spend. So, yeah, we'll get it together. >> That would be the next question, but this one would be before that obviously. >> Okay, >> great. Any other questions? >> Okay. So then as far as planning board. >> Yep. So we have um some regular items on on the ETH and um there's just a couple of things. Um so we'll have some time to just sort of collect thoughts. Um Charlie John um and I'll make sure BB knows this. You're welcome to attend on the ETH, but I don't anticipate that we will um get deep into discussion. So, and it will be videotaped. So, if you have better things that you want to do with your Tuesday night, understandable. Um, otherwise, we're happy to have you join us at the planning board meeting. Um, and then for the week of the 14th, um, I think if we could maybe take a quick look at folks calendars and try to identify a day while we're all in the same room. Um, do Thursday mornings tend to work well for folks? If we were to do Thursday the 17th at 8 a.m., does that >> Yes. Yep. That way if we have any questions, we can sort of answer on the fly. And >> the 17th doesn't work. Okay. Um, are there other days that week? Wednesday the 16th. No, >> would this be tentative? I mean, if there's no changes, >> well, we'll still have the narrative to review. So, I think we'll need to we'll need to meet in some fashion. Um, it may not be a very long meeting. I wouldn't anticipate it'll have the length of this meeting, but um, >> 18th, Friday morning, the 18th. >> 18th is better for me. Sorry, I'm in an email chain right now with Darren and Shannon and we have identified Friday the 18th for Tritown. >> Oh, okay. >> What What time is that meeting at Ash? >> 8:30 here in New London. >> Could they adjust that to 9:00 a.m. and we could have 8 to 9? >> Yes, as long as Janet and Emily are okay. >> I won't be here. Janet's not here. >> So, if you guys are okay with the double header, I think it's realistic that we could do 8 to 9. If we if we made it through all of this in an hour and 50 minutes, I think we can make it through the next in an hour if we're efficient. >> Yeah, that works for you guys. Friday morning the 18th, 8 a.m. >> I'm out that I'm out that whole week, which is fine. It'll just make your meeting shorter. >> Okay. [laughter] >> And John, you and I can connect the week before if you have stuff that >> Yeah. 18th is better for me, too. >> Okay. So, we'll plan 9:18 at 8 a.m. uh right here. >> Perfect. Yep. Great. Thank you guys for all uh making this big block of time in your schedule. >> Yeah, I really appreciate everybody, all the department heads, budget committee, select board, planning board. Um yeah, this is great. Good to get everyone in one room and just knock it out as quickly and efficiently as possible. So, thanks for all the prep that went into this too for all the people who Great. I just need a motion to adjurnn. Second. >> All in favor? I.