Litchfield School Facilities Improvement Committee - 07/09/2026
Speakers are labeled SPEAKER_N. This transcript is machine-generated.
Committee for the Lichfield School District will begin tonight's meeting with the pledge of allegiance to [snorts] the flag of the United States of America and to the republic for which it stands, one nation under God, indivisible, with liberty and justice for all. >> Sounds like our batteries are running down. [sighs] So, we did not meet last month due to just too many other things going on. Um, to kind of bring everybody else up to speed, there really hasn't been much. I know Haramman's kind of just moving forward with stuff. So, Mr. Okonnell will give an update later on tonight. And otherwise, yeah, just has everybody had a chance to review the meeting minutes for April 9th and May 14th? I just want to open it. Make sure there isn't any comments. I don't see any comments. [snorts] Excellent. Tools. Excellent. Everybody prepared to vote on the meeting minutes? >> I make a motion we approve both of them. I will second said motion. >> Although I was going to say additional discussion. >> I always forget that part. >> Was everyone who's voting there for both? >> I was not. >> I don't know. I'm saying a chance. >> All right. So absent on April 9th was Joeitis. Rich Lasales was the only um voting member that was absent. So, I would say we are we'll go with April 9th. Uh, can you amend your motion to do these one at a time? >> Sure. I amend my motion to do one at a time. Start with the nth. >> All right. I will second that motion to vote on the meeting minutes for April 9th. Uh, additional discussion. >> Do we have a quorum? >> Yes, we do. >> Okay. >> I All those in favor? >> Okay. I I will abain. >> Abstain. Abstain. Well, you're not a voting member. >> Oh, that's right. We're both here that >> and Mr. Lalis abstains. >> I was I was Go on. >> Yep. All right. Uh, going forward to the May 14th meeting minutes. Mr. Lassard was not here, Mr. Lales was not here and Marilyn was not here, but we >> I read them and I like them. >> I was going to say, yeah, >> you don't [snorts] have to be here to approve them. >> That is very uh Yes, you do. Cuz you when you would say, well, sorry. Yes, we can approve. You guys will just have to abstain. >> Can someone approve if they actually watched it on TV? >> Yeah. >> And just approving that the minutes are what the minutes are like. But I don't have any problems with the minutes. I don't feel like I need to abstain from that. >> But you can't you can't sort of I mean you're kind of saying they're valid and you can't do that if you weren't there. >> Yeah. Because at the school board I'm not allow like I have to abstain if I even if I read the minutes and watch the video. I still have to abstain from approving the minutes. >> All right. >> So that gives us two voting members to approve those minutes. But we have three abstains. How does that work? I mean, you have enough to vote on a majority to approve it. >> Okay. All right. >> I vote to approve. >> Additional discussion. I feel like we just have it. [laughter] >> Uh, all those in favor? I. All those opposed. All those abstain. Excellent. Those meetings are also approved. >> [snorts] >> How does everybody like the new format of they're just in the folder, you guys go to the folder, make comments? I looked at the permissions. It looks like who needs to be an editor is an editor and everyone else is either a commenter or viewer. So, does that seem to be working better for everybody? >> Except that I accidentally commented by mistake. It worked very nicely and I was able to do it when it's fresh in my mind. >> Perfect. Excellent. All right. Moving right along. Uh gonna open. We're gonna begin our community input for tonight's meeting. I do not see a community members here this evening. So unless would you >> No specific input for those I didn't meet last time. My name is Marley Taylor. I'm trying the group out to see if I want to be a community representative and officially join in in the group. Um, so I can't vote. >> Welcome to the party. >> I can't vote. I can't do anything like that. >> What's your name again? >> Mara. >> Um, so I want to listen. Um, I ask questions. I'm trying to learn. >> Good for you. >> Yes. Thank you. >> Absolutely. >> Excellent. With that, I will close community input and I will go immediately over to old business. And I guess we'll start with the GMS project or do you just want to start with end of year? >> I mean, we can just go in order. It's >> okay. Yeah. So, we'll start with a GMS project update from Mr. Okonnell. >> Yeah. Uh, we met with Herman a couple weeks ago, I think. Uh, it was lightly attended, but it's okay. They provided uh an update. Um, just included, you know, further plans of the work that they're doing. they're getting into like the layered uh plans, you know, your electrical plans, your plumbing plans, your everything else kind of associated with it. Um, so making progress in all that. >> Excellent. >> Um, Harvey obviously was there and part of the process because they're pricing stuff out as things go along and we're meeting again with them on the 21st remotely 4:30. Um, the invite is out there. If you need it again, if you're on that group, just let me know. When I'm sorry, >> the 21st 430 July. >> Yeah. Remote. >> Is it the same invite for every meeting? >> Because I always ask Julie to get another invite. I don't know if I have to. >> I don't think you have to. I mean, we can resend it always. Like I can res >> I kind of like that, frankly. [laughter] >> Let's do that. >> They resend it. >> Yeah. >> Oh, yeah. Me, too. >> Yeah. [laughter] >> Um, just to put it I'll just say reminder, I will do it right now and I will try to remember to do it closer to the 21st as well while I sit here. >> Uh that's at 4:30 and then uh they'll give us an update. We're still [snorts] targeting to have kind of the finished thing uh for vetting throughout the month of September and then the final project with price for October turn in the budget. Um, we've also been meeting with uh I don't know what his actual title is. I call him a videographer. Um, but that's we may not end up doing videos with him, but someone to help us with some of the public relations stuff. Um, he's put a proposal together. We haven't committed to any of that yet, but just uh um to help us with kind of the roll out of everything to make sure we're doing goodformational stuff related to it. We'll probably Well, we might shouldn't say probably. I don't know yet. Um do some videos related to different aspects of the project just to inform, you know, the community what's going on and stuff like that. So, we've been we had a good meeting this week, me and Dan, uh with this guy. His name is Eric. He's done a bunch of projects throughout New England. This type of work, um some pass, some don't. you know, his work is good, but you know, um, but we want to make sure we continue to inform the community, especially when we start pushing it like in six month window, you know, ahead of March and stuff like that. Y >> I had the chance to watch his Hollis video, I believe. >> Yeah. >> I I love videos. I love getting out to the community. I don't think we need to do something similar to what he did for Hollis for Lichfield. I think you guys have done that already. >> Yeah, he has lots of different like things. So, that Holl video is the one that we saw because it's a New Hampshire video. He's worked with, you know, um bunch of school districts in Maine too that are completely different. They're like shorter and like quicker. If we're talking about the same one, the LA one's pretty long. >> Yeah. And they had the school board in >> Yeah. And it was a lengthier thing and um probably more costly. >> It is. Yeah. So, >> which is why when I moved here, I said if I wanted to pay Hollis taxes, I would have moved to Hollis. So, I strongly suggest we don't go that way. >> Well, he has different different like options, right? like he's laid out a different bunch of different things for us. We have not committed to anything. We would like to know all the information first and kind of have a little bit of an alocart menu of what if anything we love to do with him. But um that's just on our mind making sure we do goodformational stuff around the project as we kind of once we have the price finalized we're getting that information out to everybody and uh so we're working on that aspect of it too. >> Excellent. >> That's where we're at. Excellent. Any other questions for now? >> Okay. >> Is there a way to Did he just Does he have a link where we could go and see some of his shorter videos or >> uh I can ask him for some samples? I just have an email for him right now. I mean, I think you can um I'll see if I can get the school districts in Maine because those are the ones you can find the hall stuff. Like I said, that I don't remember the name districts off the top of my head, >> but I'll ask him for those. And then um >> yeah, just a handful of links would be great. >> Yeah, >> if he doesn't mind sharing. >> I don't think so. I think it's all public stuff because it's for the different projects and everything like that. >> Okay. So, this next topic this is >> I don't know what this topic is. [laughter] >> This is my topic. Okay. >> Um, so I have been pondering in the background of how I would take a project like this and if it got denied in my company, how do I reapproach this and try to pass? >> This is the alternate strategy one. >> Yes. >> Okay. Just want to So the numbers are from publicly available numbers. They are not they are estimates. They are numbers that came from the community forum number three. This is me postulating with my ROMs and everything. This has not been presented to anybody. This is the first time. It's also not as polished as I would like it to be. I haven't had a chance to really polish it up and make it exact level ready. So, just keep all of that in an open mind. >> Half baked is what you're saying. And and I'm gonna say that >> the the the center is still squishy, but the outside is done. [laughter] >> It's beautifully done and well thought out, but do we want to publicly give them another option on a meeting? >> Well, I think they need because you're looking at what 35 million. >> So, so I guess just >> be a tough sell. >> So, I will go through this. >> The option >> the end game and the option is not changing. I have not changed that. I am proposing an alternate strategy to reach that end game. >> Right? >> So this would be I need to go build a new factory. They said no right away. Hey, what if you know I built the structure and the slab so I can do storage and that's half the cost and I can do other stuff. But the endgame in the option is still the same that we're trying to achieve. >> More of a pay as you go kind of option. I I can run through that, but essentially this is how I would approach this with my exec leadership of if I had to get something like this done and it was told no at the very beginning. >> Okay. >> All right. Is everybody on board to go through this? >> I'm intrigued. My interest is peaked. >> Okay. >> So, we're assuming no does not mean no. >> I am assuming. [snorts] See, it depends. Depends [clears throat] on what the no is because the warrant articles for the bond, right? >> So, not that the project is necessarily a no. It's to receive the tax impact. >> How would you fund it if the answer is no? >> Is this a no fund no cost option? In which case, why aren't we just doing this? >> Well, I I think you're you're phrasing a little bit off in that, right? Like you're not assuming that this is a no. This is how you were going to approach getting this project passed at this point, right? like we're still pursuing the remodeling project, >> right? >> And it's still the same. >> Hasn't even been voted on yet, >> right? >> And this is how you're proposing that we present it to the voters to vote on >> to make it >> so that we can accomplish. Yes. To accomplish the final goal with a more what I perceive as a more palatable um option to the taxpayers. >> So there's been no vote yet. Zero votes. >> Right now, the original one is full vote all cost. You're And your alternate strategy is sli slice and dice it into smaller pieces to make it more palatable. >> Why don't we let him go through it and we can >> and then we can find out. >> I just think you always know and there's no money for it. >> I think at this point you can talk about what you want to but I think you are money the waters >> and I think this into the game. >> Well, but I I guess >> present >> let's talk through it >> and thank you for coming with ideas for us to talk about. So yeah, I'm just going to go through it. yada yada yada. So this is the final design that we are currently pursuing. We are currently asking Haramman and Harvey to get us guaranteed maximum prices on. This is option 1B from community forum number three. So this is not changing. This is still the end result of what we are trying to achieve here in Lichfield for Griffin Memorial School. >> So, can you remind me what the lines are on the top? Is that like a canopy or is that like sidewalk on the outside edge of first floor >> up here? >> Yeah. So, I see the classrooms line up. What are my lines? >> First floor, second floor of this building, >> right? But so the horizontal lines, >> it's where the portables currently are. >> Oh, okay. Gotcha. >> Okay, that that makes more sense. because I was like, is there a covered walkway there? >> It's really hard to read, but there's a legend kind of in the middle there that says what the patterns mean. >> Gotcha. I think that >> Sorry. Okay. So, just wanted to be clear. I am not changing the final design objective. >> Okay. >> Current strategy is, as you mentioned, full boore. >> Mhm. >> $35 million bond. We're going to get that number. This is the number that was presented at community forum number three. So I did it is it was a ROM estimate at that time. It is still a ROM estimate. Not trying to change that number. Expected start year of construction would be 2028. I'm estimating based upon what I have run on something on this level is about a 24-month construction time. Could be longer, shorter depending on Harvey's schedule. That's just my estimation going off of the one of the schoolboard meetings where we ran bond examples. That's what this information is is from that same school board meeting. So that is again already presented publicly. I am not coming up with anything new. So that way people can't yell at me later. Um this bond example is off of a $20 million bond. I took the one for a 29-year level principal example. There's other examples in there for shorter and level debt. But if I multiply that out estimated, again, this is me playing with numbers of if I was just to scale it of a decent tax impact that you would see and it's averaged in the or it's a range just because the bond example ranges for the estimated annual tax impact. >> I'm conf that's a huge range. So I'm kind and if my value is 600,000 I guess. Yeah. So what is the low end based on? high end based on >> the low end is based on the lowest number in your estimated tax impact which was I did 6 up to 1.34. So the range is purely out of the tax impact hits differently depending upon the bond note and the level principles at least that's the way that I am interpreting this. So that way your actual tax impact would range on a on an annual cycle. It shouldn't. It should be the same every year. >> I I don't know how it's done. It's how I read this document. >> It all depends. >> I want I don't want to interrupt like every part of >> No, [snorts] I understand. But you're a thousand difference. >> I know. So, >> please interrupt. Poke holes. >> It's not poking holes, but like I want to hear your strategy. I want to be careful here because I want to hear your the strategy because I'm curious and I I understand what you're doing by putting a bond here, but like there are lots of different types of bonds we can apply, right? Like this particular example that you did here does do that fluctuation. If I was [snorts] advising, which I will probably do at some point in my role, >> I wouldn't advise the board away from this type this community from this type of correct >> right. So it's a more fixated number that is level in the sense of what you're paying year after year because I think I from I was not here but I have been hired so I followed in the background the process the last time this got voted and when the bond gets too confusing and the year stuff changes too frequently it makes people it seemed to have made this community really nervous. I think too some people are like, "Yeah, I can afford 630. I can't afford 1,400." >> Right. So that's >> understood. >> So I I I don't I don't think your presentation's about the bond. >> No, it's not. No, no, it's not. >> If there's people walking watching at home to give some context, like I know exactly what you're doing, like why you picked this and like go for that. But like that's a valid question. What's the fluctuation of that? There are multiple ways to tackle the bonds and you know at this point in July I would advise the board in the future I could change my mind so please don't hold me to this because as we go through the bond process there's different things we can talk about the different rates you can get yada yada but based on like today July 9th I would say level level bond is what you want throughout the the length of whatever the case may be >> I purely pulled these numbers because these are numbers that have been presented publicly either in school board or in the community forums before just more of I'm not pulling numbers out of my head. >> That's fair. I just as a when it comes to the budget committee meetings I think there will be concern about that. So just as you present this reconsider the bond option. >> Quick question. Did you work with this on with anyone else and have you shared it with anyone else? >> I have not neither. >> So this is me. I have asked other community members what they thought about a different strategy to achieve the same end goal of which as Carrie's already pointed out is a multi-phaseed approach to reach that end goal but on how they would feel about it but I have not this is the first time I'm putting it together and starting to get it out there because I want holes poked in it. We want to hear feedback and if this is something that we feel as a community is this a more palatable approach than going for an end all upfront >> but this is the current one right this is all in >> this is correct >> so even when you present so this one is in some form going to probably be presented simply because this is the current I would be very so back to the bond I'd be very careful about [snorts] what I present because 630 to 1400 is too wide of a range in my opinion and I would advate to the So when this goes to get presented, >> the bond information, >> right? We will have the bond information that we that the school board is interested to pursue. >> This is just the example that we ran back in I think it was was it >> April? No way. >> It was like January or December of last year. >> So it wasn't that long ago >> when this was presented at the school board. Yeah, it was >> a long time ago. Yeah, because I had to go back in all the meeting minutes to find >> do all this work in the event we were doing it in March 26. So like we would have had to have done that work during the budget process. So I'm assuming December. Don't quote me. >> This number isn't really [snorts] accurate right now. >> No, it's not. >> I mean the number we don't need to poke holes in this aspect of it. I think it's the larger thing. But like yeah, the numbers aren't accurate because this is a rate from actually 2025. >> Correct. >> Oh, don't worry. I'll p >> All right. I guess really I'm gonna focus on the pros and the cons, right? The pro of this strategy is the total cost of the project will be cheaper. I'm I'm going to put that out there to the taxpayer, to the town, to everything. It will be cheaper for a total cost. >> The final state of what we're trying to go for is reached in a much shorter time frame. Mhm. >> So that that's why a lot of people go for this. That's why fiscally this makes sense from a town district perspective. The con of this is >> there's another one. >> Okay. The con that I came out of this is this has a higher a potentially higher annual out-of- pocket cost to the taxpayer. And that is where I feel like the previous attempt back in 24 was a main driver of it getting rejected is that that skyrocketed. There was also I I'll say confusion around land verse where and why >> scope was unreasonable. >> So but from a taxpayer perspective that's the feedback that I was getting from the people that I pulled individually and from our community survey that we put out last year. My other con on this, just so you know, going back historically, the last time we had a bond, that increase was not temporary, it became permanently built into the baseline budget. >> That that was 25 years ago on CHS, >> but it was it was never rolled back. It was never pulled out of the budget after the final bond. >> Yeah. So the concern I would have going forward is whether what did it was it was supposed to be rolled in to get this GMS maintenance. >> So >> it never happened but it was supposed to be go back and look at notes. >> Huh? >> 2015. >> Yeah. >> There was a conversation during the budget committee meeting about returning that to zero. The school board promised that they would invest that money in deferred maintenance to GMS. Think of where we'd be now if we were printing $700,000 a year. >> Makes me want to cry. >> Yeah. >> Going forward, you're not going to allow that happen again. >> I You have the history. >> I tried not to let it happen again. I voted vehemently against it, but the historically my concern would be 630 to,400 or whatever the number is now is not a temporary number. It may based on history become a permanently bakedin increase. Okay. But that's not a con of the strategy. That's a con against the administration at the time to make sure that we don't repeat >> annual cost initially. >> You would argue we would say we pay more initially because it cost us less in the long run. >> So if we pay more initially and continue paying more initially forever and ever, I never actually achieved the experience of having paid less. >> But I I guess >> well let's let's get through the strategy. No, I'm just saying >> at the current rate we're on page two. >> That would be a concern, >> not as a budget, as a taxpayer. That's my concern. >> It's also hard to to to bind future administrations to what's happening today, as you well know. >> Oh, absolutely. Which is why I love the theory that it's less money in the long run, but I don't. But citical side says I don't believe it. On the positive side, many of us will not be here in 30 years. [laughter] >> I'm living forever. So far so good. >> I don't I don't understand how that's a [laughter] >> Yeah, keep going. >> So So is everybody Do you understand where I got these numbers? So then that way you don't I I don't get crucified later. >> Okay, we're crucifying you now. >> Okay. Yeah, that that's fine. All right. Ah, two phases. >> My proposed alternate strategy is two phases. Again, the numbers that I have and my assumptions and everything is there. Phase one comes down to doing the twotory addition. Replace the roof and do the required restructuring of the roof. You can do the facelift of the hallways and any of the existing structures. This is a facelift. This is not I'm going to go make everything happy, joyful. This is we're going to go do paint, carpet, what whatever we need to to refresh it for the time being. >> No HBAC or in the country >> in the existing structure. No, at the point of that would become a sunk cost later on. >> And after spending $20 million of a phase one, no one's going to pay for a phase two. >> And in Yeah. Here in the country, we call this lipstick on a pig. >> And I would question the contingency. You're doing a lot of joining to old work. You really think 7% is going to be sufficient? >> So this is above and beyond the numbers that was provided by Haramman and Harvey. This should be it should be your owner's contingency should not be built into the contractor's contingency. >> Correct. So this is above and beyond the contingency that that was in the numbers that they provided. So >> that but that's their contingency. Our contingency I would argue should be closer to 10%. >> Could be I wanted to make it a nice pretty round number. >> That's why I figured you chose. Oh, [laughter] that's why. >> But I would cons I would argue that it's still >> so 10% it would go up to 20 and a half roughly maybe a little bit more. >> Yeah. >> But the idea behind this is one we remove the portables. We get the and I have pro I believe I have procons later but I can talk about it now. We get all of the square footage that we need for the educational expansion for the pullouts and all of the classrooms. And we can relieve the congestion and the pullouts in the hallways and while also fixing the leaks and the water issues that we see in some of the buildings and we can restructure the roof as we see fit because we're going to tear it off anyways. This is any of the roof restructuring. So is I'll call it um is covered by the roof cost. How I got to that roof cost was I took our estimate for CHS and I said it's roughly going to be the same to to do it and that and the roof restructuring >> feet. >> Yeah. I I didn't pull up the actual numbers, but I remember when I first got involved with FIC, uh Dave pulled out a number of like a million dollars to re-roof it. So, I said 1.5 to do any fixing and restructuring, any of that stuff. Again, my estimate that that's all I'm basing it off of. >> So, we reinstall old air handlers, whatever else is on the roof. >> Yes. >> Okay. >> Does this include the piece of the building that we're want going to demo? >> Yes, because it still needs to be used. >> Say that again. Why does it still need to be used if [clears throat] you have a two-story edition with all those classrooms in it? >> Because the twotory edition can't be built in a summer. So, you're still going to use that as they build the twotory edition and then utilize that. And now, >> you're Yeah. I mean, you're also not going to [snorts] draw a line on the roof and say like, "We're not going to demo at the end." >> Yeah. >> So, I demo work. >> It's It would be considered a sunk cost, but It it's when you phase a project, there's going to be some cost. There there's very hard ways to get around it. >> Wait, I I I'm going to chime in for a minute. I really wanted to be teamed in on this. I really did. Um [laughter] >> at my job, so I work at Philips Academy in Andover, Massachusetts, which is a completely different understood endowment. >> We won't hold it against you. >> That's okay. [laughter] >> Thinking about it, though. >> You shouldn't. You shouldn't because I work for museum that is part of Philips Academy and basically we are an independent cost center. So Phillips Academy has a billion dollar endowment. We have a $12 million endowment and we needed a building update and Philips Academy fought us tooth and nail until we could prove that the conditions in the building were actually deteriorating the collections in the museum. And so we could show them actual physical deterioration and be like you're neglected. We'll go to reporters and show them the neglect. Finally, they listened to a variety of things. It was supposed to be a singlephase renovation. They broke it down into two phases because of cost. And I'm living through phase two right now. And I can tell you that life would have been so much easier with one phase. >> 100% agree. >> So, I hear I hear you and I I wanted to I want to be on phase two team with you because like I I kind of understand how to sell that in my lived experience. However, there's always the systems implications of the HVAC, the electrical, the plumbing, and the number of times these contractors have been like, well, you know, if it the first time would have done it, right? I wouldn't be needing to do this work right now, right? It's always the first guy's fault. So, there's always more work and, oh, it doesn't actually line up. We need to cut this thing and we need to move it six feet over here. And so, the costs are going up and more and more is getting value out. >> I I >> And so I know you understand that, but I'm just kind of I'm saying that out loud that I think a twofphase strategy. I totally am on board with the thought of marketing and I appreciate that you're trying to make a case for it and I would help you get on that case for it if that's where people end up. Um, through lived experience, I can say that it definitely >> adds time and money and the space between phase one and phase two is never what you think it's going to be. >> I I 100% agree with you. >> Yeah. I don't think anybody disagrees. I [laughter] don't think this is like anybody's ideal approach. The ideal approach is is the one phase all at one time, >> but the reality is 360 to 800 is a lot more palatable. >> Well, that's what I'm saying. The idea of getting a whatever was 35 $38 million thing passed in one shot. I just don't see it happening. That >> that's so that is ultimately my concern. I don't see 35 passing. >> However, we've gone through this. Um Peter had brought this up the phased approach. We've discussed it. We've thought through it. We decided against it. Um >> well, >> I don't think we ever decided against it. >> I think there are those who are strongly opposed to reality. I don't love it. I just want something to show. >> Yes, it will go in circles if it's voted down again. Question is, how do you get it passed? >> Right. So that >> you'll never get phase two, >> but you'll never get any of it if it gets voted down. >> So that that's my thought. Like even if you just get phase one, like let's say phase one passes, >> whatever's left, like you can work on over years to budget in like an HVAC system and all those things in smaller pieces. And it sucks to do them one at a time, but I'd rather get a substantial piece of this done in one shot than to get none of it done. We faced it with this fire station, right? Like they put forward this beautiful plan. I'm like, that's adorable. We'll still be talking about this in another 15 years unless we start making decisions. They wanted the major safety complex that would never have passed in one shot. So yeah, we're in phase one physically right now. Phase two is still down the road. So we got >> it doesn't stand a chance of passing. What does phase two here? >> So the police can comment on this first. So, um I guess a couple of things. The twotory edition can be built >> fairly independent. >> Independent other than the classroom space that we'd be losing in the portables. >> Correct. >> Right. >> So, the the only thing that >> the portables technically don't get they can be moved. >> The the part to answer your question fully, the part that >> you haven't asked a question yet, but go ahead. Well, [laughter] the part that Haramman and Harvey have mentioned is where the addition, the twotory edition and the singlestory join. That roof needs to be re-engineered and structured of the existing GMS because you're going to have a face wall there. So, you're going to have a higher snow load. So, that is the part of that roof restructuring. And while we go to replace the roof, let's look at the rest of the structure and look at that. So, it's fairly independent, but we will have to touch where it joins when we go to look at that roof. >> Mhm. >> Okay. >> Okay. Sorry, I didn't mean to interrupt. >> No, that's that's fine. Um, one of one of the conundrums we've had in passing anything is that you have the contingent who absolutely sees the a new building as too expensive, too hard to hit on the tax, you know, what you're paying on on on your tax rate. And then you have another contingent who say, "But Griffin is an absolute hole and we don't want to spend a single dime keeping something that is in terrible condition." So when I look at phase one, I'm thinking, well, the twotory edition part would get us closer to a solution and would appeal to the people who would probably would vote for the full-blown thing anyway. Um, but when you start talking about facelifts and replacement roofs and restructuring and all of that, I think those sunk costs will cause that contingent that says, "No, we don't want to put any more money into the failings." So, we're throwing good money after bad people or or the lipstick on a pink. The people who voted for a $40 million school two years ago, three years ago almost, aren't going to vote for this because they wanted reasonable school. >> They want the whole thing. >> I I I don't I don't >> Okay. >> Think that. I think people will still vote for this, right? They want something done with the school. They're not going to say like they're not if they voted for the $40 million school, they're not going to come and look at this and go, "Oh, no. We're not doing it because it's not $40 million." >> We have to flip half of the nos to yeses. or get more yeses to vote. >> And I think that goes to your point that no is not actually a no. A no is a no to the the dollar amount or to the particular bond. The no is not a no to no to improvements to GMS. Those are two different nos. >> That that's right. >> And those are the nos that we have to flip the people that were no because of the price. >> So means no. >> But you can get a part of the community to vote who has never voted before. the young kids in particular. >> But I'd be careful with that because there's both sides. Like how many of the seniors didn't actually come out? Like I'd be careful saying because you say that on one side, the other side's going to say, "Well, I'm definitely going out now." Which is great. They'll have 80% participation, which would be amazing, >> but I if you look at the demographics, >> it may not go your way. >> Many of the seniors voted for it. >> Yeah. So, so I I guess This is my initial thought >> for phase one. We can that you can always add more to it. >> I guess the question I would have on phase one is would you be comfortable with the scope should phase two not >> appear for another several years? >> Yes. >> All right. So we we we are comfortable. >> This would tie this. >> Let's see what phase two >> I was going to say. >> No, but we're saying we're like a fire station, right? >> So I Carrie Carrie, hold on. I understand it's later. It's in here. >> All right, keep going. >> Now, I just want to make sure that this number encapsulates everything you would be comfortable with. I'm good. I >> I I'm not signing up to that number. This is numbers that have been presented before. >> These all need to be validated, verified, and reups. >> I'd like to see dinner all on the table before I talk about how it tasted. >> Just one question. >> How much longer is this going to delay? We won't be able to bring this in March. >> It's a smaller scope, but >> this is already what they're doing. This is everything that Herman's already doing. I think it'd be best to see the rest of the dance presentation. >> Yes. Please keep going. >> Okay. >> And you got to get the school board to vote yes on this, too. >> That's why he's starting here. >> This This is why I'm trying to get community input. I'm trying to get the FIC which is that you know we make recommendations to the school board and I am willing I I will take all the feedback that I can and we can massage this if this is something that the FIC would like to present up to the school board. All right, phase one interim. And the reason why I have this is this gets built. Your 5060 swing spaces become swing space for phase 2 during that existing building renovation. So this answers part of the part that Harvey and Heramman brought up of you remodel, you need to create swing space. This provides you that space, >> the swing base for phase two. >> For phase two, >> y >> in the interim, you could use it as storage. You could use it as expanded spaces for special ed or how however the district sees that they want to use it >> or close the door and don't use it at all. >> Exactly. I don't recommend that, but yes. >> No, because we need to fix we need to fix the bus loops and parking and all that down there. That building needs to go to do that. >> Yeah. again the >> that's later >> and phase >> what's the difference in time between your phase one and two >> I'm getting there phase two everything else that we're trying to accomplish in this plan right so demo of the 5060 separation of the 1930s this is the remodel ex of the existing building with secure entrance replacement systems everything else there that is in the plan that we are wishing to do I am and again I'm not changing the floor plan I'm not changing anything that Brian and Dan and Haramman are all looking at. It is the same end goal. This assumptions are all cost I have increased all cost by 25% just due to multifasing. So you got to bring all the construction crews back. You got to do all of that. Um I have not I will say I have not performed an escalation analysis as to if I phase this out by X number of years the escalation that goes with that. So that number will increase. Just trying to get people thinking about it. No work is done between the end of phase one and start of phase two to get to phase two. There's, as Joe mentioned, there's ways that you can do this with we have expendable trust funds that we could use to bite off chunks of phase two to do it in the interim, but there would be eventually a larger phase 2 project to help us reach that end goal at a point down the road. Site work and landscaping is done by completed by other means. Whether this is expendable trust funds like what we're doing with the roof for CHS or not, it's the same thought process. We could take building the building maintenance and cap and capital reserve fund as well as the capital improvement fund and use it for that. It's roughly on the same order of cost as the CHA's roof. So I figured we can use the same model build it into our m our yearly plan. I have a larger contingent contingency on this again to make a pretty round number that can be adjusted up and down and look at it. I like zeros. I don't like >> this phase in particular more would concern me to have I would want a bigger contingency in this phase because this is where you're getting into the older part of the building and things are weird and >> what you don't know >> you don't know. >> Yep. >> Where the building addition it's fairly independent other than when you make the connection. >> Okay. Questions, poke holes, thoughts? Go ahead. Um, couple of things that I would like about this sort of deal. Uh, if I think in my mind, what would the people vote for? How much would they vote for if we presented it to them? What would be a number that um we'd have a reasonable a more reasonable chance of passing? And in my mind, I was saying 16 to 20 million. Now, so you're thinking about 20 million there for phase one. What happens if we pass phase one and we never get phase two done? We're we're dealing with a situation in the old part of of GMS that to me are critical system stuff that needs to be done. So with respect to the scope of phase one, I would be reluctant that we that we're not doing more to improve uh the building that we're going to have to live with. >> So the Go ahead. >> I I'm we've been doing this for a long time now and I come down to the conclusion if we don't do it right, we should do nothing. And I think we had it with that proposal to build a new two stories, do what we're going to do, fix the bus loops, take care of the septic systems. We're going to take a little bigger. We're biting off a little bigger nut, but I think people can see that it's a solution, >> right? >> And here I'm looking at 20 million on the first one, and here's 25 million. I know you don't like cents. This >> that's 45 million. That doesn't make sense to me. >> But I I also it it come. It's not I'm trying to present an area of where I'm not I can't say I'm not focusing on the total cost. I am concerned about the total cost. The problem is it's the upfront cost and the out-of- pocket cost on an annual basis of where a large contingency have mentioned the previous project was overblown. >> And Dan, >> can I interrupt one second? You spend more money to get to the same place if the town passes it. >> Yep. >> I said that up front on this. >> We've discussed this for the past two and a half years. We've discussed this plan and decided against it and went with the plan we recommended for. So >> the other thing is I would personally rather >> although the superintendent disagrees, structure your bond so the people who are living in town the next 10, 20 years pay less and the people who move in 30 years from now are paying additional. That's basically what you're doing here. Spreading out out over more time >> and you could do that with a bond. >> Well, bonds get >> but you have to go before the voters twice and sell a $20 million project and a $25 million project. I I don't I I personally would vote no for this. So I'm just going to say that if you look at it, the only way that this reduces cost on an annual basis is if you finish paying off phase one before you start phase two. >> Well, no, hold on. >> Because if you do, you did 360. >> Let me let me finish going through please. >> I want to know the timing. >> I thought you were done. Sorry. >> Okay. >> Please. >> So phase two. Any questions on proposal of phase two? Not talking about numbers, not talking about timing. >> It's an interesting approach. >> Okay. Proposed timeline. Phase 128 construction ends in 2030. We refresh and estimate the guaranteed maximum >> I understand [laughter] over the days. But if if you think so my proposal is phase two doesn't get proposed until the LMS lease payment ends or it gets proposed but we don't go for a warrant until that ends >> which is also when the higher cost for the solar panels also kicks in >> maybe and potentially but still the idea behind this is with the lease payment ending we can help offset the bond tax impact by the already known lease payment. It's not going to offset all of it, but it'll offset some of it. And then construction ends at 24 months later. >> Is that payment? >> It's 330 something,000 made in two payments over the year. >> Pain a whole lot on 25 million. That's not I was saying you can make the case going with phase one and in 10 years it'll go down because we'll finish paying off LMS but then you're asking somebody to accept $1,600 to get $50 back later because the reality is the LMS lease doesn't have that major of an effect compared to the other one. >> I understand. I'm just trying to say of how to help at that point you have the 360 plus the 400 which is still higher than the initial six something. So you're really >> with an offset from the LMS >> school. So it's >> and I'm only going to be 82. >> Yeah. Don't worry about it. >> You're talking 16 years until phase 2 is done. Yes. >> Two years. >> Yep. >> Can I go ahead? >> Just a quick clarifying question. >> The premise I I want to make sure I'm understanding. The premise of your conversation today is partly that if we if if there's a no on the allin-one kind of proposal. This is an alternative way to sell it to the to the community or version. >> We have to pick one of these versions to put on there. >> Okay. >> Yes. Because we Yeah. We can't put it on as the whole thing and then get voted no and then put it on like this. We have chosen we have >> we made a decision to go with what we made for a reason and we've spent two and a half years making that decision. >> So I I also want to be clear that the project that Peter >> not how we were going to propose that on a warrant article. And what Peter was talking about at that time was phasing it was having you design a project, you execute the project and then you can then morph all of the subsequent projects to what we need at the time. The difference here is we know the endgame, we know the end plan. So if you wanted to do smaller things in between two phases, we know what we're doing. We don't have to go redesign it. We don't we just have to go refresh it. we go contact and say go do this part. >> I guess it comes down to how much do you want to gamble >> because the reality is if we look at the last year's votes expanding coverage for the fire station most easy sell wins by one vote. >> So >> how much do you think when this originally pass put was put up recently went 60% the wrong way how much do you think the likelihood is one phase is going to pass? That's the question. That's the question. So, if you think I'm going to put it all all in and see how it rolls, that's fine. That's a risk you're willing to take. Yep. >> But everybody there might be other people in the room not willing to take that risk. >> I I I think the the the the cell for this is easy. It is a comprehensive solution for doing it all at one phase. We fix the building problems. We fix the educational issues we have with little kids running from one end of the building to the other end for OT or PT and we are we are taking all those things into account and here it is. It's not a new school. It's a renovation and it's a complete solution. >> I >> I think that is the cell. >> I I completely 100% agree with everything you guys are saying. I still think it fails, >> but I still have I I still have the notion I don't think 35 or 38 with the one-year escalation is going to pass because that is the same bond number that we went after in 24 because it was a $44 million school with a $37 million bond because we were going to get 7 million in state aid. So, we're at that number again. I don't see it passing. >> The only reason I would delay it is if Ray is right and there will be state aid that we could access in the next couple of years. >> And that's it. Lot [snorts] of >> so that this to me is a way that I have gotten projects like this to pass knowing caveats. It's going to take a lot longer. It's going to take a lot more money and it's going to cost more overall, but it is in a way in a structure that is palatable to the vast general general populace that needs to approve it. >> But your current kindergarteners will be graduated from high school, not in college by the time this will be in college. >> We have people that that are graduated college after since the last one was voted on. >> So I again I hear you. My my concern isn't to worry about my concern is to what what can we do today and then for the longevity of the district in the town and again I'm coming back to I'm with Carrie and I'm with Joe on this. I don't see 38 passing. >> It may not pass. It may not pass. >> And then what do you do >> then the past two years? >> The people who want good schools might leave Lichfield at that point in time. >> They probably won't. They probably will go to vote and to um other school districts, >> but that doesn't get rid of our problem just people leave. >> I am just trying to present an alternate strategy h of how we reach the same end game. >> I also >> I appreciate what you've done. I think you've done a great job. I think we're reversing everything we've worked on. >> I don't think so. I disagree. >> I appreciate this, Dan. I appreciate when people think of different ideas and different things and stuff like that. And believe me, I understand the potential challenge of this passing next March at a 30 something odd million dollar number, right? Like I I I don't want to make light of that in any shape or form. Like I have no idea if it will pass. Like I have to in my position to be glass half full that it's going to pass. >> But you know, rationally, right, I don't know if that's going to happen. I don't my concerns with this type of model is I've seen in a lot of other places this type of idea and we can we were literally just speaking of Hollis and this is what they tried to do and phase two hasn't passed right like >> and rather than just go once and work really hard to get that one positive vote if it's even possible like they split it up and now they can't get the second yes right like so that is a concern We also in I don't even live here but not know this enough. >> We're not in isolation. The police station has to be addressed, right? Like and they're patiently waiting for us to figure out the school. And like if we're introducing like >> a two-phase project with a timeline of a decade, when the hell is the police station getting built? like, you know, like and >> and now we're talking like three, four, five bond payments for this town at the same time. Like >> I I I don't ever seeing and maybe I'm just maybe I'm glass half empty now when I say this, phase two ever passing. >> Ever passing. And if you can't get both phases, then what's the point? >> Because phase one gets us >> more space >> more space for the educational hold on >> broken. I understand that. >> That's the problem, >> right? That is the problem. >> But that more space allows us to bite off. Let's say we don't do all of phase two and in between phase one and phase two, you can do other projects to burn down the scope of phase two. >> But we have other schools like we're seeing it with Campbell. Like we are on the preface. We are on the edge with Campbell. >> I I completely agree with everything you're saying. >> We haven't had AC in six weeks. Thank you. >> So that's that's I'm thinking about the AC as I'm thinking about this project. >> So Ray, what's what was the timeline for possibility for state aid? >> State aid. >> Well, if you look right now, the revenues are up. We're up about $183 million up right now. Uh about a hundred million of that ought to go to towards the educational trust fund. Um state aid right now, it it wasn't in the budget. We have a budget coming up this this year in January. >> Conquer took conquered slated to take like take most of it. >> Well, Conquer was in there for $48 million ahead of us, >> right? >> We're we're at there for $7 million with our project, but this would be a this would change our project, >> but part of what I've I've been trying to work on on the background and I'm going to Rich and I've talked a couple of times. We need to figure a better way for state aid. They don't want to start building any more schools because of the declining enrollment. We went from 26,000 students. We're down to 156,000 in the state and falling. So, they're talking about ways to restructure it for remodeling projects and stuff. Again, the whole application project process for state aid is ridiculous at DOE. So, >> and what percentage could be applied? So, I'm thinking if we went phase one and we could get, you know, seven 10 million all of a sudden phase one is a more economically viable option. Do we have to wait two three years for that? >> No, I would say >> better than 18 or 16 overall. >> 100% agree >> and and I would say that it you wouldn't want to be doing a phase project with state a phase one. >> They're going to want a solution. No, phase one, if I knew that I had in, you know, on the the horizon, say in three years, I had access to, you know, whatever percentage, all of a sudden phase one's a lot nicer looking. Yeah. >> And even if I had to wait three years, I'm still done way ahead of the end date projected phase. >> Respectfully, I don't think you can count on any state. And I appreciate the work you guys. >> I agree with you. >> Well, we're we're still trying. In principle, I always feel that you should not approve a product you're not willing to pay for yourself. That said, if there's a chance that the application process is going to open in a year or two, why wouldn't I wait a year or two? >> Because >> well, for us, >> we don't know what's in a year or two. >> A year or two, you might have a yes. >> But for us to even even if by some miracle in a year or two, state aid became available to schools again. And again, I want to appreciate the work that our reps are doing on this because I know this is this is something you guys are working on. >> It's it's nothing against that. But even if that happens, you have to rewrite all the rules for us to benefit from it. >> So it's not just the money being available like we're in line. Yes, we are third in line in state aid for a great up for a new building. This is not a new building. By the current rules, we fall all the way back to the end of the line. >> Like which >> I don't know who else is going to jump in line if if we're state aid comes back available >> unless you go back to your new building idea. >> I I don't think a new build we've we've vetted the new building thing as this committee as as a group or whatever. This community is not going to support a new building. Like whatever people's personal feelings are and like I'll say it on the record, I would love to have a brand new elementary school, right? Like >> you shot that one with past board decisions. >> Maybe. So >> I think past decisions, I'm not laying it at your feet. >> No, no. I No, I know that. But like if you were just asking me the person like I I would love like like as a superintendent I would love to be part of the design of a new school. That's lovely. I have an interest in architecture. That stuff would be great. But like rational side of me says this community is never supporting a new building. If it if they would if they were they would have it hasn't happened. >> The first got presented. >> Not the last time. No time before that. >> No. I think there [clears throat] were choices that were made and timelines that were twisted that could have allowed you to get >> Well, there's there's there's some other problems as we work through the issues at the state level. One of them is that they the they are spending most of the money that they get that gets put into the $50 million state aid bucket on the what they call the tail. And this is all the all the >> the bonds and loans that they're paying down for all these other districts. But the tail is dying. You know, we have other problems like New Market went and decided they were going to do a project just like this. They did it all on their own while there was moratorium on building for state aid. Now they're stuck with the big bill and they keep trying to get state aid rewritten so that they can get their money now even though they broke the rules back then. So as we progress forward, >> forgiveness later, don't you? >> Huh? [laughter] >> It's easier to ask for forgiveness, right? >> Yeah. But now you have to tell the voters, well, we waited a year or two. We could have had it for less money. >> I don't want to wait a year or two. I want to get the project done, get this behind us and move on. Like the miracle you got the savings only the actual costs are escalating at the same time, right? Like >> I went I went took my kids on an adventure today. We came back and gas is 14 cents higher than it was this morning. like you cannot control the way people are going to think about money in six, nine months from now because you can't control so much. So I don't know. I think I would sort of vote for not the phased approach and I and present it all in allin one. >> I I 100% agree. I am on board with an all-in. I am just trying to provide a proposed different strategy >> due to >> I have my concerns about the or I I there is a challenge with the all end. I don't know if we're going to surmount that challenge. >> Ultimately, it's the school board's decision. >> Absolutely. >> I see just flexibility with that phase approach trailer. get the first piece of it which is much more palatable out of the gate and even if you never get the second phase and I understand it's a budgeting gymnastics that will have to be done but you can budget for projects down the road and start taking it in smaller pieces and >> cut up that phase two and say all right this year we're going to budget for the we're going to budget for the HVAC and we're going to build that into our budget to do the HVAC and then we're going to budget into our into mud it 5 years from now to demo the back side of the 50s building. >> You realize what you're saying is exactly what got us right to this right now. >> No, because we didn't have >> we budget money in there for our maintenance. >> It doesn't get done. >> They find something else that needed to be done before they did the maintenance and the money's gone. This is budgeting things in like that when you got a bottom line budget doesn't work very well. You can spend the money on anything you want. Doesn't have to be spent on that. it can be spent on this >> also >> and that is exactly what got us here >> also the difference of I don't know if I would necessarily do bottom put it in the general fund budget I would do it more in the trust funds >> right >> that's the only way you can hope that it will happen that way >> that that's what I >> we should have done way back >> that way back >> right >> so again >> it was not meant to change anything that we're currently going forward it was purely a different way of how to look at this consider and I appreciate it because you're recognizing based on the last vote which was super majority the wrong way it's there is a risk >> it's a major challenge >> it is a huge risk >> you want us to vote on whether or not to recommend this >> no I don't think it's in the place we we can't we can't get to that unless we >> so a couple other things it tear apart again I appreciate I appreciate you just putting yourself out there Dan because like we're just pouring it Right. >> It's but this is thick skin >> to to get >> to hone this out and hammer this out, right? If this was >> people were going to ask this anyway, so it's not a bad conversation to have, >> but like if we're not demoing the 60s wing for lack of a for that. I think that's what we call it, right? >> Like >> we need the sunk cost dollar because that has to be figured into that big number because right now the 30s building is a sunk cost. We are heating that building. We are keeping it in some sort of working condition. >> Could be a beautiful SAOU office. >> It could be, but like right now it's storage, but it has to be like >> like just use heat. It has to be heated right now because all the heating is coming out of it. Right. So now are we passing two chunks of that building that like are not in use just to heat the building? Like are we going to heat the 30s? We're going to heat the 60s and no one's actually in these parts of the building. And like one of the the the huge issue with the 60s section is the envelope. Yeah. >> And unless we tie up that envelope, all the problems that that is presenting us, we don't go away and they're still there. >> So they So where the heating is all forced hot water to the rooms that are not used, you just close the valves. The pipes are still going to get hot, sure, but the radiators aren't. But and like this is not my expertise and my concern is like we don't do that for the 30s building >> because we can't because the main because the main water line runs through it >> because it's like this maze of right. Yeah. >> Right. No. >> And think it's not like so how else is that water get to the rest of the buildings? >> It's well pipes running through the 60s. >> I have a different argument to offer. >> The last time this all went to bond, we had an entirely different administration. one that the people trusted very little that were make >> that's true >> very little is that >> they did not trust who was in place in the administration and as I've went on record saying this before about this project and how well it's been vetted I think the view of what the administration is than the school board is different today than it was when that went to bond >> it's ultimately going to come down to dollars people were screaming with their last assessment in tax bill >> oh the last assessment yeah So now you're we're going to whack him with another law. >> The tax bill is never going down. You have to vote. >> It could if we were never the right. So >> I mean this no matter what nothing I mean 20 million might not pass right >> versus skyrocketing are two different things. There are people in town who saw what double taxes. Mine didn't go up because I'm right in that map where my overall my assessment stayed relatively the same to everybody else, but there are people in town in the mobile home park over on 3A that their taxes doubled. >> Can they are so realistically and I don't know I'm just assuming that there are people who are in those places who literally cannot absorb that. There are those whose taxes went up and you're like, "Ah, that's a car payment. Not a problem." But the people who can't absorb it, now you're gonna whack them for another. So those are the ones you're gonna say who are going to say no. So they always go up. Yes. But it doesn't have to go up this much. So the question is, are you going to have enough yeses? And I still say you're not. >> We may not, but we have to at least try. And do >> That's what we did last time. We tried and we got clobbered. >> You You had a $43 million. >> This isn't that much farther off. >> No. No. We had a $37 million bond. >> Let's just say I appreciate your optimism. >> This This is the exact same bond. It's the exact same >> that and >> and tax bills have gone up since then, >> right? >> So I I think you have if you would like to climb that hill, more power to you, but I think it's going to be a rocky slide down. >> I'll help climb the hill. Like I again I will not stand in the way. I parachute for like I I will be I I'm all in on the all-in approach. I just don't think it's going to go. That's why I have been working on this, put this together. >> And then you got the bigger question. What do you do after that? >> Exactly. >> I think you have to have a much if let's play that up and and again I appreciate this work. I I I I do not support this at this exact second. Maybe persuaded. Just saw it for the first time 20 minutes ago. So like absorbing like anyone else. But like if you were just listen to me first everybody. I'm not saying this how anything's going to play out. If you bring the $35 million project in March 27 and it fails. And let's let's for just just hear me out. Argument's sake. It's a close closer, right? Like whatever the case may be. And 55% said yes and 45% no. So you're not at the 60 threshold, but you're within shouting distance, right? Again, a million things can change between now and then, but just I my initial gut reaction would be like, try it a second time. Can you make up that 5%. You made up a huge percent from the new building to this point. Can you make up the last five? You may not. You may never be able to make that 5% up. And I would go back to it again, right? In March 28, if it fails two years in a row in March 28, you have to have a real gut check conversation about education in this town. like a real gut check conversation. And I'm not even talking about reconfiguring your schools. I'm talking about outsourcing your education to other places. That's where you are as a community. Like that's that's it. And if that's the choice you want to make, and I'm still superintendent at that time because it's a community choice, I will help do the best I can to facilitate that for you. But like that's what's on the table here. Like that's the choice you're at. That that is like and you know, education is evolving at warp speed in this in this state not at the it is and it isn't at the same time but there's a lot of stuff happening from a legislative standpoint that can change the picture a lot between now and March 28 we're talking about right so I say this now and maybe some things change and that's not the case but that's what you're facing right like this isn't just like we got to fix some parts of the high school you're like kind of direction of education in this town is on the line with this right and I'm my role is to guide you on that stuff and to help the community with what they want to do with their education, advise you what I think the best ideas are for that thing. But it's ultimately, you know, the board's choice and by proxy the community's choice to do all that type of stuff. But that's what we're talking about here. Like it it so that if this gets voted no, that's where we're at. >> I I agree. >> Go ahead. >> How how publicly do you say those things? I mean, I know this >> just said, [laughter] >> it doesn't get more public than this. I would put that on your video >> cuz like [laughter] that was impactful and I I kind of as a parent of a child with AMS and LMS I can feel that. Um I can feel that and I think that's interesting to hear you say it out loud and it is impactful to hear you say it out loud to articulate what the person we have put in charge of our school system sees as on the line in these conversations. So, I don't know what you take from that, but I will say that I I think that um I would encourage you to say that again. >> I have a feeling I will say some version of that a lot in the next six months. >> I think you should >> nine months. >> Put it on the video. Put it out now. >> If we do a video, >> if we do, >> okay, >> so you can't use scare tactics to get there. But >> it does make sense. >> It's not scare tactics. And I'm not trying to scare you because there are plenty of communities that outsource their education to other towns. Like that's kind of what some people like put it in a video. Some people would, you know, may or may not perceive that well. >> You got to then figure out what's best for your town at that point, right? Like you know the convenient outsourcing that you see most frequently in the state is high school students, right? Like that is the most frequent version of that that you see. That is not the only version that is out there, >> right? went through that whole evolution already once happened to my son's class. >> You're gonna and like we don't know. I'm not here to take any stance on open enrollment right now. No one think I'm >> No, but I'm saying I have worked so hard to take zero stance on that issue for like years at this point because because I'm just a period. Thank you. Um but like let's say that like we just don't know what that's going to look like and that is a the discussion 100% is going to continue. The end result we just don't know what it's going to look like and it could have a drastic effect or no effect or a little effect or a big we just don't know. We don't know what the effect of that type of thing is going to have on school districts, right? We don't know what that specifically that's going to have on Lichfield. You know, I can go talk about tons of different options of what that could look like, but we don't know. That could change how towns approach outsourcing education that the long-term model that has been putting your high school kids, it's age kids into other high schools, right? But if open enrollment is going to be part of the calculus, does that change all of that stuff? You just don't know, right? So, like that's why I say like you don't know where this is headed by March 28. So much can change in the next 27 months. Like so much, right? But like this is the type of stuff people got to recognize when we're talking about talking about this school project. Like it's not just like fixing a roof, right? Like there is a lot that that is part of the larger picture here of this type of thing. And again, I will I obviously there's >> like in my role I will my job is to guide and help and advocate for people what I think as an educational expert is best, right? But ultimately my goal is to answer the community and what the community wants to do, right? Like that's ultimately what it comes down to, right? So like the community's got to figure out what they want to do here. >> I would just This is me as me taxpayer, not [clears throat] a budget committee members. I don't want to get any accusations there. And I I appreciate your your passion for it, but I can tell you when I hear that, I'm like, well, overall enrollment in town is down. We've managed to sustain more students in the district than we currently have enrolled. Why would we need to outsource? So the question so I'm just telling you to me without much things that comes across as we trying to manipulate me into a vote. So I would be careful of that. I'm just saying as a voter I would be care I app like I said I can see the passion. I can hear it but I'm also grew up in New Yorker and highly cynical. So, what I'm going to say is GMS has held far more students than are currently housed within it. And now you're telling me as a voter that if I don't pass a new more space, I can't house less fewer students overall. It doesn't make sense logically. >> The space like and like we will do a lot of roll out for this over the next like whatever. It's not about the space. It is the condition of the building. >> Then we should rearrange phase one that we don't it's not about case, then do we really need to do the addition first? >> We're not. So, like I want to kind of >> demoing the 50s building >> like >> a larger conversation. I don't want to get like >> over there >> so into all of this right this second, but like >> I know it's an addition by definition of an addition because we're physically adding on to the building, >> but we have to think of it as a replacement. You're replacing the 60s wings with the two floor wings >> portable clusters way beyond their end of >> you're not gaining a ton of space between those useful >> like right now the like the like getting rid of the 60 wings. I double checked this this today cuz I thought I would assumed it would come up tonight and it is >> the demoing of the 60 wings and the and the removing of the portables. You're getting rid of 19 classrooms for all some of it in reading and special ed and all this stuff. It's 19 classrooms, learning spaces, however you want to define that. >> The addition depending on how you use the flex space is 16 to 20 or excuse me, 18 to 20 learning spaces. That's a replacement 19 to 19. That's what you're doing, right? Like we're not and I know we have to call it an addition, right? Like I get it because we're physically adding on to the building. It's not simply renovating, but it is a replacement. You're replacing this section for that section because the section you're replacing is not repairable anymore. Like it's it's just not it's just not repairable anymore. You have to start over. It is over 65 years old. Like it has to be. >> But the other things that you're doing there >> need to be the things that we need to focus on. >> We're going to fix the bus loop. We're going to fix the septic system. Um all that is at its life. Its end of life now. We're going to replace those pumps and all that >> that stuff because we're moving them. We're going to get the the traffic straightened out off of 3A. I mean, there's a lot of safety concerns like the kid bolting out that dorm being on 3A. I mean, there's a lot of safety concerns that are all housed within this whole project. And just like about this the the like reducing enrollment, like that's a real thing, too. Like I don't want to discount any of that, but like this is why I said like we don't exactly know how all this stuff in education is going to play out the next couple years, right? Because what happened a lot this past spring, which Dan said hasn't really ever happened before, is it him giving tours to incoming kindergarten families because their thinking is open enrollment is coming and if I don't want my kid in this building, I'm going to send them to a different school, >> right? So like that is real like that idea that like and I'm I'm not here to to put judgment on school choice. That's not what I'm doing. I'm talking about the tangible issue about like we can face if we don't address this building, we're going to lose kids. We're going to lose kids whether they move out of town or they utilize other ways to go to other schools. And if that's the right thing for the kid as like just an advocate of students, great, right? Sorry. Like that's just the way it is. Like students need to do what's best for students. Like so like I'm like morally fine with that. But like my concern is like that doesn't make it cheaper or better for us, right? Like there's like >> still got a building we got to address and like we're not going to have like this savings if we have less kids because we still have the building that we have to heat that we have to run electricity for that we have to teach classes on and stuff like that. >> That's not prepared. >> That's not bring one issue back to your point of those who may have a little more than others in town. The people who have a little more in town probably have enough and enough parents or they could hire someone to bust them to a private school half an hour away. The people who have less, who may have one car if they're lucky, whose both parents work different shifts potentially, they don't have the means or the ability sometimes to get these kids to other towns or other private schools. They just don't. And the kids that have the means are going to benefit more from open enrollment in my opinion. >> It's not the shift we're seeing nationwide, though. and and here we have >> but the people without transportation >> people want school choice it it >> but you have to get them there and you have to >> I would tell you based on the school I was at because we had despite what people want to say there is a lot of low-income housing people there and they still got there because parents prioritize education >> so I would say Nashville does have more options >> did not come from Nashville I was in over there there's kids from Brooklyn there's kids from all over the So where where >> yeah bring it back to facilities >> the what ifal decisions the ultimately our goal is to move the this project forward in some aspect. Yep. >> And does a phase one one phase $35 million project only moves this forward if it's a yes. Can we get that yes? I would contend no. But it's also one I'm a non- voting member. Two it's up to the school board. And three, I'm glad I'm not the one who has to make the decision because I'm not a betting person. But the reality is I don't think it passes. So what's the plan? Which is why I appreciate that you looked at a phase approach because it could move sections of it forward potentially, but then you're in the group has to accept and decide as a group that realistically that's the only way to move it forward. And I think that right now there's there's enough people who aren't willing to or do not wish to make that decision. >> I I 100% agree. It was meant to present. I'm not expecting a vote. I'm not expecting a recommendation to come out of this tonight. It was purely to present this. >> I love the conversation. >> So, think about it. >> Carrie, don't underestimate the fact that you're a community leader and people do listen to you. Well, I can tell again I just I hear from a lot of people who got hit by those taxes and to see people who are actively considering having to relocate as it is based on taxes to ask them to cough up another over $1,000 for the next 30 years. I I just on top of all the other stuff we're going to hit them with and we can discuss my opinions on whether or not we can absorb some of that in existing school budget based on past budgets. But the reality is it's a big hit and what it again it's a yes there's a need. How do we get some of that addressed? That's the goal. That's why then again that's why I'm asking about state aid because if it's a matter of delaying it two years to have the option to tap into >> I don't know I don't know that we'll have that in two years but I >> I can only hope that there might be a way with some if you take like new market that did it in a rears they did it during the moratorum >> um that maybe at some point we could >> help make them >> pass a pass a bill and help them and help us. >> All right. TW about the end of the year. >> Okay. All right. Moving on to the end of the year encumbrances. >> We spent it. >> I had questions on this one. >> So, I was not at the June 30 school board meeting when they decided this. I was enjoying vacation with my family, but this is the output that I received from Mr. Cutter at the time. um just to know where it went to. >> So I'm curious because >> I was on the phone >> because when we left here the the recommendation was to vote to focus on safety issues, AEDs, the nurse had to have the new sink there. There was uh because I looked it up before I got here. There was um burglary system notification. We had a list of safety priorities and yet we went with steam cleaning auditorium seating painting. >> I voted no on that by the way. >> And some other stuff. So I'm curious as to how and why. And again, I'm gonna ask here because you know the recommendation on this committee was one thing and I can guarantee you it's going to come up again in August at the budget committee meeting because preview of the questions I'm gonna be asking is how and why would we prioritize steam cleaning seats over stated safety issues? Can I just make one comment that's like a paragraph long that goes long. >> Okay. >> I was very disappointed watching the school board discussion about allocating end ofear fund balances. There was no reference to the work of recommendation the FIC committee um did the meeting where we were supposed to finalize those recommendation was cancelled and there are still no full list of prioritized projects. Neither of the FC members were present for the actual meeting although one member voted by text to the school board chair and I appreciate all they did to try to do it remotely but they were still unable to participate in the actual discussion. I understand the board is not obligated to act on our recommendations, but failing to even mention them is disappointing and sends a clear message that our time and expertise are not valued. If our recommendations not desired or discussed, it will become harder and harder to find people willing to serve on the thick or similar committees. So I will go back that when I was asked as a schoolboard member to look at prioritizations for end ofear encumbrances for the list that we worked off. I added a column for the FIC recommendations as noted that we made here. >> Yeah. >> So that was presented to the school board as to what our recommendations were. So, some of them were in there like the fire curtain as well as uh I believe yes, the fire curtain did get in there. >> Yep. >> And then we also looked at some of the other recommendations we had which were not necessarily safety. >> They were listed as nice to habs right on your thing. So again, when we're looking at AES, >> we bought the AES. >> All right. So you got those. Um, >> we had to buy them by June 1st because there was pricing connected to it. >> All right. So, where did the funds come from? If not the end of year, >> we had to transfer money to accounts to do. >> I mean, this is it's a bottom line budget. And this is why it's hard to budget and this is why we have to have the flexibility to pivot because if we're going to buy stuff at reasonable prices like we need to act when stuff happens >> like and it's an AED thing. >> No, but it was recommended. It was recommended for AED end of year conferences. So, what I'm going to say it's going to come down to, and heads up again, I try not to blind inside anybody at budget committee meetings, but when you're looking at 1.4 4 million underspend.