Swanzey Select Board Meeting August 26th, 2026
The Swanzey Select Board met on August 26, 2026, to discuss the West Swanzey pump station design. Representatives from Underwood Engineers presented options for converting the wastewater treatment facility into a pump station and redirecting flow to Keene. The town received preliminary funding approval through the Clean Water State Revolving Loan Fund, with the project initially listed for design phase funding of approximately $1.6 million out of a total estimated cost exceeding $19 million. The Board reviewed four potential alignment options (A, A1, B, and B1) that combine pressurized force main and gravity main systems. The board scheduled a meeting for September 11th at 11:00 a.m. with Joe to determine plans for the second phase of town hall renovation using any remaining funds from the staircase project. A board member requested reimbursement for $135 spent on 50 chair covers for town hall events; the Board required the submission of a requisition form and receipts for review.
You are watching a Fact TV presentation of the town of Swansea. >> [music] >> Heat. Heat. Heat. Heat. [music] >> Heat. Hey, Heat. >> Hey. Hey. Hey. Heat. [music] Heat. All right. Okay. Then we'll start. Hi everybody. So I guess we'll open the meeting officially. It's 4:30. Um this is going to be a public meeting on the West Swansea pump station design development. Would I say that right, Terry? Right. >> Okay. Maybe we should start off with just a quick introduction so everybody knows each other. We This is the select board here. >> Jay Ward, >> Bill Welker, >> Jimmy Chesta, Mark Leville, >> and we have Sue over here is the minute does a fine job. And who do we have here? >> Terry Dearis with Underwood Engineers. >> Yep. >> Uh Ryan with Underwood Engineers. >> And we >> and Sarah Rapture. >> And you guys are Okay. All right. So, we'll give you the floor there, Terry, and you can talk a little about what's going on with the engineering part of this. Thank you. >> Great. We uh we appreciate it. Um looking forward to this project. It's a carry on from the wastewater treatment facility planning study which was completed in May of 2026 uh earlier this year. Uh you might remember that that was a deesf funded planning study that looked at kind of the condition of your existing wastewater treatment facility and whether or not there was benefit to an upgrade of that plant to meet future permit limits. Um one of the alternatives that were reviewed were converting that pump sorry the existing lagoon treatment system into a pump station and redirecting that to the city of ultimately to the city of Keen for treatment. So as a result of that study um we brought our recommendation forward in the May time frame or it was a little bit before May but the result of that was that it was much more much more cost effective to convert it to a pump station and redirect your flows to Keen. Um, following on with that, there was some discussion back and forth with the select board and the water and sewer committee ultimately um agreed with the approach and I think the select board in the June time period uh recommended moving forward with the pump station approach. So following from that there was um you know this this project that we have now is to further develop the engineering side of this concept. There were some comments that came out of the study from the state and they said, "Hey, there there might be some other other options here in terms of alignments." Joe had been looking at some different alignments. I think the select board had some ideas on different alignments. So, one of the parts of this particular effort is really to look at those other alternatives. Um, and what you get from those is essentially is there a lesser cost approach or is there a better approach? So, we'll talk about those alignments this evening. Um, separately to the engineering side, the town submitted for a pre-application to the clean water state revolving loan fund. So, we refer to that a lot of times as CWSRF and the state um once all those applications are received identifies and short lists projects that will potentially ref receive funding. that happened in July and um and was on and this project was on the list for a little over $1.6 million. So that is not the total cost of the project. The the project cost as a whole was over $19 million. That $ 1.6 million would cover the design phase of the work. So that happened um or is ongoing I should say. They submit an initial intended or project priority list that goes through a public process and then it gets finalized and >> it is final now. >> It is final. Yes. >> Okay. Thank you sir. >> So that is final um and it is still on the list. So right now uh I guess just on on this slide just at the bottom is the the meeting tonight um to kind of kick this off at least at this level get some input and run through the proposed alignments and what we have to date. And if I could just add to that too, just to refresh your memory, that the town had some ideas about the different alignments. And the reason why we're looking at several more of them is because the requirements that would uh potentially eliminate some funding if we didn't pursue other cost effective options. So that's why there are four options that we are looking at and it's not narrowed down to less. as far as the scope of work for this particular um contract. So it's we referred to as design development um it's kind of a middle ground between the concepts that we looked at and then we're going to we're going to look at these additional concepts and then we're going to develop the recommended concept further. So you get somewhere between uh conceptual design and a preliminary design in this effort and as as Joe mentioned it's critical to the the funding side of things as well. So I I won't go through the four different options in detail now. Ryan's going to actually walk through those in schematic format in a moment. Um but after we go through and identify the specific routes, the conditions associated with those routes, you know, the the alignment, the um different infrastructure they have to put in place, whether there's more than one pump station or not, areas where you might have to directionally drill to go underneath rivers, uh areas where there might be rock, you know, we have to factor all those items into the proposed costs, the capital costs. And we're going to essentially develop a a comparative cost that includes capital operation and maintenance and then a full life cycle cost. So that allows you to have a nice comparative estimate with these four different concepts. Um we'll carry on the conversations with Keen. You might recall the option that was presented in the planning study uh discharge to the Keen collection system up by market basket on route 10. the section from that point out to 101 had to be based on our conversations at that time had to be upgraded. So there was a significant cost included in there for that that effort. You'll see in the proposed alignments some of those we have two that go in that direction, other two go a different direction, different complexities, but all those will be factored in. But regardless, we'll carry on the conversations with the city just to confirm capacity needs. Um and then at the end of this first set, we'll have a recommended conveyance route which will get further developed um into more of a closer to a preliminary design level for the recommended version. [snorts] So in that preliminary design kind of look of the recommended version, we're going to be looking at things like the high and low points because you need certain infrastructure for a sewer force main at those points. We'll be looking at how we construct this in a way that allows the hydraulics to work for the pump station. This is a very long force man, so there's going to be a lot of consideration for trying to stay flat underneath lower high points that you can avoid, you know, so deeper excavation along different points. Um, as I mentioned, there's a couple alignments that have river crossings, so it's going to require likely directional drilling and some infrastructure on either side of it. Um, most of these routes have different types of gravity collection system within it. So, you're transitioning between force main, which is pressure pipe from the pump to a gravity back to a force main. um and that that can pres present some pros and cons because generally you can connect to those areas of gravity. So there might be some benefits to that. Uh odor control will be a consideration and a cost that we we look at for these for this uh alignment. And then there there may be other things that we don't yet know uh that that we'll have to uh consider and can't necessarily identify at this time. And then in addition, so that a lot of that focus that I've talked about to date is all about the the force main routing from the pump station up, but we still have to look at the pump station. So in the in this phase, uh this preliminary design development phase, we'll advance the work at the treatment plant, which would be the conversion to the pump station. Um, you know, we'll be talking about how we deal with rags and control of those types of things up front as well as the pump station layout itself and then how to accommodate the infrastructure for the surge protection for that type of system. So that'll get incorporated into this this this version. Next slide please. And then um we we have some other components to this scope of work. The second one is uh or task two rather is some subsurface geotechnical work to if if we know that there are areas that might have rock you know that that is something that will start to twist c you know we'll modify the cost dramatically. So we want to be able to identify that. So we do have um a set aside to bring out a driller if we want to on certain routes to make sure that we are making our best estimate of the cost at the conceptual level. So that's what task two is. And lastly, task three is just to support the town for um any kind of funding assistance moving forward, including the SRF application later on um next year. So, with that, I'm going to I'm going to pass it off to Ryan and ask him to walk through uh kind of this overview and all the individual routes and then I'll I'll finish up. >> All right. Yeah. Thank you, Derry. Uh so, what we're looking at here is uh the overview show representing all four routes. So we uh named them route A, A1, and B and B1. So we kind of broke them up that way. So you can see the A routes are shown in red. The B routes are shown in purple or pink there. Um, so just to kind of get a sense on how they relate to each other and you know how the A routes relate and how the B routes relate and we looked at some conceptual align you know with these conceptual alignments we utilized uh lidar which is uh detailed topographic information as well as procured you know all you know online a you know all available information online, you know, such as GIS. So, was we did it as as a desktop analysis and uh so as you can see, they all start at the new pump station on Denman Thompson Highway down there to the south and uh we can start with uh the A routes on the next slide there. So, this is option A. This was previously evaluated as part of the uh the the wastewater the overall uh wastewater plan uh issued in May of 26. So this was the concept used for that evaluation. And uh as you can see here for for all four of these options as Terry mentioned it's a it's somewhat of a mix of pressurized force main and gravity main. So on all of these, the pressurized force main is shown in red, the gravity main is shown in orange. Uh so for the section of red, um you know, it starts on the left hand side at the uh wastewater treatment facility. Um the majority of it you'll see is you know is is along route 10. um in the very um beginning part as as we approach Route 10, there is an existing uh baseball field and it looks like there's an easement that that would be um potentially utilized, you know, to uh to go cross country through there and then um where we meet up with Route 10 on the uh left hand side there. So, so that first stretch of Route 10 uh moving eastward or northward is uh generally uphill. There's a high point that's pretty significant. Uh there's two high points. The latter one is is more significant. And then from there, it's a it's a it's a significant downhill um as shown in that orange section. So, at the base of that, you know, we're at the bottom of that downhill, we'll need an intermediate pump station to get it back up to connect to the existing, uh, Keen system there. So, um, so that, you know, that section of gravity main would potentially allow for new or it would allow for easier service connections in that in that general vicinity. Um and as you know as as Terry mentioned earlier the the the downstream capacity is also a key consideration in uh option A uh ensuring that you know the connection point and the downstream sewer infrastructure uh can accommodate you know these additional flows this connection here. Um so overall in and for the stretch of uh route 10 the intent is to stay off the pavement as much as practically possible. Uh and in this case on route 10 it seems feasible um for a good majority of it um given the rightway width. Um so potentially less uh less pavement work there. Um and then if we go to the next slide, uh it's a variation of a next one is A1. Oh yeah, >> just to add to that too, just to reiterate, so that that ground gravity name would allow for collection. So you could essentially add more collection system, base hill, the industrial park. So you can tie into that gravity section of the brown. You obviously can't tie into the forest man or the red, but that area would allow for a little build out in that area. And then just the one thing to reiterate that she discussed is coming out of the plant. It's not depicted on this map, but we have a right away where the >> Yes. >> collection system runs in between Brownfield and the residency. So we would not be going out South Winchester and West Street. The force main would be going directly out to Route 10 between Brownfield. So we wouldn't have to touch the roads in that area. That's not >> where it goes from force to gravity. The first part of it, is there a building needed there to to transfer the the force to the gravity? You I understand there's a pump on the other end, right? To get the force back going, right? But how does it connect from force to gravity? Does is there a structures there? Is there going to be no pump house, right? How does that work? Yeah, just um at the end of the the forest man is a will be probably an 8 or 10 inch diameter pipe. Um and then it connects right into a sewer manhole >> and it just dumps and then it flows >> then it flows downhill. Yep. >> So there's so there's one pump station down toward the end right at the end of the cavity, right? And there's is there another pump up further? Is there another pump station? >> There's a new pump station at the treatment plant. >> Yeah. So go from the treatment to the gravity with nothing. >> Yep. So the treatment goes uh pumps up to that highest point. So the second the circle in the furthest right there >> then goes into the gravity will flow downhill and then there'll be another pump station and then you have another force main and then it repeats goes to the keen collection system by market basket. >> Got it. Um Joe, just before you go to that one, >> just wanted to point out. >> So as you look at this next route, what's important is see how there's two high points there. >> The one that's closest to the on the treatment plant side in this next version, we're going to go around it. So that that's a benefit possibly. you know, we have to look at some of the hydraulics, but you'll see uh for the next route that there are some, you know, >> so when you say high points changes >> that the cost of it, it's going to be more costly in the high points cuz we got to go down deeper with the line or we have to push harder. Do we have to have pump stations before the high point? Where is what does the high point mean in in building this whole thing? >> Sure. >> How does it affect us when it goes high point when we're force man is what I'm trying to get to. Yeah. So with a pump system that the the challenge with the high points is it's an area where it collects air and you have to be able to release the air. >> So you end up with two things, right? So if you have two high points and a low point in the middle, you have to have an air release valve at the high point, you have to have a drain at the low point so you can do maintenance on that system. So now it's not a huge deal, but air relief valves are are a maintenance item. And in your in this particular case because of the distance of this force mane it becomes a very important maintenance item like you don't want them to fail >> uh because then you have surge issues and things of things of that nature. So we like to avoid high points as best we can. Um and then the secondary point is a a high point will determine your overall hydraulic condition that you have to pump against. So if it's a really high point, that's a a bigger deal than if it's a lower high point in terms of elevation relative to the the pump station. So and there is a big difference here between the A routes and the B routes in terms of the the high points as a relative elevation. >> Those two high points are the same elevation. >> Those ones are generally about the same. Yes. >> Okay. >> Uh yeah, good good questions. Thanks for uh clarifying there. So this is uh we moved on to option A1. So as you can see it it does a detour around that stretch of Route 10 where that uh first high point was shown. It goes down a Sawyer's crossing and then uh moving to the right is a currently a class 6 road. Uh it was the old Route 10. Um, so we'd be traversing through there for a a good portion of that that force main and then it when it rejoins route 10, it follows the the same, you know, the same path as option A um transitions back to the gravity to the intermediate pump station and then um into the Keen system. Uh so this option yeah the benefit is the high point is eliminated. Um the um and you stay out of route 10 for longer so less um you know less less construction you know um considerations and that class 6 road is you know a dirt road. looks like the restoration would be um minimal compared to restoring, you know, a a DOT rightway. And uh it does add some length. It adds about um 1,900 almost 2,000 linear feet. Um but you know, it's it's part of the you know, weighing the pros and cons of each. >> And that goes through the Yale Forest. >> It's still over town. We have to do >> Yes, it does. We have to do some research on it because the state tells me that it's more than likely when that road was discontinued it was given back to the town and then the question will be if it's record anywhere the town gave it to Gail Forest or whoever owned that land then it may not be recorded but the state tells me that when they did discontinue roads it goes back to the town. So there needs to be some work on who owns it and if it is the towns or if y forest owns it would they be interested in giving us an ement >> on the soy crossing part how does that is that where frog places >> would so would that go down that road and then cut over how far down does it go I can't really tell from here does it go >> additional ft offline I got approximately >> yeah Okay. >> Yeah. All Yeah. So, those are the 2A options. As you can see, they're they're they're very similar to each other. Um they're they're um largely follow that that route 10 corridor. Um and then we'll we can move on to the B options here. Um so so B takes a different path out of the uh treatment plant where the new pump station will be. Um it goes the opposite way on Denim Thompson Road and generally follows the Eaton Road corridor uh for you know the first you know half of it roughly. Um, this one, you know, as we previously kind of talked about the high and low points, this one has quite a bit of variation with high and low points. They're not as extreme as the A options were. Um, but to maintain, you know, avoid high points, perhaps we need deeper excavation in certain areas. uh the Eaton Road corridor. Um you know is uh one consideration is the restoration. You know there it looks like we would be within the paved roadway for a good majority of it. Um however it there doesn't appear to be too many conflicts uh necessarily. There are a handful of uh drainage crossings particularly in the very there's two major ones here um which would require directional drill. Uh so they are in the very beginning um it uh it's a pretty significant river crossing along uh Denim Thompson Road right right outside of the treatment facility. Um, and then the second one is uh further down. We'll we'll we'll get to that as we continue on here. Um, it's it's right after the uh the orange which represents gravity main. So, similar to the A options where you know pumps uphill to a high point and then where where gravity where topography allows will gravity flow for as long as we can. And uh kind of the same concept here for B. That orange is a is a stretch of you know uh downhill where we can gravity flow down to that next um next crossing there. And uh again that gravity flow allows um you know for connections and uh one you know one consideration is it passes you know those school zone areas which potentially will provide a connection benefit uh to those facilities. And um and then yeah at the crossing there uh the second directional drill river crossing uh it uh it will need to be pumped back up. So therefore another intermediate pump station similar to the A options um until it keeps you know advancing you know northeast until it connects to uh the existing gravity system there in Swansea on route 32. Um it'll connect to the there's an upstream manhole there which is uh which is where that red line touches the uh green line. The green line represents the existing uh gravity sewer and uh so it'll it'll physically connect there but the flow will um will be directed towards the existing route 32 pump station. And one of the uh variables of of this option is evaluating that route 32 pump station in terms of capacity for uh current capacity, future growth capacity, you know, um evaluating like current metrics. Uh there's a lot of information, but it needs to be kind of sorted through to um make sure it's, you know, this meets the intent of that of that pump station, that existing pump station. Um, so this one, you know, there's there's a lot of considerations. This one of the this one is the longest option of the of the bunch. Um, you know, uh, they're all similar. Option A is about tw, you know, uh, 21,000. A1 was about 23,000. This is about 24,000. Um, so they're they're similar, but this one's a little bit longer. Um >> when you're you're talking about maybe having to possibly improve the Route 32 pump station if necessary. Is that what you're talking about? >> Yeah, it's under evaluation. Yeah, it would need to be evaluated. >> So when that pump station was designed, there was consideration for some buildout. What we're trying to do is just go back and confirm was that is that build out enough? Is it was it just for the North Swansea area? You know, were they considering West Swansea? they uh you know the the group considering West Swansea at that time or would it essentially be con you know if we were to pump it pump West Swansea that way now would it be consuming the future growth for North Swansea which would not be >> or the area on Eaten Road and and uh and 32 there. So both of those would be opened up to possible sewer connections. >> Um only >> only the the gravity feed area. >> Correct. Yeah. Unless you extend that gravity system past the force main, which it's pretty hard to do that because right you you can get very limited. Usually you go out away from it versus uh meaning like if you're in a valley or something you go uphill. >> Um >> is it is that what basically happen when you connect the red and the green? Cuz that's green is gravity, right? That's Keen, right? >> So we're forcing to the gravity, right? >> That's north North Swansea. >> That's ours by the fire station. Yeah, but that the green is gravity f. No, not a pressure. Right. >> Right. >> Existing. >> Yeah. >> This is a lot more eerie to connect to that plan now. >> And then uh so here's uh the the final option uh B1. So as you can see similar uh you know the first half is the same as B follows that Eden road corridor. However, here uh where that gravity start, you know, we still have that same high point and transition to gravity um which is shown in the orange, but here we take more of a direct route towards the uh existing Swansea treatment facility or sorry, Keen. Um so we um we cut over uh uh it's called Cedar Street and then uh eventually uh no um uh Causeway uh Causeway Street and Causeway terminates um at the end of that orange line and then at in order to connect it we would have to directionally drill um kind of it's maybe hard to see but you kind of see some overhead power. Um there's a there's overhead power line through there and that's roughly the start of the directional drill to connect to the um treatment facility. Uh one consideration here is the evaluating the uh hydraulics of that gravity line and the connection to the existing treatment facility. uh since the existing treatment facility it's at a it's at a higher grade elevationwise um than where the gravity would um the gravity line would enter that area. So that so we would need to you know um design a system to to have it be pressurized enough to um enter that facility. So there's there's options we're evaluating um like such as an inverted siphon uh type of system. Um and uh but a pumping but a pumping some type of improvement or another intermediate pump station could still possibly be needed. Um but it it warrants further uh evaluation there. >> And that that goes through some wetlands there too, right? >> Yeah. said the and the directional drill the intent is to stay underneath it as much as practically possible but yeah that there are will be significant wetlands through through there. Yeah, if I could just add um I don't know we didn't really describe what the directional drill is. I'm not sure how familiar folks are, but that's a a trenchless type technology. So it's it's going underneath the ground. They they have an entrance pit and an exit pit. Um, so it, you know, in the sense of wetlands, it works out great because you don't have to, you may have to do a permit anyways, but you don't actually have impact on the wetland because you're drilling underneath the earth. >> you're not going through any, you're not going through any aquifer down there. You're not going through any water or >> uh, uh, in that particular case, depending on the hydraology, yes, possibly. But, you know, it's all stuff that we'd have to we have to look at in more detail. >> But in terms of the surface area of the wetland, you're not disturbing it is what you're saying. Did you say um power lines too? You drill under the even if they're overhead, you drill below your power lines. What did you say about the power lines? I missed that. There's a section here with power lines, overhead lines. You >> Oh, yeah. I I just mentioned them as a as a visual reference point. >> There run through. Oh, >> okay. Um so, just as a overall schedule here, our our contract had some stipulated dates in it. Um, we got the authorization to proceed in June. We're intended to have the majority of this alternative routes analysis done um, this month. It's probably going to be it'll be next month. Um, and then we'll work on advancing the recommended route further along um, and then have a technical memo. Right now is proposed for the November time frame. The intent was to be in advance of your uh, needs for funding which would be your March Warren article. So, we want to make sure we gave plenty of time to um have the conclusions of this study prior to your development of the Warren article. Um and then following up from that, if the vote is, you know, affirmative, then you'd want we'd be in need of doing a clean water SRF application in in April. Um I would just learned that the the deadline is likely May one, so that May is really not applicable in here. So it' be be the April time frame of 2027 and then um it takes a while to get those loans in place. Couple months by the time it gets approval through governor and council and things of that nature. So you're probably looking at a August September time frame to begin any kind of final you know uh design effort after that. I think with that Joe unless you you have more we'll open it up to questions or Sarah just think as they get further along with their the route the cost is going to be one of the big driving forces but then we'll have through through the board and further discussions on which way we see beneficial like obviously the one that goes by the school has potential for some some good connection but one of the biggest driving forces will be not just the cost of the construction but which one of these designs is going to be more expensive to operate in the future with all that costs. >> I never realized remember we were talking about just route 10, but this really opened our eyes to these other roots cuz there's a lot of benefits on some of these other routes and there's there's benefits to route 10. I I see it all now. There's no directional drilling on on A, just B. Right. Right. Just a there's no A, just B. We uh we we are likely going to be forced to directional drill if we have to cross the roadway cuz it's DOT. >> So there may be shorter directional drills and when we get um you know we we factored that into that original concept even though they aren't directly shown there cuz we got to figure out you know which side of the road and it flops back and forth based on cuts and fills at all the all wherever you see a guardrail is a a spot we got to really look at. So there would be some directional drilling. explain that a little more. So if you see a guardrail that means there's a big dip down there and you would have to go too low. I don't know what you mean. >> Yeah. So sorry the reference to guard rail rails generally is you know DOT wants a nice flat roadway because of their speeds. >> So there's wherever you see a guardrail it's generally because there's a a slope on one side. >> Absolutely. >> So all of a sudden you lose the area that's off the edge of the road. >> Um so then you're you're looking at an option. You're either in the roadway and you're restoring a DOT roadway which is very costly. um they generally want full restoration. So that that's a big cost. So we want to try to avoid that. If we are construct, you know, if our align proposed alignment's on one side, all of a sudden the slope drops off, we can't construct there. That means we want to jump to the other side. We'd have to drill underneath the road. Um assuming there is another side to go in otherwise you're stuck in the middle of the road. Now you're looking at restoration. >> So that's that's >> there is potential of direct drilling on option A. Yes. >> Short period, a short amount >> shorter. Um unless you know as we get further into it, if we decide that there's some value that a longer directional drill makes sense in one particular area, we'll propose that. >> Wow, that was interesting. >> Good job. >> Thank you. On on B, Terry, I've been told that the school did did put a line in at at the bridge there. Did you determine that there is no line there? In other words, it would alleviate the the need to directional drill. >> Sorry, where is that, Bill? >> At the school. Um, we're on 32 option B with second directional drill. Um, I'm not I'll have to catch up with Joe to confirm it. But >> are you saying though there might be a line under there already? >> So they are all possibly already connected. >> It could be already school's not connected. >> No, it's not connected. >> They may put a line underneath >> when they did it. >> Oh, >> to be ready for that >> preemptively. >> If that is the case, it be interesting. type of line is >> sure >> and the size I don't think >> is there any um public input out there to anybody want to ask any questions about that >> okay none >> you do more curiosity >> hi Joe >> is the the source rightway an option for this path I I guess anything's an option, but one of the reasons I'm looking at that is the rail railroad still owns the right way there and it's very problematic to do construction with the railroad and then the contaminants that are in the ground in the railroad. So that was one of the reasons we didn't look at that option. >> Not the rail trail, but where the dinosaurs where their power was. >> See, they use some road. >> Okay. Thank you. >> Thank you very much. Appreciate it. >> Thank you, Brian. Thank you. >> Sarah, thank you. Make a motion to close the public hearing. >> Second. All >> in favor? I. >> So now we're officially still in a meeting. Just close the public hearing. >> Job bud. >> We're about to go into a non-public session for a half hour or so. >> We're not going to answer. >> So right now >> we'd have to ask people to vacate their premises until 5:30. conference that I have on my board. session until 5:30. >> Um, so we're asking people who aren't involved in the non-public session to leave this room and go downstairs and wait. >> Um, this is not for the public to uh be part of. Okay. Can we take 45 seconds and get a motion? I just have that classified section of rabbit hollow that was extended or we can do it next week if not. >> Yeah. What is the tell what what do we need to get the motion? >> Do we need a motion to Richard Whitney? We authorized him to extend the road 450 ft. He's completed that. I've inspected it and we just need a motion to accept it as class 5 road extending across. Make a motion to accept the class 5 road on Rabbit Hall Road. >> Second. >> Well, the the >> extension 450 ft. >> Except I second that. >> Do you have that, sir? >> So, you got >> Okay. So, M made the motion. Second it. All in favor? >> I >> I. >> Joe, you're all set on that. >> You finished grading that? >> Great. >> In great shape. >> Way to go. >> I don't know if I should Thank you. >> Don't have to wear it. >> Make a motion to nonpublic. >> Yeah, I already have one. >> Sue, I guess, right? >> Reputation, I guess. have a reputation. >> I think it's a negotiation >> or it could be negotiation. I guess >> I think it would be negotiation. >> You are watching a Fact TV presentation Heat. Hey. Hey. Hey. Hey, hey, hey. >> Heat. Hey, heat. Hey, heat. Heat. Hey, Heat. Heat. Heat. N. >> Heat. Hey. Hey. Hey. Heat. Heat. >> Heat. Heat. N. >> Oh. Oh. >> Hey. Hey. Hey. Would you like to lead us in the pledge Allegiance tonight to the flag of the United States of America and to the republic for which it stands. One nation under God, indivisible with liberty and justice for all. >> All right. So Mark make a motion to approve regular minutes for August 11th, August 12th, and August 18th. >> So you had some questions all these minutes, but >> I think we approved it in a morning meeting. I'm not sure whether they >> Madison isn't in here right now. So, why don't we just finish the motion? >> We'll finish this motion and we'll deal with that. >> So, you made the motion, Mark. >> I second it. >> All in favor? >> I make a motion to approve the non-public meeting for August 18th, sessions 1, 2, 3, and four. >> I I >> So, Sue, we we needed that for the uh pre-application for Northern Borders Regional. So, there was one section of those minutes that we absolutely had to have approved. So, we approved them. >> And I'm not sure it was me taking the minutes or whether it was Megan or or Katie, but somehow it must have not made it in the minutes that got to you. >> Yeah, I haven't seen any minutes from I hadn't seen those, but until I >> I didn't see any from that approved them. So, we need we need that. >> So, you need the August 21st. Y we'll get those for you. >> Yeah, we'll we'll get them. >> There's nothing at all from August 25th. >> We already done. >> She just she just needs to see >> she just needs to see them. >> She needs to see the minutes of the night of the 21st meeting that approved the 19th. >> Falls apart when you leave us like this. See what happens. >> That's right. >> Exactly. >> Don't do it again. >> Make a motion to approve the consent agenda. >> Second. All in favor? I >> He could you please step up at the t table here tonight with us. >> How are you tonight? >> I'm good. How are you all? >> Good. Could you state your name for the record? >> And have none. >> So, I wanted to give you a quick update about Saturday and the community conversation. So, everything's in place. Pilgrim Pines, thank you, has been so wonderful about accommodating us. Um, the food's all set. Um, we will be doing a couple things that I got permission for. We will at the check-in table be giving these out for Kevin and we will have also been allowed to have the Swansea Gardening Club sit with me so that she can try to hustle volunteers because she's looking for them, I guess, and that just seemed like a good fit. Um, so I'll do a quick introduction and then the facil excuse me, the facilitator from New Hampshire Humanities will take over and lead it from there. His part of the the meeting is about it's 45 minutes to an hour and it's an interactive thing. I went to Keen last week to see how it worked because they did theirs last week and it was very interesting. They had a lot of nonprofits there. Um, so ours is going to be completely different because ours will be towns people, not people looking for inter agency interactions. So we have that open discussion and then we break out into groups and the intent is for each group to come up with an idea of something that we can do as a town together. And then we come back together and figure out which one is best. and then they give us a grant for $3,000 to accommodate whatever that is. And it could be anything. I'm kind of hopeful it will be something geared towards young parents and kids, but I don't steer the conversation. It's up to the people that are there. And that's pretty much what happens. Kai will be taping it, so we'll have it for the record. >> It'll be live, but tap. Just taped. >> Taped. >> Yeah. and and um we're going to see it doesn't look like the um the grant or the the humanities will cover the cost of Kai doing it, but if that happens then uh and and the select board doesn't want to pick up the the cost of it, then Ann and I will pay for it. It's all it's all it's all cut. >> Perfect. >> Reason for taping it? >> What is the reason? Oh, well, we thought it would be something that other people would want to see if they couldn't make it cuz it's something that's never really happened here before and it might be if it's if it's good, and I think it will be, then other people can look and maybe they'll get psyched about whatever it is that we're going to do. >> And several people have told an that they can't make it, but they really wish they could. They've got conflicts. >> How do you how did you get it out there for people? How do people know about it? So um it's been on several Facebook pages and we did an invite from the Swansea government governance page which our committee has which has gotten a lot of um feedback and response as has the one I just posted on um the Swansea community page. Also I took some advice and talked to the um SAU people and they told me that they would consider it if I did it X. So, I did exactly what they told me to do and they did put it in the last blast before school started, which as Ashley showed me was great because there was all this black and white and then there was our mini fullcolor poster of what was happening. So, um Josh Gion, who's on the governance committee, seemed to think that that was a very good thing. So, we had that. I went to the coffee connections thing. I went to the last chamber breakfast so I could talk to people which is how I connected with the um garden club. >> You're with >> Danny Mitchell show. >> Oh, I was on Danny Mitchell show >> big time. >> I did I invited Marty Fisk from the library to join me so we could both talk about it. But we were both on >> the week before last. >> He gets a good audience. >> He does get a good audience. Yeah. I got some texts afterwards about that. It sounded good. Who knows? Would you like to give the details so people that don't know have a better idea of what I know you said Pilgrim Pines but where >> Pilgrim Pines there'll be signs at the end of each road east and west to with arrows showing where to go and the actual event will be in the Camp Squanto building so it's really nice it's down on the overlooking the water um it'll start at 10:00 and >> on >> I'm sorry >> what was the date on Saturday >> the 29th se August 29th 9 10:00 a.m. till noon and it should wrap up pretty quickly right after noon. So I don't I mean it's not a huge time commitment. We do have kids from Interact coming from the high school to entertain kids and I spoke to that. Oh, it's also um recorded by an artist and it's really cool. He um I saw the book from the ones that he did last year. He's an apparently a well-known Merrick I can't remember his last name. He's a well-known artist from New Hampshire. He's kind of a graphic artist. He teaches. But he suggested that I have the any kids that show up do a a art thing on what community means to them, which is pretty perfect because it pretty much is what their parents will be talking about. So that's what the kids will be doing if they show up. >> Very exciting. You put a lot into this. Good for you. Hey, and can you get some rest after this because we have a lot of things coming up. We're going to need your help with the governance committee. >> You got a lot in your plate this year. >> Yeah, we are. >> We got big plans for you. [laughter] >> So, we need you to get some good rest. >> Yeah, we know. We're We're ready. >> You do a good job. You help out us. >> You are unbelievable help. >> You have enthusiasm. I love it. Love it. >> Good. >> And I love that committee that you have that that committee is going to do wonders for us. >> Yeah. and we're going to need him this year. >> We're ready to work on Scott's project. >> We're going to give you projects. Trust me, we're building them up right now. Bill's got a big list in his back pocket. >> Oh, dear God. I see a resignation in my future. [laughter] >> You've got a marathon in your future too to run. So, >> thank you for the update and good luck. And I >> hope you can come even if this is falls on a Saturday. >> This Saturday. >> This Saturday at 10:00. Yes. >> Till noon. Yes. this Saturday >> at Pines >> Camp Squanto. There'll be signs to get you there. >> And thanks for helping me make >> whoever's listening in tonight, please show and it'll be fun to do. >> Thank you. >> It will be. Yep. >> Thanks, Sam. >> Okay. So, next on our appointments was Joe Duso, but unfortunately Joe had something he had to do. But what we did what I did found out that the gentleman two gentlemen down from me has the information that Joe was going to give us. So I'm going to let Jay >> tell give us the update of Wilson Ponds. >> Joe Joe stopped in um last couple days and we went over what he's doing. He um he's put another full board in. They're now six and a half boards in the dam and he's the intent is that he will leave it in there till the water level comes up. If the water level gets up too high, he will take start taking some boards out. He may have he may have he has a 2in board. He thinks he might settle on 5' 7 3/4 5 foot and a and 3/4 boards instead of 5 1/2 or six, but he's going to let the water determine that. And we talked about um how that will be um uh we hope the main goal right now is to keep the water in the pond as it is replenished by rain. Uh we'll see how that works. But the um the other part of what what the Wilson bond update is is that tomorrow we have our uh company coming and doing a survey of the pond for what vegetation and they'll get back to us with management ideas. So >> So I'll add to that too. So after the meeting, which was on a Wednesday night, the next morning I got up extra early because in that meeting I was told there was a broken fence, there was a broken bench, and there was ruts, right? So I wanted to go out and see how we could help out with that. So I drove out there and I called Mark cuz I didn't know where the broken bench was, the broken fence was, and I wasn't sure the ground where people park. I didn't see the ruts, but I guess he meant the ruts along the the edge of the water, right? >> So, what what happened is, of course, as you found out, uh Joe repaired that last year, and the the ruts are um repaired as well. Now, I'm not sure how much Joe does. There's a man named Richard who comes out to the to the to the boat launch a lot. Uh he was there just last Sunday with his with a with a dependent of his. Um, and they were um, enjoying the water. They were they had a little motorized boat they were playing with. And Richard is an older older guy who's who loves the boat launch and his he brings in gravel periodically to fill in the holes on his own. He is offering uh right now he's he's got some some financial things going on. He's not quite sure, but he offered last year and again on Sunday he offered to pay for upgrading those benches that are there. Uh, and I'm waiting for him to, you know, actually do that. But he he he said he's he each foot of or each yard there is is like half a ton of gravel, and he's he's getting he's going to bring some more in. So Joe's done some, he's done some, but the there's no real ruts there right now. And there uh the benches are repaired. It doesn't it's not sat on them all the way down to see if I I'm missing something, a loose board. I wiggled everyone. I called Mark and I asked Mark and Mark said, "Well, maybe they must have been fixed." >> They were fixed last year. >> Then I called Joe and I asked Joe who maintains out here and he says that Angel in video from the town, they come out, they weed whack, they mow regularly. >> So, right, >> I was trying to help out on how we can keep that. And I said, and I called you the night, didn't I? >> I woke you up, didn't I? Yep. Didn't wake me up. Go asleep after. >> But anyways, you know, cuz I did understand their point that, you know, people do go there and we need to make it look nice. So, I was just trying to >> and and thank you, Jimmy, because that was the other part of what I was supposed to report from Joe was the fact that he had take he he'd inspected and it was still fixed and all that, >> right? >> So, >> great. It would be nice if we could upgrade those benches and stuff. So, if he does do that, that would be wonderful. >> Right. Do you folks have any questions? What does the water look like right now? Like is it up like >> I think it's up. >> It's what? >> What about over at Sue's coat when she talked about those pylons? >> You don't go down there. only except in the middle of the sort. >> But I can't I can't come. But I could get back to you, but I I don't know. It's still low there. I kayed through there the other day. It was pretty low. >> But it kind of always is. >> Yeah. When I went there, when I went there, the water was coming over the the wood. I mean, the water was coming over. There was water going in there. >> We had a little issue. We had a little issue because >> he made more tire than the >> Yes. But and I I asked him to go out there because the top board that was in there wasn't flush with the bar beneath >> So water was running out between the two boards and they fixed that. >> And that is now higher than it has been. And it's there to keep the water in the pond until we get it up a little higher. And so it it it was not going to run over the boards the way it has left it. It may not ever run over the boards now until we get the pond level up to where we like it. So, >> who's we? >> Uh, Joe. >> So, you guys come to Right. Because there's there's people that don't want it that there's people >> at this point. >> They never see anybody proposing some information that maybe people think I know and I don't. So, I just came on my face, but I don't have >> Thank you, Vicki. >> Thank you, Lisa. >> Vicky, sorry, Lisa. Brian, >> do you have anything else you would like to add and discuss while you're here about Wilson Pond? >> When is the the meeting? Would you like to when is the meeting then? >> Uh it's Saturday Labor Day. So >> it's the 5th I believe. >> 10 a.m. >> You remind me at >> 10:00 a.m. on Saturday the 5th. >> 11 a.m. >> Well, anyways, we did go out there and we did look around. or trying to >> you know I don't even understand are those things >> are the white boards that to me look like guard rail or are what we're referring to as dentist or actual dentist >> I guess that's a good question cuz when I stepped back and I was looking they're like a telephone pole in the ground and they look like they've been actually hit cuz some of them are tilted and that's what thinks the B and I'm thinking this wasn't made for a bench. I think this is just some people won't drive into the water, right? And it makes a lot of sense. But I think what they did is they saw two things with one thing, right? They they use it as a bench and then they use it as a guardrail. So those have to be pretty strong. And cuz when I step back and looked, I'm realizing this is a guardrail, not a bench because I was trying to figure out where the broken fence was. And what Richard's talking about is trying to make it look more attractive and and also still be as solid if he can if he can pull that off. >> I issues that 10 years ago. Those were that was >> and they were put on top. >> As far as the water level, it was never maintained the way it was. So we used when I lived on Wilson pond, six of us took over and made the water level higher. >> So I'm not sure if you wanted it lower or not. I can tell you in the past we had >> we had it to the top of the dam and then Ela would come and take it pour it out because there were three people who were complaining water was getting into their basement which was part of the water which was also affecting their furnace and we had a huge issue with that. We would actually put the boards in illegally, screw them in illegally, and then like a mother to get them out in the fall time so the water levels would go down in >> Well, you know, back. >> Thank you for your question. >> What was your name? >> Yeah, cuz just for the record that you spoken so Sue can put it in the minutes. >> David Mason. >> Did you get that? David what makes me I used to sing all the time and you know I just disagree. >> All right so I'm going to move on here. Um who do we have here? Energy commission. Who's that? Joe. >> Huh? >> Barbara Barbara. >> Barbara's coming. >> Oh hi Barbara. How are you? This sun is hitting me right in my eyes, Barbara. So seeing black out there coming through this window right here. >> Is there anything I can do? >> No, that's unfortunate. >> We're getting I see you need to move. >> How are you doing, Barbara? >> Good. So, um I'm here because of, you know, potential sale of the Rex from the um solar array that we have at the wastewater treatment plant. And so, I'm guessing everybody got a copy of or saw a copy of the proposed contract with Revision. >> Okay. So just as a little summary, um, revision acts as what's called an aggregator. So, Revision has projects like this one that they've done and other projects that they've done and they um aggregate those wrecks and then they sell them to a broker and the broker deals in much larger volumes than what Revision has as an aggregator. So, um, that's why when you look at the contract, it has revision with their Portland address because that's their headquarters. And then at the last part, there's a um, what do they call this? The service agreement, the wreck uh, certif renewable energy certificate service agreement. That's Massachusetts. because Revision uses Massachusetts market because it's a much more robust market and they're most likely to be able to sell the Rex there than to try to deal with some place in New Hampshire. So that's why that is in there. >> I appreciate you getting that clarification because it didn't make sense until you you brought it back. >> So the way this works, we already have um what what do they call it? uh DAS uh data acquisition system we already have that incorporated in the solar array that we have. So what that means is that data automatically gets fed into um knee pool which is the New England pool and then what happens is revision will pull that information and it'll tell them exactly how many kilowatt hour or watt hour kilowatts we have produced and then that's how they determine the value of the wreck and they they do that they they're able they have an account. So, they're able to go into that knee pool, pull that information, and then they pay us. But they will be retaining $3.50 based on this contract per Rex sold. So, you know, that's their fee. >> How much does a Rex solar go for? You >> They go like for like the last I heard it was like $40 or a kilowatt hour. I mean a kilowatt. >> Well, I think it's kilowatt hours. That's the energy. >> Kilowatt hours. >> Kilowatt hours is energy. Kilowatts is power. Kilowatt hours. >> Kilowatt is power. Yeah. >> Kilowatts is power, but kilowatts energy. Energy is kilowatt hours. >> Right. But it was expected like he was saying he was based on our system that I mean we could expect like 5,000 dollars, you know, from >> from that um >> per month year per month. 5,000 per month. >> That's good. >> How How is the broker paid? >> Wait a minute. Wait a minute. I just want to rethink about that. 5,000 a month or a year? Because 5,000 a month sounds a little high. If you if you figure $40,000. >> Yeah. Yeah. No, maybe it's a year. Um, how is the broker paid? because they uh I think revision pays the broker like a $150 or something like that per wreck >> out of their three something. >> Yeah. But again, the broker is dealing in much larger volumes so they can afford to just charge that little bit whereas revision has a smaller amount that they're representing and so that's why they do. But I guess according to Revision, they're competitive. You know, that's what you're going to get. Um, so I originally we thought priority power would be able to do this, but they don't deal in Rex. So we can't, you know, that's not going anywhere. So if we don't do revision, then we can always try the other one which was in what was it? Nullwood or something like that. There's another company. But it seems to me that these guys would be pretty straightforward and you know this is what no matter where you go this is what we're going to get. Um and it we have a relationship with revision you know so it would just be maintaining you know that or extending that. So I guess the thing is is to look at this and see if it is agreeable to what you think the town should be doing. I mean, the nitty-gritty is just what I said. You know, they're going to pay us, you know, whatever the going rate is based on the Massachusetts market, whatever they, you know, however they sell them to the broker. Um, and then they're just going to keep $3.50 out of that, say, $40. And then they they pull out the information and they send us the check. Revision sends us, >> we get the checks, come to the town, and the amount we get might vary as the market varies. So, so there's no guarantee. Exactly. But it's going to be more money we're getting now, right? >> That's [laughter] right. That's right. We're getting nothing now. >> Um, so that's what I mean. Some people choose to do what they call retire their wrecks and so they never really sell them because they think they're doing a good thing because they're just creating this green energy without, you know, the rerecks go to um there's two kind of markets. There's the voluntary market and there's the compliance market and basically revision says they deal with the compliance market. I mean so like your utility has to have so much green energy and if they don't then they buy Rex and that makes up for the amount. So they're they're buying the fact that we are creating that energy instead of the utility. All right. So, some people feel that if they just retire their racks, they don't sell them, then they're doing something that's better for the environment because somebody else can't say that, you know, they're creating this anyway. But I don't think that's an option that we want to do. I don't think people um in the municipality would be interested in retiring their Rex. I think they'd rather get the income off the Rex. [laughter] >> Probably right. >> Yeah. Yeah. >> And this is for one year. >> Yeah. Yeah. Well, I'll have to look at this. Um, I think it's one-year contract, automatically renewable, and there's terms in here in terms of, you know, if you want to back out. >> Yeah, there's some lag time. >> I forgot whether lag time. I think 18 months that if if we were to back out, they still have 18 months based on their >> work to to sell them, >> right? Um, so yeah, I mean, you know, I looked at this and you know, I'm not a legal ease person and I don't know what the how you do this. I mean, do you have our lawyer look at it before we sign stuff like that? >> So, you know, basically, I think what you need to decide is if you think this makes sense and this is what you want to do and then move forward. I mean, this is the contract. um other than it doesn't have, you know, the specifics like the co our name and and the facility. So that would just be filled in um by revision and then we would sign the contract. Uh so >> so what you'd like from us is to authorize this the board chair to sign on behalf of of of the town subject to attorney's review. >> I believe so. I second that motion. >> No, Mark's got to make the motion happen as he just did. >> I make a motion that we authorize the chair of board to sign a contract with the revision after it being reviewed by a town attorney. >> I'll second that. >> Hey, thanks for pursuing this, Barbara. >> Really? I was really >> sending that one. >> No, got to go send it to >> you. We have a copy of that, right? Yes. >> Barbara emailed it. >> So, we can print it off. I have a pardon. >> We can print it off. We have it. So, we'll do it and send it to Cordell and I'll sign it. >> Oh, yeah. Um, but they have to, you know, uh, revision has to fill in that other information. So, if you want a copy, you know, then we'll you could print that one up. But Oh, but you can have this reviewed by the lawyer, right? Without our stuff on it. I don't know. Whatever. You guys know how to >> then we we'll let you know that we're ready to do it and you you get Revision to send us a copy with their name in I mean how does revision get their name on it? >> Say that again. >> You said that revision has to have their name on it and >> it has to have our name on it. >> It doesn't have our name on it, >> right? So, how is that going to happen? We're going to put our name on it. >> Well, if we if you want to do it, then they will do it. They'll they'll print it up and send it back out to us, I believe. >> And then we'll just or >> because really we don't have this template >> to to be able to do it. So, they'll do it send it out to us. I'll send it to you >> and you do whatever you guys do because >> the next thing we get from you is is the final version of it that then Jimmy would take to the lawyer and decide about. Okay. >> Right. Right. And >> I I I just question that because that's timing. We we can forward this to Cordell tomorrow, >> Because the only thing that's going to change is the addition of the the client, >> So, we could >> Right. So, we can get the lawyer to look at it before you send us the revision revis. >> That's that's the best way to do it. >> Right. Right. Yep. >> Um and there was a second part to that email. It had to do with a management agreement and I don't know if you looked at that. >> I did. >> Okay. But that's the revision is also um offering to do that. And again, I don't know if you feel we need someone to manage the solar array. Uh it explains exactly what they do and maybe perhaps that's something you might want Joe to look at or you know if you again there's a fee attached to that and but do we need it? I I don't know that we need it. Um but then again I'm not the one who's managing it. So um perhaps You could take a look at that and or send it to Joe see I mean he's the manager right now of that solar array isn't he? >> Yeah. So I I would say you know take a look at that because it talks about you know um not it's comprehensive. So it's the technical component as well as you know the physical component of ma you know management. So, um, I would just ask you to take a look at it. >> I was personally hoping that you would bring the details forward so that >> of of the plan >> of the of the of the management plan. So, I I'd at least understand what I was going to be reading. So, >> okay. Well, >> not necessarily you, but you and the committee and after you've all re reviewed it. >> Okay. Well, >> advise as to whether it makes sense. >> I guess, you know, I I can't make that decision because I'm not the one who's managing it. So, I mean, I don't know how much of a, you know, uh, issue it is to try to do this, you know, is this kind of like making it a bigger deal than it needs to be or, you know, and that's why I think maybe if Joe reviewed it, he would say, I'm doing this. I don't need anybody else to do it. or boy, that would be a load off my hands, you know, or it might be um an assurance, you know, if something fails technically, we've got someone there to fix it without us having to call somebody to fix it, you know, that kind of a thing. >> So, you know, I would suggest maybe having Joe take a look at it and see if you think it's worth the expense. >> Okay, >> we can do that. >> Thanks a lot, Barbara. Thanks for watching this. >> There's a lot of work you put into that. Well, a lot of emails back and forth, right? Oh gosh. All right. Thank you. >> Thank you, Bob. Crawl your help. >> Okay. Where are we? Public input. That's right. Public input. We have any more people out there that would love to speak or come right up. sit in the big chair right there and state your name and let us know what you need. >> My name is David Mason. >> Hi, David. >> Uh, three things. Number one, you're a tax man at Swansea is amazing. I literally made a mistake uh two years ago for like $100 or something. I overpaid by mistake. He could have easily kept the money and he was 100% call me the next day after it went through two or three times. He said, "Nope, you have over you paid me too much." I mean, I sat there and counted out. So, I want >> We're talking about Kevin. >> So, amazing person. Um, your register for vehicles. >> Uh, what's her name? Heather. Heather. Amazing person. So, two shout outs to those. >> We also have Amanda, too, right? >> I haven't met Amanda, but but Heather, >> we'll give a shout out to both of them, right? >> I want both of those recognized if I could please. >> Fantastic. The reason I'm here is a question and I've gone to a couple people and nobody wants to either admit to it or know the answers to it from the elementary school. Joe, can I actually talked to Joe yesterday about this and Joe was going to get back to me cuz I kept forgetting when you asked me and I remembered yesterday. So, I called him and he's getting back to he thinks the state owns it though. >> Okay. That's what my thought was too. So, can you can we make the state do anything about it? >> Fill us in on the question first because I don't know what he's what you guys are talking about. >> Okay. on uh Sawyer's crossing from the elementary school all the way to where I live on on 37 Sawyers element the the between the sidewalk and the school's fence. There's a piece of grass that's there that's like 12 ft wide by how many yards long. It took three years for them to mow it in Swansea Center. We're all talking about how beautiful Swansea is. Um Kevin Bell and I have taken it upon ourselves to mow every now and then. I mow it from my property all the way to where the um fiber optics garage is. I mow that every other week so it doesn't look horrible. But from the fiber optics garage all the way to the usually to the street where the driveway is for the elementary school is it very rarely if ever mode. >> David, hold on. Let me tell you. I know where Kevin lives, right? >> Are you talking going toward the police station? No. >> From Kevin. >> From my house. >> I live right. >> Oh jeez. You're killing me. You're killing me. Right across the street from Kevin is me. Okay. >> White colonial green shutters. >> Beautiful Christmas display on keeps the house. >> David, I apologize. It's beautiful. >> Now I've been Now I've been in your place. >> It's beautiful. I get it. [laughter] >> I see it. I see it. I see it. It's beautiful. So from my property which is the white colonial >> towards the store >> towards the school that property from the sidewalk to where the stone fences um is never been mowed >> ever. >> 3 years ago the school mowed it up to a point but from the end of the fence where the school has their fence and all the do not parking signs that part has never been mowed. There's huge branches where the trees have fallen. Kevin and I have a couple times have gone out there and moved some of them. It's just a pl pain pain in the butt. Um I mow and I don't I don't mind mowing from my place to the um driveway for the fiber optics, but the rest of it, I mean, you know, I can't control our neighbors down the street that Tarians their their place is different looking. Um but I'd like to have somebody be, you know, once in a while and and thank you, Mark, for looking into that. So, >> but unfortunately, I guess the state owns the state doesn't give a rat's derriè. So, I don't know how >> maybe it was just a spot that they thought they were doing it. We thought we were doing it. We missed it. And you're you're bringing it to light. So, maybe we'll get it done. Maybe we can fix this problem. >> I don't think it would take much, but I'm not trying >> problem. I think we're going to probably figure this out and fix it. >> I I don't think it would take I I went to Tony Brian at the high school and he goes, I I don't own that one. I went to the town and they said, "No, the school owns it. The school says they don't own it." I figured it was the state because they own to the fence the the the stone fence there and I know they don't give a rat's derriè here but it >> you know it just looks not that anyone cares but I care I try and maintain my property bill you understand the concept of making a a nice looking place so >> you do it every Christmas all year but >> yeah I try so anyways that was my question I just was wondering and I didn't need to come here Mark you answered for me so thank you very much I'm sorry that you had to come in and do this but we will get that we'll get looked in. Mark will will push Mark right into getting this fixed. >> I also wanted two shout outs for the to town employees that do a great job. So, >> that's really nice to hear. It's nice to hear that once in a while, you know. Very seldom you you hear the bad things, you don't hear the good sides, you know, and it's nice and boy is pretty good once in a while. >> Every time I've gone to register my vehicles with Heather, she's always been amazing. I mean, she's very polite, very kind, very whatever. And the uh Kevin, I believe his name is. >> Yes, Kevin. >> Um I mean, he could have I believe 50 bucks or 100 bucks. I I was convinced I paid everything. I what I I mean I counted it twice. He counted it twice. I was short. So I put more money in. I'm like, "God, I got to be short. I count it." And literally he called me the next day and said, "I got your money here." He could have easily pocketed that and no one would have >> I told him to keep it, David, so we can mow that little section. I said, "Now we can get that section. We can pay for the gas." [clears throat] Oh, no. >> So, anyways, I just want to give the two shout outs and positive question and we'll we'll send that message off to the town hall that you just gave us tonight. >> And off the record, I heard your commercial, not your commercial, you went to your son on the radio the other week talking about your going to the great job on the baseball with the uh helping out the first responders. >> Thank you for that. >> And his place down there is great. Your place is great. >> Great. Thank you very much, David. >> And uh your house is beautiful, David, by the way. It's unbelievable, David. No, I always almost get in an accident cuz my head is turning over there all the time. It looks I'll show him tomorrow. >> Have a great night, David. >> Are you guys here to approach us? >> Hi, Joe. >> Good evening. I want to say I registered my daughter the other day and Amanda was great. >> So you had that call up, right? For her. >> Let her know. >> Uh >> what brings you here tonight? >> Sort of uh step two of the process that we started last week. Uh again the the lake association is uh preparing a grant application under section 319 which is a water quality improvement grant. Uh it is administered by state dees. They did not offer any grants last year uh due to some funding issues in Washington. So our expectation is this year is going to be very very competitive for the small amount of money that is available. Uh we are working with southwest region planning commission as basically our grant writer. In our pre I think preconcept meeting with Southwest and dees they both recommended that we have a letter of support from the town. And again, as I mentioned last week, we're not seeking any money. The TAN really has no functional responsibility here, but they felt that a letter of support would be very helpful uh with our grant application. That grant is targeted at two places. one as we work down the list of both high and medium priority items from our watershed base management report. Uh two items that have now sort of bubbled up, excuse the pun, are the uh the shoreline uh at Camp Squanto and the work would be to target that the erosion that's going on there through various means. The other part of the uh the grant request is to set up a fund to reimburse partially reimburse homeowners on improvements to their septic systems. We're seeking a grant of about $70,000. That grant proposal needs to be submitted, I believe, by the 10th or the 11th. Uh, and as I mentioned last week, I go on vacation on the 3 and I'm trying to get everything done before that date. I believe Stefon has prepared that letter of support. I know Jay has a copy. I don't know who else has it. And that letter, I think, is but I don't want to speak for you guys. >> I have two letters here, Joe. I have the 319 grant letter and I have the uh on call engineering. >> Yeah. Let's let's put the Han calls to the side and let's focus on the 319 before I know I tend to get confused between the two. >> This is hot off the presses. >> Anything you want to add? >> I won't talk about on call yet. >> Who who drafted the letter? >> Stefan did. >> We had a meeting with Stefan. Uh no, Sherry and I had a meeting with Stefan last Wednesday. talked through a lot of the background uh and he drafted that letter which frankly I saw when I showed up here at 4:30. So I did a quick review on my phone and looks good to me. >> There was one part of it that Stfan took out because it was not good. >> Yeah, but we both recognize that. >> Did he see the pat that you took out? Did he read it after you took that pat out? >> Yes, I'm sure. Because Stefan would have >> You know what he's talking about? >> No, I do not. I I didn't hear the whole thing. >> There was a final sentence at the end which was basically gobbleygook and we took it out. >> Yeah. Mine did not have gobbleygook. >> So I assume mine said it said yes I did. >> This is the part I'm good with. >> This is the part that he took out. The town of Swansea thanks its residents, collaborators, and stakeholders in the consideration of assisting Swansea in its pursuit of a happier, healthier community. >> we took that out. If you give me a second, I can tell you if it's out of the version that >> that was >> I have no problem if you take that out. >> Read this. >> Maybe you should read it. >> Everybody's read. >> We all have to sign it. So, you know, >> like to give it to Joe tonight if we could. >> No, that's not in the version that I Are you all set for Saturday morning at 10 o'clock? >> We just about that, too. >> All right. So, >> I hope to be there. >> So, what do we do? What do we do about Allan? >> Well, I think four signatures are enough. >> We just need three. >> Yeah, but do you really want to leave one blank that that we'll that >> Joan needs it? Well, I've got I need it by next Tuesday. >> So, what you bring it to the office? We'll tell Allan to go. And I'd like to see five on there. I I don't think we should leave a blank. >> Allan can come in tomorrow. >> Allan didn't couldn't show tonight. And I just want to make sure I I would like to see all five of us on that. >> I I agree. If if Ken meet the deadline, >> So, then you could pick it up from Bill tomorrow. He'll be in the office >> He'll be in the office. Okay. I'm not sure what time, but >> I won't be tomorrow. Tomorrow I'm taking a day off. >> We'll get a hold of Allan. >> I just >> While you're signing that very quickly on the on call engineering program. Uh we have been talking with Southwest since last April uh regarding taking advantage of their on call engineering program where they sponsor small conceptual engineering projects related to transportation. Uh and the one that they earmarked actually before us was uh doing a conceptual engineering study on Talbot Hill Road to prevent er further erosion on Eastshore Road which from our standpoint then winds up in the lake. We've been began serious discussions with Stefan at the conservation commission meeting early August. >> Yes. And um the conservation commission supports this and is willing to put some money up um to make it happen. Maybe some matching money from the town. U but the last time Talbt Hill Road washed into East Shore Road uh we were lucky enough to get FEMA money to help fix it and I don't know if that money would be available if this happens again. So the conceptual study is just to see what's possible for Talbot Hill and um what could improve that situation to stop a lot of the runoff which I've got to say the town has already addressed a lot of it um from the last flood uh the improvements they've made have been great but uh if we did have a storm of the magnitude that happened three years ago uh we may have further damage to East Road and Again, like Joe said, our concern is that Washington to the lake, but it is a transportation uh type of thing to protect East Shore Road. Uh so that's sort of the background on that. So to put maybe a little finer point on this, know we do water testing on the lake and I happen to actually go out and do the dissolved oxygen testing and you want a lot of oxygen in the water. uh based on the history I actually detesting the morning of the flooding. So we have a great baseline. Uh you definitely see deterioration of the water quality being supported by all of this sediment that has been dumped into the lake. Uh it is consuming large amounts of oxygen which isn't there now for other things. So preventing future flooding of the lake uh to date for us is a very very high priority. This particular program the maximum grant I believe is 11,500. Some of the early estimates from the cost of the conceptual engineering project have been on the order of 15 to two to $20,000. So we as a community would need to come up with a match on the order of 3500 to 8,500. >> What would you do with this? What is what are you going to do? >> An engineering firm would come in >> just get the engineering part of it done. >> To look at Tablet Hill why the water's coming down washing out East Shore Road. Right. >> Particularly the road why Tabith Hill Road. Uh probably the most powerful thing is there'd be a stakeholder meeting that the engineering firm would initiate with ourselves the various stakeholders involved with the town and start talking about what options can be could be. They would then do a complete study, come back to us and say, "Here are the two, three, four options. Here are the approximate cost." And then we as a town would have to decide >> how we're going to do it. >> Do what we want to do. Is it worth that investment? >> I I don't have this all about this. Excuse me. Is that what this is about? >> That's the letter we talked about before. This is I think staff. No, this is the letter. They're now looking at the at >> I have not seen that. >> We haven't seen that, but we have been meeting with Stefan. >> This came from Stefan this afternoon as well. So it >> Yeah. You want to look at it? >> Is this the same time constraint? >> No. This has got we've been talking with Southwest for 14 15 months and at the beginning of those discussions we are at the top of the list. As their effort drags on my concern quite frankly there's going to be more and more people vying for a very small pool of money. So I've got a sense of urgency because I want to stay at the top of that list. the longer we take it's a sort of a first come first serve basis. I think they only have allocated about $35,000 for this program. So they're con considering giving out three grants >> what >> 3,000 you said >> of that 35,000 three grand of 11,000. >> Yes. I'm sorry. >> I'm sorry. I thought you had a D in there. No, >> three grand. Does that read okay, bud? >> Looks good. Yeah, >> I trust bud. And then quick read. Let's check. >> What is that? >> That That's the letter of support. It's not a letter for the for the we just we're talking about So if everybody's up with that, we could sign that too. >> I'd rather wait till next week. >> Yeah. Okay. So we'll put that up. >> If there's no hold, >> we're going to get this one signed by Alan, the one you originally came, the 319, and we'll sit on that for a week or so. Is that okay? >> That's perfectly fine. >> Yeah, cuz the most emergency one is the 319. >> All right. And just uh before we leave on call, just full transparency, we're going to be coming back and saying with that letter, we need we in total need some money. >> Yeah. Which we may or may not have. >> Exactly. Right. But I just want I just want to be upfront. >> The first one there's no money attached. >> This one >> the on call there is. >> That's why we want to sit on it for a little bit. I think >> understand. >> What'd you grab your wallet for? just said when he said that >> uh I I I did shift my weight over the walls. [laughter] >> Now the lake association has a very very small budget and we are willing to kick in some money ourselves. You know this does show a good faith. >> Well all that's in the negotiation phase as we get closer to >> All right. Sounds good. >> Oh it's very nice visit guys. Thank you for coming in again. Thank you. >> Take care. >> Hey, and if we don't see you, have a good vacation. >> Thank you very much. >> Where you going? Italy. >> No, that was last year. We're going to the UK. >> Joe, we'll we'll leave this at the front desk with Kate. >> Okay. When does Alan When When's the earliest I should consider coming? >> We're going to call him tomorrow. >> So, thanks for coming and I'll let we'll let you know. Okay. Great. Thank you. Okay. Mass grant. >> Okay. So, Stefan, also uh the next item on the agenda is the mass grant. We asked Stfan to >> list some possible projects. Um I'm not sure this list is got any meat to it, but I I can read it to you. I I didn't make copies of it because it seemed like a waste, but uh he's he's listed three ideas and then has the fourth one is additional suggestions by the DPW director, select board, and residents. So, it's it's it's that it's in that stage of development. But these are the three continued southerntherly extension of sidewalk along Old Homestead Highway towards Talwood Hill Road. Second one, engineering analysis for the construction of an easterly road for emergency services traveling from old Homestead Highway to the rear of Marcy Hill through map 219, lot 42. If you're picturing that, that's from the fire station basically to Marcy Hill and that potential development in that area. And the third one is engineering analysis for reconstruction of class 5 road along Oliver Hill Road to intersection at CL Lane Road and Woodland Heights Drive connecting uh through Oliver Hill Road to the Woodland Heights area from Route 32 to making making that a a viable connection. Well, these are engineering studies, those two things. So, I'm attracted to the idea of east west corridors being available for emergency services and communications in the town. And both of these engineering studies would be preliminary toward potential development of the town in those areas. However, uh they're they're just engineering studies. They don't actually get anything built. Whereas the first one, the sidewalks, actually builds sidewalks that go down a Toddale Road and might be extended at some other time. And then there are other ideas we might want to use for the mass award. So that's what Stefan has given us and we need to think about it and either discuss it now or later. >> Yeah, the grant application is due in mid October, >> something like that. and Joe would need to be talked and spoken with with regard to extending the sidewalk. He's taking it to the church this year and then this would extend it further which he's got to do research on. >> Stfan said that um Joe simply said to him uh why don't we just continue with the sidewalk. That's what Joe said to Stefan, but we'd have to ask Joe for a little more detail about that. We got a lot of sidewalks out of the mass grants. >> So what is that really the question whether we want to go after a mass grant for this in particular thing or is there other things is that what we're trying to say right now? >> Well, this is a transportation early to grant, right? I mean that's what the mass grant is and it's a donor who's given this money >> has to be in by October. >> Early October. early to >> and this is something we've we've received at least three. >> If not more, but at least three. >> We have. >> And there's some concern that the donor >> behind the engineering not the >> one one of them is >> the sidewalks and the other two are just >> engineering and looking how it would be done, right? >> How costly are these things? Well, >> like where do they run? Hundreds of thousands. >> No, I think the last one we got was 50,000. >> 50 or 75. So Joe runs the pavement >> as far as it will go. >> Interesting. >> Yeah. And the the um other argument for the engineering analysis is that um having done that study, it makes it a little easier for someone who wants to develop those areas because then they know they had the engineering done, they can then focus on the construction costs. That's what that is, you know. So if we want to induce somebody to come up with something like that, then that's that's a inducement for a developer to go look at that project. >> So that's the only these are the arguments that Savon gave me and I'm just passing. >> So this is a board of this would be a board thing that we make the most to send them out. But you want we want to give Joe time to look into more of this, >> So just giving us a heads up being And Joe's already aware of this. >> Uh, I don't think Joe's seen this little memo, but he and Stefan have had a talk. And all I did, all I know is that Stefan said that Joe said, "Well, why don't we just do sidewalks?" That's what Joe said. Now, we can ask Joe for a more definitive answer to that. But that's that's what we got here. >> Right. Exactly. >> And that that would be part of that. >> Yep. That'd be part of the the on call engineering grant. >> That wasn't >> It was not a came in as public input. >> Yeah. Came in as public input. That was 319 grant. Did you um >> do you want to see a copy of that letter that they that we are thinking about >> And then the on call engineering grant letter is here. >> Yeah. Yeah. I don't think you need this. Just just that we discussed it. We're going to look into it. She wants the other member though. >> I didn't hear what you were saying. >> Oh, she meant the other meal. >> Oh, this this the other one. >> I'm apolog update if you want to. >> Yeah. Uh, hold on. Over there. Yeah. Well, any other business? I just want to briefly touch the administrative update. >> Okay. Go ahead. >> But okay. Um, just the phones. Um, I had a nice talk with the people from Fidium today about um what we're paying for through Fidium for phone lines in the town. And there are a couple interesting things that I discovered. Um, we were specifically first of all focusing on the town hall and the police station. The idea is that they're proposing and they sent me a proposal which we're considering I hope um for running internet service basically to both places that would be would cost about the same as what we're paying now, but it's four times better in terms of capacity. and so on. It's fiber. Yeah. And um it would replace the spectrum internet in the in these places. And currently in in town hall, we have both spectrum and um first light first light u providing internet. And Chris Emerson was on the phone with us and he refers to the the first light as uh crappy internet, crappy fiber. Um but but basically this would be an upgrade and they're proposing to to um do that for us. There's um if if we were to sign this contract uh by Friday um they could give us 3 months free. Chris and I spoke after our our team's call and he says and I felt the same way. We've gotten in trouble before rushing into things, so we don't really want to rush into things. And we're talking about $450 a month um for 3 months. The savings we get there is pretty minimal in terms of making sure we want to make sure we're getting what we want here. So, we we thought we'd wait a little bit. It takes 45 to 60 days for them to install this. And they they basically install it and we'd be running under both systems for a day as they test it all out. And then we we go on to the other. And the other other part of that is we have to find out what it takes to get out of contracts with First Light and Spectrum. Um Christine did some digging and discovered that the First Light contract is a three-year contract which expires in uh end of December this year. And so it maybe we can't get out of that until then. We have to figure out whether there's any early exit provisions and stuff like that. But that's that's what we've done today. looking into it so far. Um Chris advises that there's no reason to rush that uh there's a small cost to wait that looking into first light and spectrum contracts discover cancellation costs which we started to do and he says that we first need to switch from sang etc and uh then we'll be then we could upgrade the internet on top after that. So, we basically we want to get better phones in there and then get better service and and having the 45 to 60 60-day installation means that we we don't have to rush. We we eventually get that before the end of the year. But if we can't get out of the spectrum and the the light the first light, then that maybe we have to wait till the end of the year to do the upgrade of the system. the spectrum contract we're trying to track down. Christine wasn't able to find it in the this afternoon. The um first light is our backup. We're all we're running spectrum and town hall right now. That's the internet we're using. The first light is fiber as a backup in case the spectrum goes down. And we all talked about how we didn't necessarily need to pay for a backup. So that's the idea. Chris's idea was that we should cancel first light first and save the money on that while we're going to but we may not be able to. We have to look into that >> and wait for the contract. >> Yeah, the contract ends then. Um, also we have a list of all the lines that we're paying Fidium for and some of them are lines which we have decided to discontinue. The select board apparently decided to discontinue the alarm lines on the covered bridges for instance. They haven't been cancelled and we've been paying several hundred dollars in in monthly fees for for those lines. And I have a >> supposed to cancel those. >> Lori apparently was asked to cancel those. Um I have a spreadsheet of all the stuff we're paying with and we've Christine and I have identified where all these are. Some of them are ones we just don't want to upgrade to fiber. You know, they're and we can do that easily where there's um internets. For instance, at DPW there's internet and at at the uh uh transfer station there's internet. So all we have to do is arrange for them to be changed over to fiber. Uh copper is going away. They're they're everywhere. >> They're ripping the copper lines out. And what Fidium is doing is they're raising the price of the copper lines to force people to go to fiber. So, the costs we're paying already are are going to go up. Right now, we're paying $1,438 for $28 a month for these phones, of which at least seven of them uh we were supposed to be we don't use. Okay. We don't we don't use the the fire panels in um the um transfer station. We don't use the fire panels in uh the um uh I don't even know what this is. 181 Sawyers Crossing Road is a but we discovered that that >> that might be the bridge. >> That's the bridge. >> That's the bridge. That's the bridge. We don't use the the alarm panels there. There's a bridge there. Two lines there. There's a line at the um at the bridge by um the fire station on Main Street down the road here. There's one at the Westport Village Road that on the on the Slate Bridge. There's one for the Carlton Bridge. Those are all ones that were supposed to be cancelled. >> Can these all be cancelled? Like by the way, it's got nothing to do with the contract or not. >> Yes. Yes, I can. >> As as easy as just calling them and saying take these lines off of >> Actually, there's a there's a form he sent me. The Fidium guy sent me a form to fill out to cancel those >> which with your approval I will do. when I get in the office on Friday, I'll do that. Um, >> how did this come alive? How did this >> Well, the fidium guy called >> Fidium guy called me and said, you know, we need to review your service. I think there's some lines that you don't need that you're not using. Uh, but we need to review your service and because we need to upgrade from copper to >> And then you went to Theresa and asked for that. >> Uh, no, this came from him. >> Oh, that came from him. >> Yeah. And this is the the prices we're paying for each of these phones. and the numbers and the locations and some of them we we've been looking for who we were paying for the phone at Richardson Park for instance it's on here and that's a a copper line that we're paying them for that we can change to fit him and he says it's it's cheaper to go with the fiber anyway so if we go to fiber we're going to save some money and we'll have better service and so on and Chris was on the line to advise us and I expect to lean on him a lot to advise how we go forward on this, but that's where we are on that. >> So, when he started that conversation, you seem like you wanted to add something to it. If he answer your question and the conversation, I'll talk about it after >> and we do have a proposal from the Fidium people and um I do have a copy of the contract with the first light people here which I'll >> um that's the phones. That's my first. So, you're all going to follow up and cancel those. >> I will I can easily do that um for those those ones that are clear. And then the others are ones we are using currently and I think those are ones we want to >> upgrade. >> But then the then far as the police station goes, there's some phones in the police station that are copper right now and I don't know particularly if if we're using them or not. We need to figure that out as part of the transfer and Chris is going to work with us on that I think. Where is the update on the new phones? What's going on there? How long where do we stand with the the new phones? >> Well, Christine finished an analysis of what our phone usage is. >> And she's put that report together and sent it off to >> that helps us come up with the plan we need. >> We need to know which phones need to be a special the higher grade and which ones be the lower grade. >> She sent that over so Tanya can order. >> So, it's in movement. >> Yep. And we're shooting for a 911 a 911 target date. >> That's what we're actually in and start bringing phones in. >> Yep. They want to be set up. And as Jay mentioned, they want to have a few days of simultaneous working because as of 9:14, our contract with Sang ends. >> Wow. >> And then there's then there's this other that Lisa's been working on. >> There's so many layers to to this stuff. >> Yeah. fire station police station. >> So, she's working on a company called TCE, and I I don't know that she's gotten what she needs. >> She got a contact finally, but she doesn't have the numbers that they bill us for. >> Yeah, they won't give us the numbers. They won't give us a copy of their contract. So, we're probably in a in a monthto-month situation now, unless it auto renewed. >> Yeah. Don't know. >> How we doing? So that so in terms of the phones everything is moving forward. >> The um other thing next thing to mention is that the um in terms of the hazard mitigation thing that we talked about last week. Um there's now a form for people to provide input on hazard mitigation that's on the town website. It's the first item on the left on the community news section of the the town website. And I just want to make sure that people listening and uh if they wish to fill out that form, they they should go to the town website to do so. I want to announce that >> we all got an email with that. Did you get >> Yeah, it's a survey. >> So, we can we can answer the survey. And the the third thing is what you and Megan dis discussed about the the actual cost of carrying inactive fire department members on the on our on the roles that we we have to pay for disability insurance. Uh, and it's important for us to manage those rules so that we don't pay as much don't pay too much for >> Well, there it goes back to what I read through. I mean, there it goes back to the roster and and how important it was to have that updated. And then when I read that, I went, there it is. You know, there's some of the reasons why >> and and I was going to call Eric today, but I figured I'd wait till we discuss it tonight and have him make sure he updates it and give it bring it to you and have it brought to you. And if you want, I can call him tomorrow and make sure he brings you an exact who is and who isn't and everything like that up to date of today. Because when I asked, can you go get that? Do you remember? Right now, cuz you supply it to me. And then there was questions about certain people on there. Do you remember? Nick went, well, wait a minute. There's this and that. So, we need to clarify that >> and and he needs to understand why >> it's it's going to be real money in a few years. >> That's right. So >> not that it's not real money now, but >> but eventually it's going to >> this is going to be from now till 2030. >> They're going to gradually raise, right? >> Yeah. But to get to >> it's 2400 per person. Now it'll be >> 9,600 >> 4,800 and and get to 9600 >> for each person. >> For each person >> each on call person. So if they're not if they're not participating and then as Megan mentioned there's other things like pagers and equipment and everything else. >> It's incredible. So go ahead. We're really going to have to look deep into this. This is you're looking at how many we got on call. Right. >> You just if you got 10 people that's 100,000. >> A few years. >> And it wouldn't change if they were full-time. We still have to pay the same amount. >> Wow. Okay. So do you guys want me to do that? call Eric and tell him to get us >> to one of us at town. We need that >> and I'll get it to get it to you. >> Well, Bill's in there tomorrow. I'm in there. >> He's working on it with Megan. >> Oh, you already done that? >> He's working with Megan. >> He and Megan have been collaborating on this. >> No, you don't. >> The last thing I have is that >> I I do think the fact that we have that email, you might want to have a conversation with him. >> Because I'm not sure if he got that. >> Yeah. Well, I had a conversation with him today and I told him that um sooner than later to get everything out of the center station. I said, "You got to go in there and get everything out immediately." I said, "Get right on it." So, anything that's going to be left in there in a few days, we're either going to junk or figure out. So that that nice segue into my last item is that we we are to to help Steve Bidd out. We need to start thinking how we want to go what we want to have as part of phase two of the town hall renovation. U Joe has gotten a he's getting a quote from um Grayson about uh putting a bathroom down there so that we didn't have to so we don't have to have the Lula to make the the the space ADA compliant. And if we have a bathroom downstairs, we don't have to have a lift to get people upstairs to the bathroom. So, that would seem to be a an item that we need in order to expand down below. And we don't know how much we'll have left over from the money that was approved last spring because we hasn't we haven't got the final bill on the staircase and so on. But any money that's left over could go towards some reorganization of the space to make office space or or whatever down there. But we also want to look at what we want to do there. Bill is also interested in removing the pillars in the in the bays to make that room open and so on. And we need to look at that as a possibility, but we need to come up with something >> for Steve for the CIP >> and we need to do that within a week or so. So he wants all the stuff by the 11th of September with a little bit of cleaning waiting. >> So then so then we should schedule like a sit down with Joe and us and and maybe get those plans that we had to even look at. Right. And so when are we going to be able to do that if he needs it in a week? Well, Steve Steve said when he he asked me to send this out to all the department heads, which I've done, >> and he asked me to do that and he said he thought the the 11th was a good deadline date, September 11th. And he said, but it could be later, like the 18th, but he was hoping it would get in by the 11th. So, I left it as the 11th. And I hope they're not listening because, you know, but it may be that in our case, we could go a little longer since we have so much trouble. We have to do it collectively. We can't just have one person decide all this. So, we have to talk about what we want as a board in the in the basement of town hall. And we don't have an administrator to chime in. We don't have that kind of stuff. >> When is the first CIP meeting again? I thought I read it. Um, who is who is going to be on that? Because I didn't see you. Were you on that mark? Cuz I didn't see him sent to it. It was me. >> So, I guess it's me. >> Well, we had to sign it tomorrow. It was mom. >> But you can both go cuz this is this is pretty critical. >> What time is it tomorrow? >> Well, no. >> I thought it was tomorrow, wasn't it? Or >> we got >> No, it's a Monday. >> It's Monday. It's this Monday. >> It's a Monday. >> Water sewer meeting tomorrow. >> Right. That's I'm getting confused. >> But the Jeez, I won't be going to Main Street tomorrow. >> We're supposed to be at Main Street >> I know. I have a tow tomorrow. I got to do that. >> It's Monday for the >> CIL. I saw the email. Ask Katie to >> It's Yeah, it's Monday, Mark. I want to say um I'll call Steve, but I'm pretty sure I read Monday, but I was looking at it who is from the select board and I did see Mike I was on there, but I thought it was Mark, you know, and I asked Steve if he'd minded if I just said even if Mark was on there. Um so, are you going to >> Yeah, I'll go. Good. >> But but I I'm curious what other people think. I mean, I I would like to see myself I'd like to see us come out of this with a a couple office spaces down there um in in a break room. But >> yeah, but we have other issues, too. We have a water issue, right? Bathroom now issue. >> I think the bathrooms are important, >> But spending $100,000 on a Lula doesn't make sense right now. >> And when you say money left over, I think we put what? 200 and we're probably 120 in >> right now, aren't we? We're >> closer to 80. It goes because there were some change orders. >> We have we just approved two change orders. >> Two change orders. So it's it's up to about >> 10 to 20,000 to play with and that's not going to be enough I don't think to make the bathroom, but we have to see what he comes back with. >> So what's the issue with the bathroom that's there? Cuz it's there >> and what we need to knock that down. >> Yeah, cuz it needs to be handicap accessible. >> I got to or put a lift in. >> I see. So, it's it's basically um that that's more of a priority for the warrant or whatever for the CIP, whatever. We have to think about that. >> All right. So, when are we going to find time to do this? >> Yeah, >> that's what we got to figure out. I mean, we're really eating a lot lately, but we have to find some time to have Joe. Maybe we meet there, right? We should have a meeting there. What do you guys look like next week at the beginning of the week? >> Monday because of the CIP and that CIP 10 >> and I have a governance meeting. >> Monday's not >> When's that >> on Monday? >> What time is that? >> 8 something >> cuz I'm wondering if we could fit it in with cuz you know they're going to be there Monday. CIP, >> What time is the CIP Monday? Huh? >> What time is this here? >> 10 o'clock. I want to say >> we're at >> downstairs. Okay. Thank Don't I'm just remembering I saw 10 o'clock. we're obviously we're not going to have nothing for Steve for that meeting. It's just a kickoff thing. I think Steve is doing getting everybody together. And >> if you two are going to be at that meeting, would you you know the meeting after that meeting? Is there time when we all could gather? >> Well, that's what I was thinking. You're already getting 1 hour. >> Oh, yeah. He won't go over an hour on that. We could say 11:00 on Monday. Meet downstairs. But now he has a government. >> That's not till later on in the afternoon. >> Governor is governance is in the >> So your day is no golfing, no Red Sox, no nothing. >> Yeah. Thanks. >> Okay. Put that in the minutes. >> So So 11:00 >> 11:00 on Monday, I guess, right? >> I could still play nine holes of golf and get there. I was done at 8 8:30 this morning. >> Oh my god. >> I had to pick up my wife, so she's getting to be careful. >> Anyway, you you have an appointment. >> Yeah, but I Let me see what mine is. But keep this. Do it at 11 cuz you know what I mean? >> Cuz you guys can fill me in on it if you guys need to. >> We're going to We need to all be together. >> Well, to make it a final decision and we need to discuss it and all the pros and cons, right? That's what you're looking for. >> We got to get Allan. >> I'll get a hold of everybody. We'll get together and we'll get a hold of everybody. But we'll shoot for right now Monday at 11. Okay. >> All right. Unless something pops up and we we email everybody. Okay. That's closer to that you've done. >> That's my administrative update. >> All right. So, where are we after that? >> Well, we got to see one quick question for you guys. That's all I can give you tonight is >> I I I've purchased 50 uh chair covers myself. I just cuz Katie [clears throat] told me that I had to go through the select board in order to purchase them. It was 135 bucks and I just want to know if there's a way that I can get refunded for those chairs. That's all. She said I had to go to it for $135 and I was like seriously >> and you already did it, bud. >> You already purchased them? >> I bought them. Yes. And if you can't pay >> See how you put pressure on us? >> Well, you buy them and then you ask for them. >> So I don't put pressure on you. So I got two big events coming up here where I need more than 100 chair covers >> and I don't have them. >> Are they they match the other ones? >> Yes, they're identical. Yes. So, and there's, you know, a bunch of torn ones that are coming up. And plus, I'm taking the ones that I'm using and washing them and doing that also. So, that was just my quick question. What do you guys feel about um the chair covers? >> Check the budget. >> We got to look at the budget. >> Yeah, we got to see all the revenue. >> We'll have to get back to you on that. Let me look in because we have to check the budget. It's over there. But it's $135. >> I can get you a receipt, too. There is a there is a requisition form. There's a requisition form to fill out for anything that you want to have paid from the town hall. So there you can get one from >> Katie and Maggie. >> Yeah. Katie can get it for you, but it's on the website as well, but but you can you should >> it it just you list the expenses and you put the receipts on the back of it and you turn it in. Just provides a paper trail for our auditors >> if we're going to pay you. If we don't pay you, then we'll get you'll get it back. If you don't maybe then it's a donation that I made to them all >> Right. But but you could get started with that by organizing your receipts on the back of that. >> I don't know if Sharon's got in touch with you with the committee is for a list of things that they were going to ask you for um you know like the the snow rake and the electric. Hey, she done she generated a big list of stuff >> she was given a form for CIP to for the capital improvement thing to fill out and I'm sure that's on >> she did that. Yeah. >> And Joe has solicited quotes for the snow breaks. >> Yeah. For that stuff and the electric and stuff. >> Mhm. >> Thank you. Appreciate it. >> Have a great night. >> You too. >> Just have a quick non public. >> Make a motion to go into non public. >> All in favor? Under I'll second it, but under what? >> I just drawing a blank. What somebody else have I done publicly want to do? I don't >> Well, I did want to before you get into that, I went to say something and you said he was giving the administrator update. >> I'm done with that. >> Stop me. I just wanted to give you an update on the phone call I got from Joe, the chief of police. >> About the school this morning. What happened over there? >> Oh, yeah. We heard. >> Yeah. So, you got it all >> or Allan and I. >> All right. So, we're going to give it till Friday. I'm gonna go meet with Joe tomorrow in the morning because well, not in the morning. I got to sign that paper for the radar, right? So, I'm going to sign that grant and then he's going to tell me. His first opinion was opening day, everybody drives the kids to school. It should wean down. I don't see it. I think we're going to have an issue that we're going to have to So, my question was, where does the select board step in? Isn't this the school, the superintendent, and maybe you? and then if you guys can't come to a decision of making changes because it is a um a safety issue. So I think it will end up on our lap. >> I I I would hope that one of the things they'd look at is adjusting the opening times for the two schools because that's the that's another way of adjusting the opening times. Now it may not be convenient for them >> but >> they are adjusting. >> But if if you've got >> high school to Mount Cesa >> Yeah. But he's thinking Mount Caesar first through third 3rd to six an alternating status that makes >> I'm not sure how that works. >> That would change the whole day for the teachers. That would change a lot. >> Yes, it would change a lot for the administrators and all that. But that's one way of doing it is to look at your populations and decide maybe maybe the junior high comes in a different time than the high school, whatever. >> We won't discuss it until it's put on our lap, but I was just giving you a heads up. There was a situation there, so you were all aware of it. The traffic was back down 32 [clears throat] past your house, I think, and all the way up over the bridge and up that way. >> It was It was backed up. >> I'm all set. >> You don't have to do it? >> what happened? >> Totally spaced it. >> You solved it. >> I should have I should have written it down. >> Do you honestly spaced it? >> Really? >> Well, we'll >> I'll give you those memory pills that I bought. Make a motion to adjurnn then. >> All in. >> Oh, wait a minute.