Town of Gorham, NH: Main Street Pedestrian Improvements Project Public Hearing 5/11/2026
SPEAKER_1 opened the Main Street Pedestrian Improvements Project public hearing at 6:10 PM to discuss alternatives using $2.4 million in federal funding, requiring a 10% local match. Eric Grenier presented four design options for sidewalk rehabilitation and reconstruction between NH-16 and Ed Fenn Elementary School. Alternative 4 exceeds the budget, while Alternatives 1, 2, and 3 remain within funding limits. Board members suggested forming a committee with representatives from the snowmobile club, business owners, the town, and the state to address motorized vehicle usage on sidewalks separate from the grant-funded pedestrian improvements. Several residents expressed concerns that losing snowmobile access would impact business revenue. No formal votes were taken on project alternatives. The meeting was adjourned by motion after public comment. Source: https://www.youtube.com/watch?v=lHG-23J4RFo
Okay. Hello, everybody. Nice to see you. Thank you for coming out. So, I'm going to open the public hearing at Where's the clock? >> It's uh 6:10. >> 6:10 and um be having a presentation by Eric Grenier from AGB about what's going to happen with the sidewalks. And after he's done his presentation, I I will open up the meeting to public comments and questions. If you could keep them to 10 minutes 2 minutes or less. No, not 10 minutes. 2 minutes or less that would be very much appreciated. I don't want to have to stop anybody in mid-sentence. So Here we go. >> Well, Judy, if you don't mind, I I just wanted to step in and make sure we have a focus cuz we have like uh Caitlyn Sam, we have Eric. They're all from AGB. They're all highly trained professionals, very extensive. Um So this meeting as it was posted um and legally required, it's for pedestrian improvements on Main Street which we're all going to get into. I know there's been a lot of interest about the snowmobiles and that is certainly something the town values and wants to talk about. Um but it can't be the focus because sidewalks, you know, motorized things, sidewalks, you know, aren't for ATVs and uh dirt bikes and motorcycles and and other sorts of things. But we have heard directly and indirectly there are concerns. And and I don't know I know Judy has thought a lot about this as well as the board. If you just want to just briefly state kind of what you're thinking as far as Uh we have one more selectman coming in. There he is. Um just so we can get that taken care of. >> The um the thinking was we talked about this about a year and a half ago. We either um keep it open or like that. >> Can't hear you, can't hear you back >> Oh. >> okay. So >> Where is Mike? >> A year and a half ago, 2 2 years, we had a meeting with the um with the business owners, the business owners, the snowmobile club, the state, and the town. >> At the TNC. >> At the TNC. And we discussed the issue of snowmobiles at the time, and I had suggested at the time that um we had plenty of time to work on a solution for this issue. And I had suggested that a committee be formed with all of these entities um being part of the committee, and since then I've heard nothing. So, what I want to do is again suggest that a a committee be formed with representation from the snowmobile club, the business owners, the town, and uh the state. We had um fish and game there, and they had some good ideas, and um so with that being said, I think Bob would like to um be on that committee along with John Beezhu. >> Yeah. >> There he is. >> Oh, there you are. So, uh if Bob wants to say a few words about that. >> Hi everybody. So, uh for all of the men of Noble, I'm Bob Ardana, uh one of the selectmen. And I thought it was very important that we um that we uh put a committee together to specifically get the involvement of community, which is which includes obviously our taxpayers and our business owners. It's very important that we support our business owners and our community, and uh find out what we need to do to help everybody out to make this option, you know, viable. It's never going to be 100%. If we can get to if we can get to 80 an 80% solution, I think that would work. But, it's not a one-person decision. In order to make that happen, we need the support and the feedback of our local local restaurants, convenience stores, gas stations, as well as whatever residents, you know, we have that may or may not be impacted, but we need everybody to find some common ground to start building it a solution. And the only way it's really going to happen is with community input along with our businesses because we really need to support our businesses because they are so dependent on the snowmobile traffic. But, also be aware I appreciate that. And also be, you know, also be aware of the the impact they have on on our taxpayers. And not all of the taxpayers are are OHRV or snowmobile enthusiasts. So, they have a voice as well. We need to be sensitive to that, open to that, and and hear what they have to say in the hopes of finding some common ground and now they're part of the solution and everybody takes ownership of a solution so we can move forward in the hopes of, you know, prospering local local businesses and bolstering the the needs of our community. Hope I said that appropriately and made a little bit of sense. Um does anybody have any questions for me if the chair >> Um Based on what Bob said, that we're not going to please everybody 100%, but we'd like to try and get there. Um What uh It just went right out. In and out. But, anyways, a a committee that represents everybody is um they may come to a conclusion where there might be a little bit of inconvenience on both sides. And that's what we like to try and keep it at is an inconvenience, not a major problem. So, getting you know, getting this committee together is crucial to solve the problem. >> And our last one before I let Eric take off, um I I know the town is committed, you know, the East Field Snowmobile Club. If the um Presque Isle Trail Riders, another club, wanted to have a snowmobile fest weekend, you know, get a permit and we'll make a snow road. You know, it's a long weekend, a great time to do that. Great snow road, great permit. The town has no issues with that. With the the the danger of getting too much crossed in connection with this sidewalk project and discussions about snowmobiles is that this is a $1.6 million construction project with a you know, $100,000 plus dollars of engineering. And DOT and where this is a pedestrian it's a grant. It's all for pedestrian so it's a multi-use trail. And if we all of a sudden if the town said, "Oh, yeah, you convinced us. You can keep using the snowmobiles." Thank you uh federal government, taxpayers, and DOT for giving us a pedestrian sidewalk, which we intend, you know, to to use for snowmobiles all throughout the season. That is would not be good. And we jeopardize perhaps losing that 1.6 million. And in order in the future, we would be known as the community that you don't get money don't give them that million dollar project. Don't because they violated the agreement. It's like if we had land for wellhead protection, but then people say, "We've always gone out there and had bonfires and had did dirt bike races." Well, it's wellhead protection now. You know, we can't do the dirt bike race, you know, across, you know, the wellhead protection zone. And if we did, then that would that would be a big big problem with beyond Lee Terrell being upset. Um it would be a problem there. But yeah, put put my name >> I just wanted to say that in 2010 there was a study done on the economic uh snowmobile economy. >> Yeah. >> State grossed $583 million a year from that. >> Mhm. >> So, I don't think that they're against snowmobiling. >> No, no, no, no. >> With that type of income, in fact, I don't even think they probably could have afforded a grant of this size if they didn't have this type of income. >> Yeah. >> So, I believe that they're in full support of snowmobiles running through the towns to earn this sort of income for them. >> So that they can get >> grants like this. So, it's it's sort of a give and take. >> Oh, and and as a compromise there >> And when we when you mention that uh >> Peter. >> You know, >> Do you want to save this for public comment? So that >> I I could address it maybe real quick cuz he raised a good point and then I promise we'll do it there. >> All right. Yeah, he asked if if there was any questions and no one ever got a chance to raise their hand. >> Okay. I just I didn't hear your part. >> So, I don't I don't see how the state could turn around and tell you that you didn't follow the rules and they're going to take away your grants when the grants come from money provided by snowmobile. And I'm talking 16 years ago they made $586 million on snowmobiles. So, I I'd like to see the documents that tell me that the state has certain restrictions to allow you to have this grant. And is there any >> Yes. So, the quick short answer is this is a pedestrian like non-motorized sidewalk. >> Oh, it does say non-motorized? >> Yeah, you can't you can't have a four-wheeler on the sidewalk. >> Oh, it says no four-wheelers. >> Well, this is the federal money is for a pedestrian side It's not a multi-use multi-use trails. >> Okay. >> You know, they're hiking, biking, and ATV, and all that. Um so, as the DOT quickly explains to me, somebody in a wheelchair or somebody who's elderly has the expectation to be able to walk on a sidewalk. And then when they slip or get hurt because of the snow not like you all, but somebody from away is is uh acts inappropriately, then all of a sudden um somebody has an injury. My grandmother got hit by a snowmobile or had to jump in a snowbank or slip because of the icy sidewalks. Well, you how come you aren't maintaining the sidewalks? Well, they have to be snowy. Then the town has liability. And our insurance company won't cover it because we let people drive mechanized devices on a pedestrian sidewalk where a pedestrian should be able to think I can walk down this without dodging a snowmobile. So, >> It's been going on for much longer than that. >> I've been alive 40 years. >> Oh, sure. Yeah. Yeah. >> Yeah. >> And and I've never heard any complaints. Um Well, maybe I have heard a few. But, you know what it is? There's no signs of the issue. I think the town is Judy said is trying to make this uh a successful win-win for everybody. And there isn't going to be any change today, tonight. Um And and with that one of us deferred to >> You're you're you're the DOT specialist and I deal with that every day. >> Is there that specific Well, you were in the same meetings I was. With that saying that that's no no good, that you can't do that. >> So, the funding that the town has received is for the development of pedestrian >> Yeah. >> I think the framework for the funding is in the development of pedestrian improvements. We're not developing a snowmobile trail, but we're developing sidewalks and pedestrian pedestrian improvements, crosswalk improvements, whatever. You know, whatever we end up landing on, that's what the funding is to develop. >> Right. >> Um so, that's sort of the the premise behind the funding that the town received is that it is for the design and construction of pedestrian improvements. >> Yep. And is is there's going to be a lot of pedestrian improvements? It's not really just sidewalks. It's it's lighting, it's crosswalks, it's redesign. And uh Eric and his team did a really good job developing um some options for you guys to comment on. Thank you. Sorry. Eric. >> All right. Thanks everybody for coming. Um And as it's been mentioned, this is the second uh public informational meeting for the Main Street uh pedestrian improvement project. Um I'm Eric Renner, HTB Engineers, and I'm I'm by uh Katie Gillette, um who's going to assist me tonight. Um so some frequently used acronyms that I might refer to tonight if uh you know, Federal Highway Administration is a little bit long. So these are if I refer to some of these acronyms, you know, FHWA refers to the Federal Highway Administration. NHDOT means Department of Transportation. CDS Congressionally Directed Spending. That is where the funding for the project came from. It was an earmark from Senator Shaheen's office. And LPA, Local Public Agencies. That is the requirements that we are required to follow um for the design, permitting, and communication for the project. Um we have a set of guidelines that we have to follow as engineers um for the design and permitting of the project. And LPA is sort of a um acronym that gets used for all the guidelines that we have to follow when we're implementing these projects. Project Administration. Um so the project is funded by Federal Highway, but administered through the Department of Transportation. It is a 90% 10% share breakdown. So 90% of the costs are funded um through the earmark, and 10% uh local match is the cost breakdown. So for every dollar that's spent um on the project, 90 cents is funded um by Federal Highway, and then 10% is from the local match. Uh tonight we're here to, you know, provide sort of a general overview of the various alternatives that we've developed um with input um from the select board um regarding the improvements to the project. Uh the goal is after this meeting um the feedback that we gained tonight will help the town proceed with uh settling on a what's called a proposed action. So, tonight we're going sort of lay out the alternatives that we studied um and get your feedback on those alternatives. So, nothing is set in stone uh tonight so to speak. >> There's going to be granite curbs though, that is set in stone. >> That yeah, that is set in stone. That is set in stone. It is stone. Uh the funding does require the town to follow uh the detailed LPA process. I mentioned it earlier. Um those are the requirements that are set forth that we must follow from the DOT and ultimately federal highway. Uh we did help hold a public input session on September 22nd uh 2025 and tonight's meeting again is sort of the next step in the process where that first meeting we just introduced the project, kind of clean slate, got some feedback from from the folks in attendance, and then between then and now we worked with the select board um and that feedback that we received to develop several alternatives um for the project going forward. So, tonight is sort of that second meeting where we formally present those alternatives. So, just for those who were in attendance um at the first meeting, this is a general representation of the project area that was scoped as part of the original RFQ. This doesn't necessarily represent what the final project area is going to be, but this is um a representation of what um of of what that that area was intended to be um depending on where we land with with funding um as we move forward with the project. So, essentially, it's from the Route 60 intersection at the Gorham Common to Route 2 uh intersection um as you head towards Lancaster. So, those are the general project limits uh for this project. Project background: So, the town initially received $1.6 million in earmark for pedestrian improvements along Main Street. Um and then additional funds were reallocated to the project to bring the total project budget um to 2.4 million. That includes engineering, construction, things like right-of-way, all of those all of those buckets uh form that overall project budget of 2.4 million. The federal earmark, as I mentioned, was awarded through Senator Shaheen's uh congressionally directed spending process. Um the federal earmark is a 90/10 split with town match at 10% of total eligible cost, as I mentioned. Um the pedestrian improvement project is a phase of town-wide improvements to pedestrian facilities. Some of you know, we have a separate pedestrian improvement project going along Route 2 uh towards Lancaster. That is separate from this project, but sort of in the whole uh bucket of pedestrian and improvements uh town-wide. And as I mentioned, we're required to follow the detailed federal process, which is why we are here tonight and we'll be here um part of future uh future meetings. Where are we at now with the project? So, we are in the engineering study phase of the project, where we are gathering the background data, uh things like preparing existing features plans, um developing concepts, and getting feedback from you folks where we are at in the project. So, we're still very early on in the project, but moving forward with with the study phase. We held a meeting on September 22nd, as I mentioned, and tonight is the public informational session where we're going to review the alternatives. After tonight's meeting, as I mentioned, we get the feedback, and the town and HEB will work towards developing a proposed action, which will then be held another meeting where we say, "This is the project that we are moving forward with." That will be at a at a separate meeting, but will encompass all of the feedback that we've gathered today in the alternatives that we studied today. We're hoping to wrap up engineering study soon, summer 2026, but you know, following this meeting, we're hoping to wrap up engineering study quickly so we can move on to the next phase of the project. The initial public input session, some of the key takeaways that we received from feedback at Fenn Elementary School, crossing safety. And similar to to at Fenn Middle High School, crossing safety. US Route 2 and NH 16 inter-intersection crossing safety, that would be at both the north end of the project and the south end of the project. I think one of the main takeaways was deteriorating sidewalk conditions. You know, the sidewalks are are in need of improvement, ADA compliance issues, and whatever we implement moving forward, you know, maintenance is always a consideration for new infrastructure. So, we want to make sure that things are built to last, so to speak. So, just some representation of existing conditions within the corridor. I'm sure a lot of you are familiar with it, but we have a lot of pedestrian crossings, crossing side streets, and and the highway. We have existing sidewalk and curb conditions throughout a lot of the length of the project. The sidewalks are in our need of improvements. So, we have deteriorating sidewalk conditions, some areas where the curb has either leaned over or settled. We want to focus on bringing those bad infrastructure back up to compliance. in the corridor. Other things we have to consider in the corridor, we have retaining walls, some fences. We have on-street parking, which was a large consideration for the project moving forward. You know, what do we do with on-street parking as it impacts some of the other alternatives that we might talk about tonight. We have some trees you can see that are, you know, growing within the sidewalk where some of the roots are starting to or have um you know, increased the deterioration of those sidewalks. Maintenance, as I mentioned, maintenance is is always a consideration when we implement infrastructure projects. Pedestrian safety, you know, it's a pedestrian improvement project, so safety is obviously a large consideration for the project. We have a lot of intersections, driveway crossings where some of the the tip downs where the sidewalk goes back to the tips down to the to the driveway, some of those are non-compliant, some are too steep. Some are in disrepair, but we have a lot of intersection and driveway crossings that we have to manage through the design and construction process. Uh pedestrian access and protection. There are a lot of businesses along the corridor, so making sure that, you know, we maintain and improve access to the facilities when we're done with the project. And then, you know, ADA accessibility is is is a large component for the project. You know, we have a lot of crossings, so making sure we have things like detectable warning plates and the appropriate tip downs and the grades for the sidewalks to maintain accessibility through the corridor was a consideration for the project. Utilities, we have existing drainage. A lot of the existing drains are located on the curb line. Um so that when we talk about alternatives and whether we're going to shift curve, move curve, keep it the same, you know, drainage and its existing location and position was um one of the major utility concerns for the project. We do have water and sewer services and some manholes in the in the limits of the project, and we do have quite a few utility poles that are adjacent to the sidewalk that um not limit, but they, you know, we have to consider them when we're positioning sidewalk, where the sidewalk's going to go, you know, cuz those utility poles are, you know, right adjacent to the sidewalk. Schools, uh there are two schools within the project area, you know, the War Memorial High School and the Ed Fenn Elementary School. Schools are are are a big component to the project. As I mentioned, local businesses, um a lot of businesses front the sidewalk, and, you know, there are considerations that we have to manage through through the life of the project, the design, construction, how our business is going to be impacted through construction. You know, we've got to make sure that people can still access their businesses. If they're within the project corridor, sidewalks going to get torn up. But we have to make sure that you know, businesses are a large component to what we're putting forth here for the project. So, you know, those are the main major considerations that that we had for the project moving forward. So, I'm going to get into a couple of different alternatives. And as I mentioned, these are alternatives that we've developed with input from the board. And once we go through the alternatives and get to the end, we'll be looking for feedback on things that you may not like, you know, things that we should consider moving forward. But none of these alternatives tonight are really set in stone. So, like, you know, the feedback that we get from tonight and future meetings will help us frame the project moving forward. So, alternative number one, I know the plan looks a little busy. Um but alternative number one is a combination of sidewalk rehabilitation and sidewalk reconstruction generally from the Gorham Common to Ed Fenn Elementary School on the south side of the road. So, what we have to do when developing these alternatives is we have a project budget that we cannot exceed you know, without a prior approval and and things of that nature. So, when we develop these alternatives, we have to try to develop alternatives that not only fit within the within the budget, but also tie into and have logical sort of ending points um for for for obvious reasons, but so alternative number one is as I mentioned, pink represents sidewalk rehabilitation and blue sort of represents um sidewalk reconstruction. Those blue areas are areas where we would expect, you know, curb to be uh modified or fixed um and areas that are probably a little bit beyond sort of an an easy rehabilitation. Um but essentially we're looking to maintain sidewalk width, which is essentially 5 ft wide, which is includes the curb. So, it's basically a 4 and 1/2 ft wide sidewalk with a 6-in curb from the face of the curb to the back of the sidewalk gives you 5 ft. Uh so, generally maintaining the existing sidewalk width. Um try to extend the project as far as we can within the available budget. We're looking at paved sidewalks, you know, similar to what's out there now. Uh paved sidewalks with granite curb. Um granite curb will be required because it's on a state route that has maintenance and it needs to be durable for plowing. Um the paved sidewalks and granite curb are generally the reconstruction elements for that. And in areas where we have identified situations um that require more reconstruction, we're either going to reset the granite curb or propose new granite curb. Um that's going to be evaluated, but those areas probably require more intense uh treatment um as we progress with the project. Pedestrian crossing improvements Um I'll show you some uh renderings of what we're looking at for pedestrian improvements, but new crossing um at Main Street, uh US Route 2 and Main Street 16. Uh some of the feedback that we received during that first public input session is you have to walk pretty much all the way to the Bourne Common Subway to cross the street if you're coming from the east side. Um so we are evaluating the addition of a crosswalk um on the east side of of Route 16. Um rapid rectangular flashing beacons, um with curb extensions at the Bourne Common is something that we evaluated. Um I can go to the picture real quick so we can get a visual uh representation. So this is a rendering of what uh an improved crossing could look like um near the Bourne Common. What we have is solar uh powered flashing beacons. You press the button and the things, you know, flash that you're crossing the street. Uh the addition of high visibility crosswalks, um lighting uh lighting at the crossings is needs to be improved in uh both directions. Um and then you know, one of the options that we looked at was curb extensions. Uh the benefit of curb extensions are they keep you out of the traveled way for longer. They let you get out in front of the parked cars. You know, this shoulder is all parked. Um so visibility when you're parked next to the crosswalk is tough for the pedestrians and the motorists cuz the pedestrians have to get out sort of beyond the parked car before they're seen or before they can see cars coming. So the addition of curb extensions um was something that we evaluated to try to improve pedestrian visibility and and access to the crosswalks along with beacons and lighting improvements. For middle high school, kind of similar similar approach. This is a pretty heavily used crossing adjacent to the school. The addition of flashing beacons, some lighting improvements on the south side of the road. This is an existing utility pole that has right out already, but this side currently has no light to illuminate the crossing. So, we have evaluated rapid rectangular flashing beacons and curb extensions at this location. And Ed Fenn crossing improvements, because this was sort of the the um northern terminus, we didn't propose curb extensions at this location, but improve improving the crossing with the addition of overhead lighting in advance of the crosswalk and addition of rapid rectangular flashing beacons, high visibility crosswalk and signage. So, the majority of the options or the alternatives that we're going to look at tonight have budgeted sort of this level of treatment to them, but looking to get through this get back on how people feel about curb extensions. I know there's you know, not not always great, but you know, trying to get some feedback on those and then some of the other crossing treatments that were proposed. All right, let me get back to alternative one. As I mentioned, the project limits for alternative one are from the NH-16 to Ed Fenn Elementary School. You'll see as we progress through the alternatives, really the difference between the alternatives is where we start, where we stop. Is it all one side? Is it try to get as far as we can on one side? Is it try to get both sides as far as we can? But alternative one is generally focused on the south side of the roadway and is currently a project that would be what is considered under budget. So, within the within the project budget that we currently have in the district. So, that would be alternative one. Alternative two is a rehabilitation on both sides of the road from the NH-16 intersection to the Gorman Middle High School. So, both sides of the road but condensed. So, it doesn't progress as far as alternative one, but it does hit both sides of the road for the length of the project. This has very similar improvements to alternative one, you know, maintaining the existing sidewalk width, paved drain curb, um and then the crossing improvements that we just went through with the with the renderings. So, alternative two is both sides of the road from NH-16 to the Gorman Middle High School. Alternative three, Uh, uh, should go back. Alternative two another alternative that is, you know, under budget or within the budget uh that we have for the project. And alternative three is to try to maximize the budget that we have. Basically, you know, try to get every dollar that we can and make the make the project go um as far as we can uh to try to impact as many uh businesses and residences as possible. Alternative three is a uh project that goes from the entrance 16, both sides of the road, to Gorham Middle High School. And then on the south side of the road from the middle high school up to essentially Union Street. Um that would encompass both sides of the road to the high school and then the south side of the road um to Ed Fenn. There are no uh sidewalks on the riverside um up in this area, so we're not proposing to add any on that side of the road. So, essentially, they stop at Mister Pizza on on that side now. Uh So, alternative three, that's that's the project limit for alternative three. And then alternative four is essentially reconstructing the entire project limit uh on the south side of the road from basically intersection state intersection state intersection. The issue with this alternative is, as we'll see in the next couple slides, is it's over budget. Uh it's over the budget that we have now. Um but it it's a very similar alternative. It, you know, maintains the sidewalk with paved sidewalk, granite curb, um includes the pedestrian crossing improvements uh, that we talked about. A couple of additional, uh, improvements that we have proposed, uh, as part of this alternative is slightly shifting the crosswalk um near the White Mountain Cafe, shifting it northeasterly, I guess westerly, uh, towards McDonald's and try to get that into that parking lot there with the extension and the addition of some sidewalk in that area there and realigning that crossing, um, to the other side of the street. And then, um essentially maintaining all of the crossings with improvements, uh to to Main Street 16. I should mention that all of the crossing improvements have lighting proposed where it's deficient. Some crossing has Some crossings have lighting on one side of the road to begin with. They should have lights on both sides of the road in the direction of travel, um, so these These improvements includes, uh, lighting on both sides of the road at that crosswalk. The southern half of alternative four is similar to the alternatives that we studied before, but essentially, um, reconstruction, complete reconstruction of sidewalk on the south side of the road only along with, uh, crossing crossing improvements that get you, uh, access to the other side of the sidewalk. And these are the uh, examples that we went through here. So, alternative analysis, um, this is sort of a summary of the different alternatives that that, uh, we have studied. So, as I mentioned, the available funding is, you know, 2. 4 2.5 million. Uh total project cost for each alternative um includes uh contingency and engineering. As I mentioned, alternative 1 and 2 are under budget. Um Alternative 3 is the alternative that pretty much, you know, maximizes uh maximizes the available funding. And then alternative 4 which does the south side full depth reconstruction from Route 16 to Route 2 um at a total project cost of 4. 16 million. 4.16 Uh you can see some of the elements here that are included in each alternative. Uh Gorham the Gorham and the high school crossing improvements are included in all alternatives. Um the Ed Fenn crossing improvements that we went over is not currently included in alternative 2 because it doesn't the project doesn't reach Ed Fenn. But a stand-alone uh crossing improvement at Ed Fenn would likely fit within that budget if we wanted to um squeeze that uh improvement into the project. And then the crosswalk addition um on the south side of 16 south of the common is included with all the alternatives as that was one item that came up during the uh public input session. And then curb extensions these this budget for alternative 1 includes curb extensions um as well as alternative 2. Alternative 3 we did not include curb extensions because we tried to maximize how far we could go with the project. So, we tried to scale back on some of those uh improvements that would be either to extend the project as far as we can. Uh all alternatives correct the deficient sidewalk conditions, ADA compliance. Um So, all of those alternatives will um you know, basically correct the sidewalk. It will improve the ADA tip downs. It will um have the proper cross slope. Um You're correcting the deteriorating sidewalk conditions. So, all alternatives will address that comment. Um and there is all the alternatives have similar environmental impacts. Uh we're more or less reconstructing sidewalks that exist. So, the environmental and utility and right-of-way impacts are, you know, considered to be minor for for all of these improvements. So, this is sort of a a summary of the alternatives. If you have any other questions, I can always go back to the slide if there's anything you want to review. So, what are the next steps? Um as I mentioned, we're going to gather the feedback from tonight's meeting and the town will take these alternatives with your feedback and make adjustments to the alternatives um or, you know, choose to move forward with a proposed action, you know, as it's been presented. And then we have another proposed action meeting that will happen where the proposed action is um released or or discussed uh presented um what they're probably doing. Uh as I mentioned, we're in this engineering study phase. So, we have to finish the the Once the proposed action is chosen, we have to finish our side of the engineering study um with the alternatives and the proposed close deliver that to DOT for review Um coming up here very soon. And then, once we receive uh design approval from DOT, we will progress with design of project. I should note that you know, all of the alternatives that we study, we present, everything that we do has to go to to DOT for review prior to moving forward with the next phases of the project. So, all of the different bureaus of DOT will have a chance to look at the project, the Bureau of Traffic, uh District, and and and all of those entities that are involved with the project. It gets circulated through all those departments. They have an opportunity to look at the project, provide comments, and provide input that we take and move forward with with the next phases of the project. >> Tentative project schedule? >> Uh as I mentioned, engineering study we're in process, plan to deliver that here in the next few months. Uh the bulk of the design and permitting will proceed upon approval of engineering study and be completed 2027. Um I should note that with the CDS funding, there is a hard deadline to complete the project, or at least the design and the engineering of the project by September 2027, which means we have to have all of our stuff wrapped stuff wrapped up by August. So, when we're moving forward with phases of the project, um the schedule for the CDS funding um is an important component, where if we have alternatives that have major right-of-way takings or um you know, things of that nature, whether they be temporary or permanent easements, um we have to balance those in concert with the schedule of the funding that was provided to the town. So, that schedule I presented here has us delivering design for final approval in fall 2027 with bidding over the winter of 2027 and construction in 2028. Um and then close out the project time. The overall project schedule, I think, you know, right now planning on construction in summer 2028. Um Yeah, likely one construction season and uh closing out the project by the end of winter 2028. That's all that I have for my presentation. Yes. >> Quick question. Can Can you go back to um option one and two, please? >> Yes. >> Just cuz I want to see where they are. >> Starting then. Yes. Yep. >> Before Before you do that, Eric, >> Yep. >> after you're done, I'm going to open it up to public comment and um questions. So, if you could stand up, come to the podium, identify yourself, and tell me where you come from. That would be appreciated. And what I'm going to do is I'm going to start on this side of the room to keep it to keep it moving along and not skipping anybody. I'll take questions from this side and then we'll move to this side. Will that work for you? It works for me. Okay. You had asked your question. >> Oh, all right. I'm sorry. I thought you went that way. My bad. Yeah. Yeah, I'm sorry about that. I thought we were going that way. >> I just wanted to set the rules before we started. >> Yeah, totally fine with >> Um all all three that one there. >> Yes. >> I can't >> So the big one ends where is that I think? This This is Mr. Pizza's parking lot. >> So >> And there's a crosswalk right there at the end. >> So from there down is resurfacing Main Street curve painting and so on. >> Yeah. >> Okay. How about number two? >> Number two is shorter but it's both sides. >> Okay. Thanks again. >> So number two they both all projects generally start the same spot. I guess you know, reading right to the left. They all generally start at the main entrance 16 U2 intersection. Alternative one goes to the elementary school crosswalk. Alternative two both sides of the road to the Gorman High School. >> So so those areas are going to be identified as like the worst but it needs the most work most of the condition. >> Yeah, so we There are sidewalks that are deteriorated kind of all sort of over the place I guess you know, there are certain there are some sidewalks that are closer down towards Nashua's that you know, are in in need of repair. We tried to present a project that was let's say cohesive rather than sort of jumping around but that you know, could be something that we discuss moving forward but you know, each each alternative was sort of a condensed point A to point B improve the sidewalks in this area and then yeah, and be done with it because once you start jumping around you know, you lose efficiencies with construction and you know, the traffic control. You have it all set up, it's great, it's perfect, and everybody can um you know, everybody can can be through the area or two-way traffic around the work zone. But if you start, you know, bouncing around, things could get more expensive, but we tried to proceed in a manner that had a cohesive sort of uh project. >> Any questions or comments on this item? Nobody? Jay, do you want to talk? >> Identify yourself and come up to the podium, please. >> I got to go up to the podium? >> Yep. >> I tried to get Brian to do it, but he was too fast for me. >> I got I two questions. One one I don't think is really a big deal, but are you are you going to encroach into my entrances? >> No, so we're I know I know you you you have the the garage, right? >> Yeah, I don't want my entrances encroached into. I don't mind you using what you got, but I don't want to lose no entrance. >> No, what we're planning what the project proposes to do is maintain the existing curb line. >> I thought so. >> on the road side. >> Fair enough. >> Once we start moving curb, >> I'm good. >> I'm good with that. >> Perfect. >> Second second thing is the really reason why I'm here is because I talked to Pete, didn't get much of a response. I talked to Judy, who told me to come here >> Yep. >> about parking on the street. There's no striping. I am inundated with liquor store customers in my parking lot, and people pulling in talking on their cell phone, and I got no place for my customers cuz they think that it's they think it's a breakdown lane all the way down through town. They're scared to park out on the street, so they pull their truck in with their camper, their motor home, and they block my whole place all summer long in front of the liquor store. >> Yeah. >> I need some striping on the street. >> Okay. >> And if it's going to be going to the DOT, it'd be a good time to ask >> Yep. >> for striping on the street. >> Yeah. >> Even if it ain't part of your project, >> Sure. >> get it approved and then the town will do it. >> Got it. >> But any town that has a successful downtown business, little kid, anybody, stripes their damn business district. Gorum town does not stripe our business district. So, you come down through town and you think it's all breakdown. And this business is and places they're doing business and people don't dare to pull over and stop. >> Yeah. >> They'll talk on their phone. Yeah. That's all I got. Appreciate it. >> Yes. >> We did call you last time. >> We proceeded with not trying to eliminating any on-street parking, sort of keeping that curve. I know what you're saying. >> I don't want to eliminate it. I want it installed. I want parking stripes. I need some stripes. So, people say, "Oh, there's a whole striping." You tell everybody where they can park. Don't park here. Don't park here. Don't park here. It's red. Don't park here. It's yellow. Don't park here. But you don't tell anybody where they can park. >> Yeah. >> That's my point. >> Yep. >> And that's it. >> Got it. >> Thank you. >> Thank you, Jim. Anybody else on this side to speak or comment? Really? You did a good job, Aaron. How about this side? Brian. >> Brian Well from Bangor Street, Gorum. And also president of the Presidential Rangers. Um this is what I was hoping to see tonight because I've been asking for years on what's happening. Is it a total I heard rumors it was a total redesign of Main Street and they're going to stop all snowmobiles from going up and down Main Street, which is not really what I'm seeing tonight. From what I'm seeing tonight on alternative one and two, it's not going to affect anything that we're riding. In reality, maybe a little bit heading up towards Mr. Pizza on the south side of the street, which that we can get around that. You know what I'm saying? So, I'm really confused on how this all became about about we're closing down snow the streets to snow. That was the word I got well before you were here. Going back to Denise. >> Depends on how long with the project is. What what it is cuz you're right, if it's >> Well, I don't know if anybody in this room wants to spend more money than the budget. We can't afford our taxes now. >> Right. Yes. >> And and you can ask businesses that. >> Oh, yeah. >> As well as the homeowners. So, I don't I don't think we want to see that. Um I would be glad to be a part of the committee um if that happens because I do have a lot of other ideas on how we can get snowmobiles off the sidewalks a little more cuz it's not ideal. Like we all understand that. But we've been allowing it for over 35 years. And the businesses, some of them rely on that business in the winter to be successful. You know those cold January days when no one wants to leave the house, guess what? Snowmobiles are out of the house and they're going to the restaurants. They're the only business they get some days. So, it's very important to these businesses that we do, you know. >> So, that's why it's very important that we have a committee to study all of it and get input from different sides of the fence. >> Absolutely. Yeah, and I I agree. And like I said, I do have some other ideas on what we could do. >> We have ideas, too. >> Um so, yeah, I I'd like to be part of it. >> But with that being said, Brian, it's it's going going um it's not the town's responsibility to put this committee together. It would be snowmobile club >> Mhm. >> um business owners the state if they wanted to participate. >> Sure. Yeah. Um >> Just just so you know that so if you don't hear anything about a committee, then start something. >> Yeah. I'll work with you guys to maybe get that going. Um you know, some of the other areas that we looked at here even south of or heading towards Maine towards the golf course, those sidewalks are in rough shape, too. Um you know, down the road is it going to be as easy as uh stripping the pavement off and repaving them? I don't know, but that's something in the future. Um but no, that's all I really had to say because, you know, a lot of people here tonight were worried that we were going to lose access. And you know, from what you guys are saying with the grant money, it doesn't allow it, which isn't 100% true from the research I did. The grant from the state and the feds is you need to maintain and plow the sidewalks. It doesn't say you can't ride a snowmobile down it. It just doesn't say that from what I've gathered. So, that's something we should look into. We don't need to ride on the sidewalks down here. There's There's no need to. >> We don't want to. >> We don't want to. You know, it's it's not the area for it. And I agree, I think, you know, the option either one or two are stretching it to get that downtown area where all the a lot of the businesses are looking better and more walkable. Um I think it's great. You know, I think it needs to be done. And I I would also like to see addition of a bike lane in some of those areas. I mean, a lot of people ride bikes now. Um I think that could be important, too. You see that in a lot of lot of other communities. They have designated bike lanes. >> The one I think you want to take that? >> I'll I'll take that. >> There's a slide for that for that I had a feeling it was going to come up. Um so we took a look at Let me get to it here. I had it up here somewhere. So, we took a look at um let me take a step back. Direction that we have received is one maintaining on-street parking. So, how do we come up with a homogeneous use in the corridor with on-street parking, bicycles, uh and traffic? So, right now the existing travel lane, so yellow line to white line is 11 ft. Generally, 11 ft and then from white line to face of curb is 11. Uh excuse me, 10 ft. So, you have 21 ft really to work with. Uh throughout most of the corridor so there you have you know, dips and dips and dives. Um the guidance that um AASHTO has out um is really you need 10 and 1/2 ft from the face of curb to the outside of the influence area. So, you don't have things like door strikes, you know, people riding in the bike lane, someone opens their door, um you know, and then and causing an accident or they they have to divert out into the traffic to get around a door and all of a sudden you have a vehicle uh a vehicle issue. But, really what you need um this bike lane if you incorporate parking, a buffer, a bike lane to the travel way you need 14 and 1/2 ft. You got to move the curb back. >> Right. >> You got to move the curb >> And it's got to be on each side because >> Right, you got to First Yeah, exactly. First, you need it sides. >> Right. So, it's just like you wouldn't >> It has a large impact with number one, moving that curve and that whole sidewalk would have to be shifted over a couple of feet. >> Yeah. >> So, now you're removing all the curve, you're putting in a new curve, you have drainage that's no longer on the face of curve, it's offset a couple of feet. So, we did evaluate um you know, the addition of a bike lane for the project, but with the you know, with the limited funding, with you know, with the tight schedule, I believe you know, the direction that we got was you know, pedestrian pedestrian uh sidewalk balance, you know, getting getting those things up to up to compliance as far as we can. Um but yes, we looked at you know, what the impact would be if we're trying to add a bike lane. >> Okay. I get it. Makes sense now. Yeah. That's all I had for now. Thank you. Bye. >> Anyone else? >> Uh you can go ahead. Uh excuse me, Casey. My wife and my wife Suzanne and I live on 196 Main Street across from the Royal Oak. So, I'm just guessing just because of the limited amount of money that you had, you just had to pick and choose like the worst areas. Uh we're not getting sidewalks all the way down Main Street both sides, right? So, what was the criteria just to decide like the really dilapidated areas were the ones that really needed it? >> Yeah, I mean, we tried. I understand that, you know, it's some you know, some of the sidewalks within the project area are probably okay, some of them, but yeah, it was uh trying to I mean, there was no like decision matrix on you know, which side like does this sidewalk get touched or does that one I want to knock get touched? But we tried to come up with sort of a uh cohesive project that, you know, the schools was something that we got a lot of feedback on initially. Uh the the warm common crosswalk is is, you know, crosswalk that's heavily used all summer long. Um so, we tried Like I said, we tried to frame a project that kind of captured that whole area. And that's kind of how we proceeded with the development of the alternatives. Uh that doesn't mean that there are other areas that need attention. >> Oh, okay. >> For sure. >> I get it. So, this wasn't enough to do the whole thing. >> No, and I think that was the the goal of alternative four was, you know, essentially how much would it cost to just reconstruct one side of the road from point A to point B. You know, total project cost, I think in my matrix I had somewhere else 4 million. Um you know, that that's a full reconstruction. That's new curb, new new, you know, new uh you know, new curb and sidewalk, but the project budget wouldn't sustain full sides of the road for the entire length. >> Right. Okay, so the really dilapidated areas are going to get the attention then. Okay. >> Yeah. >> And and I will add, you know, HEB does a good job with their cost estimates, so you don't get surprises. And if things go well and we don't run into Of course, I should expect the unexpected, but let's say we don't hit any water mains, you know, we we do a good job. There's built-in contingencies, and if we have more money, then we'll, you know, look at, "Hey, we're going to put in another budget." >> out? >> Right. Carol? >> Yep. >> Jack? >> Jack? of Roadhog Barbecue. Um I would like to get on that committee with with them. I just want to just stress how vital it is for our central part of that town there to get snowmobiles down there. From November 1st until we get enough snow to get the trails open in the town, that's that's severe squeezing season. You know, I end of May through that November 1st, I employ 40-something people. I them people go back to school and such. But to make it through that point so I can keep my doors open, we just have to find a way to get snowmobiles in town. The first couple of years that we were here, we were like, "Boy, this is great." We had the snow and it it helped out like it's just amazing how much it helped out. Of course, we're going to Mother Nature's not going to give us snow all the time, but for me to keep the doors open, we try to we try not to do a 2-week shutdown. We want to be the consistent place in town. Uh 7 days a week. Travelers are coming through, they need a place to eat. And so it's vital that we can find a way and like I'm volunteering to get on that committee. Who or where do I got to talk to? Sign me up. Thank you. >> Anyone else? Now's your chance. >> I just have a question. Terry Means. >> I just had a question on the signs. Those aren't those ones that make the really obnoxious noise when you press the button. Yeah. >> No, these are just they just flash. >> Okay. All right. Just wanted to say thank you. >> Going once. Going twice. >> Hi. Yes, production. Uh my name is Paul Robitaille. I'm chairman of the planning board. And we worked on this project for many years trying to come up with this. And one of the things I think we need is that we were all in favor of project uh uh narrative four. Because I think that's the way to do things. The way to do them right. Do it once and for all and get it done. I realize there's not enough money in this project right now to do that. But I'd like to see us at least try. And the thing of it is is that I really think that what we should do is not just look at little patches here, but try to go as far as we absolutely can from Route 16 up to Route 2. It's very important for us to do this. Because right now what's going on in our society is we're seeing whole segments of our population that can no longer afford private transportation. They are falling out of that and they are walking. Every day you see people walking from their apartments to the Dollar General Store. I see people walking every day to Coos County Family Health. And we're seeing people walking all the way down those those stairs uh from the opposite direction also trying to get to that And I think that's one of the things we have to take into consideration is what we're going to do in the future. Now, if there's a way that we can come up with the money to do the number four uh alternate alternative, I think that's the way we should go at is do it once, do it now, and then we're done with it for another 50 years. But I think if we do it piecemeal, we're going to be back in 10 years. We're going to be back in 20 or we're going to be back in 30. >> Paul, we can't hear you this way. >> I >> You keep turning your >> Let's Let's try and figure something out that I think is the best way to try to do this and do it right. Because I think in the coming future walking and other modes of transportation are going to become more and more important for people to be able to get around. And that's the social economic situation we're going to be facing in the next 20 or 30 years. So, I think that's something we need to take into consideration. Anyway, >> We need to talk about money. >> that's what I had to say. >> Thank you. >> Paul, if you keep taxing people like that, everyone's going to be walking. And I'm not talking. >> Amen. Please. Is there anybody else that wants to speak? >> Uh Rick Sabat with the pizza and I believe there is a sidewalk past me between McDonald's and myself. And I think if you guys maybe didn't do a complete reconstruction with all new granite, use some of the granite you could use and go as far as you can with alternative one on one side and then maybe in the winter time we could use the sidewalk on the other side for snow shoes. And then we wouldn't encroach on the new pavement and that type of stuff. I think that's a good alternative. It goes all the way down through. I think it would be a good solution for everybody. >> Yeah, and that that was kind of that the mode even everything from cuz engineers they they want to propose here's a 5-ft ADA concrete sidewalk. Those go away. You know, we don't want it. We don't have the time or the money to deal with right-of-way issues. So, let's keep the existing sidewalks, rehab. Uh I asked Eric about recycling curb and we're going to try. There's a few spots where you're going to have to pull it and bring it new, but we're going to save money in in that way. Um, and as as you mentioned, kind of the continuous, instead of jumping around construction of course the end product wouldn't look good. So, you try to have a continuous piece, but Rick, I I agree with you totally. We'll be as efficient as we can, you know, are the sidewalks going to be beautiful, brand new, perfect? No, but we're going to have a lot more better sidewalks. >> Right. And on the McDonald's side, you guys use way less hoses down through there, so the noise for the homes and everything would be way less impact. Exactly. Yeah, good good also, yeah. >> Thank you. Anyone else? >> Then, go ahead. >> I just wanted to I didn't know if you were all having me do it or not. I'm Mary White. I guess what I'd like to do is just to kind of get a real short clarification. What I think I heard was if if it's a new part of the sidewalk, whether it's on this side, this side, or wherever, if it's a new part of the sidewalk, it's being redone, refurbished, whatever, no snow machines. Anything that's not refurbished, snow machines can continue to go on that. Is that what I'm hearing? >> I think you're definitely hearing with this grant money, this grant money can't be used for snow blowers. >> Or any kind of motor vehicles, not just snow blowers, can't be dirt bikes, can't be anything. >> Um, as far as the other part, you know, the board hasn't made >> That's Well, that's why the committee needs to be formed. >> The snow blowers talked about all all of that. >> Yeah, cuz as Brian said, there's there's um other ways to get access and things they could do to improve to minimize sidewalk use. >> All right. Thank you for the clarification. Like I said, I just wanted to see if what I heard was valid. >> Okay. I think that this committee is very important. And I hope that with formation of the committee, you'll get all you'll get all the answers you need. And participation from everybody. Or or those boundaries exist. Town. State. And snowmobile club. >> And and Bob's going to be the one spearheading that? >> But no, Bob is going to be on the committee representing board. >> Okay. >> Yes. >> So, somebody else is starting it? Friday. >> Yeah. Well, based on the fact that they have the issue we should be responsible for putting it together. >> Scott. >> Good evening. Scott Nugent. Just want some clarification cuz there's some confusion from Mary's question and how Peter asked it. Maybe we just were wondering. The way I understand this and the way Brian understood it, the way I did, was anything that's not touched as far as this grant goes, is still open to any snowmobile traffic up to that point, correct? Or are you shutting down the entire cuz that's the confusion that >> I think it's TBD, to be determined. To be determined. >> We're waiting for the committee. >> Right. >> Right. Right. And that's it's that's that's for something the committee to look at. We got to look at all of it. >> Well, the committee number one needs to be started by your group, not by me. I'm I'm not a member I'm not a town board. You guys need to start a committee and invite who you think should be on the committee. I I don't think I should start a committee on behalf of the town to tell us what sidewalks we need to use or >> I just think this I think this there was some confusion and and I'm confused now too to be honest with you cuz what I originally heard was whether we use uh the first or the second alternative, which either one is fine as far as as far as I was concerned. But anything that we don't touch with this grant would still potentially be open for snowmobile snowmobile traffic cuz this would still allow our local businesses, the majority of them, to have access in the wintertime. The last question by Mary it sounded like no it wasn't. So I So it sounded like the town was going to go towards maybe not allowing snowmobiling altogether. That's where the confusion was and I just hope we could have some clarification because I think nobody in this room is going to say that they don't agree that we need to support our downtown and we need that we need to revitalize it a little bit. Uh we need to have some nice looking sidewalks. We need like Mr. Holmes said we need to have some lining. Um I've seen it. We've all seen it. They think it's a breakdown lane on their phone and I think those are all good comments. But I think we need some direction too is anything that's not touched right now because I think you're going to get a whole lot more support if we can say okay hey listen right now um you know nothing is nothing is going to change if it's not touched. If it's if it's from Mr. Pizza to the common well hey you know what then they don't use snowmobiles on it anyways. But I think it would be a lot clearer. I I think there's some confusion uh from what I'm hearing behind me um from the cuz we've had two different comments. We've had one that said yes everything would be all the way we understood it was yeah it was open and then we heard it was kind of not open. So we just I think there's some confusion. I think we got to have some clarification and I agree a committee is going to help but I think we need to have some got to have some clarifications to what the board of selectmen and town manager wants to do or what their goal is too as to revitalizing our downtown. >> No, I I agree with that totally. I guess not to be um not answering your question directly but the focus of this meeting and their time was for this grant and the pedestrian. It wasn't a let's make a snowmobile policy. >> No. >> But if you know if you with this committee because we want all the vested parties that are there I think you will come up with an acceptable solution without using this time this grant funded to talk about snow machine only. >> Right, but I and I'm not I'm just using snow machine. I'm just but that seems to be the topic but I think there was some confusion as to what's being said tonight. That's that's that was my point and whether snow machine, ATVing e-bikes, whatever whatever it is. I think there was some confusion. >> So, when it's on delivery this grant funded work and again wherever it is the if we decide to do like Paul's idea, let's just do one side all the way up then well, then that would impact a lot of our side. So, if you do option one or two um or you know, then you would have that opportunity to say we have a lot more options for snow machines. >> Okay. Thank you. >> Anyone else? >> All right, Martin Nations. The public house hearing. Uh when I purchased the pub house, I had to get a 5B note. That's all they'll give you for commercial loans. I have to rewrite that note in a couple of years. The original note was based on perspective uh you know, income and the income was based on the snowmobile income. That's $100,000 a year for me. That's approximately what I get every year from snowmobiles. Take that off the table when I go to refinance a couple of years from now and I probably won't qualify to get another mortgage. So, that'll be the end of the pub house for me. So, your sidewalks ain't going to do any good if there's no place to walk to on. Okay? That's that's all I got to say, but the project I think is going to going to help the town a lot. I just hope you guys consider that the town relies on the businesses. Thank you. >> Anyone else? Going once. Twice. Are we looking for a motion to adjourn? >> So moved. >> Second. >> All in favor? >> Aye. >> Aye. Thank you, Eric. >> Thank you all for coming.