Board of Selectmen Meeting September 3, 2026
The Board approved the preferred alternative design for the public works building, estimated at roughly $10 million, following a presentation on various site options. They reviewed approximately 83 election official appointments for the upcoming primary. Will reported election preparations are proceeding, with nearly 40 people trained and ballot machines tested, though the state still needs to provide accessible voting files by Monday. Regarding committee restructuring, Steve Wright recommended sunsetting the Citizens Advisory Committee in favor of quarterly selectmen gatherings, and Board members discussed potentially absorbing the Bike and Pedestrian Committee's work, aiming to report back in mid-October. A public dispatch study input session is scheduled for September 21st from 5:30 to 6:30 p.m. Source: https://www.youtube.com/watch?v=onp08q2d-l8
Okay, you're good. Okay. Good evening. I'm going to call the meeting of the New London Select Board to order. For transparency and accurate minutes, the this public meeting is being recorded on video and audio and will be posted on the town's website. We are also using an AI assisted transcription tool to help draft the minutes. The approved written minutes remain the official record. If you speak, please state your name each time and speak clearly so everyone and the recording can hear. To stay uptodate, subscribe to our YouTube channel, www.youtube.com of new London. And our first item on the agenda is um Sam Clark, head of public works, and he's going to talk about site design for the public works building. >> Yes. So I think before I hand it over to Sam, when we left the meeting on June 30th with Weman Lampere, the ask was from the board of selectman was for them to come back with some rough cost estimates for the other design options. So that is what we are here to talk through. Um are the other cost estimates. Sam and I have talked extensively over the past few days about this. I think it's really important to note that those estimates are truly just estimates. they are not fully baked out like the preferred alternative um at roughly 10 million. Um but you have the presentation I'm going to flip through while Sam talks. >> All right. So, um, like Ashley was saying as well, the other options that were listed were when we first met with Weman Lampere, they kind of played a game of charades with us with, um, plans and said, "Here's a bunch of options that we developed based on the site that you have and what we think could potentially work." And so, we worked through those through a course of a couple different meetings, kind of looking at which ones we thought would work, didn't work, and then asking them what their professional opinion of the site was and which design would work best. So, um, we came to basically eliminating any of the options that were detached from our main building from a cost standpoint and from a future development of the site, whether that be future expansion of public works or through um the addition of a different town department on that site. And so, the other thing with that is those other options are expensive due to redundancies and you know, water manes, heating systems, cooling systems, uh, inefficiencies with employees walking back and forth. So I think two of those options were quickly ruled out and then just based on um the restrictions of the site they kind of got some funky shapes and it really inefficient design of the building because of the um power line easement. So that's kind of like the highle overview. So proposed option one is option one and option three is basically the melting pot got us of those two got us to the preferred option. So, um, option one was just kind of too small, didn't fit the actual needs of public works and didn't house all the option or all the equipment and trucks that we have now. So, it just wasn't efficient or couldn't really work for us just based on size. Um, they estimated that at 7 million. Like Ashley was saying as well, these are not um developed in any manner. So, some of them have restrictions to them just based on or cost restrictions just because there's there's no development of it. This is just very much based on usually public works buildings cost you this many dollars per square foot. That's how they developed these numbers. The numbers for the preferred option are based on projected numbers, inflation, all soft costs, everything. And they actually went to a third party cost estimator and that's how we got to that very accurate number where these are ballparks. So some of the ones that are not attached to the other building go over the top of a sewer line. So it just couldn't even go there or a sewer line sewer line realignment would have to happen which would be you know a million dollars in itself and so these numbers don't even reflect that but this is their best estimate if you were to move forward with them. So option one like I said just kind of too small and not really fitting the needs of what we have. This would actually be less square footages combined than what we had before. So um option two was kind of a continuation of that. um little bit ineffective with uh the salt and sand along with the recycle building. Um and this had a relatively underdeveloped areas for um like office space and break space. So the other problem with option two is that it restricted future growth of the department as well. So it limited our growth of bays on the addition. So that was another reason that we chose to not really move forward with um fleshing that out. So option three is the closest to the preferred option and it also represents closest in cost just because we did get kind of down the road a little bit on this one. Um I would say it's like again closest to the preferred option just in size, square footage, and then uh office space layout. Some of the biggest differences between this option and the preferred option is that like they finally they got into a little bit more of the flow of the building. um and then break space and things like that, but we still determined that the layout of the break space um and the like public facing area and the municipal office space just didn't really totally work for us. So, um option four was one of the ones I kind of spoke about in the beginning. Just ended up being a really odd shape due to setbacks of the power line easement, property lines, and some rough considerations of the sewer line. And then as you see just kind of ineffective based on the shape and size. Again this one does not um meet our needs for space for bay space for the equipment that we have. So we would be going backwards even from what we had before. Um option five actually can you bring this one back to the the overview of it? So, I think this one's important because initially this was one that we had a lot of interest in, but when we got into kind of going over modeling, and you can actually see they got into modeling a little bit, we realized that it would be a tough spot to put the building and still keep circulation for sand and salt use because that puts the sand and salt behind it and it would make it really difficult for public coming to that space. So, if you notice like to the right of that rectangle is kind of an area where you'll see the modeling shows trucks driving around it. it would require the public to essentially come in front of those vehicles or walk across the entire site to get to the office space. So, we just felt that due to the safety of that and again from the inefficiencies of um them not being attached to the other building, it just didn't make sense. And it really elongated the site into a inefficient modeling when they got into the truck routes and things like that. And snow removal too with this one was tricky just because you have a building that's a drive-through building now and then you have it tight up against a retaining wall. No, that's okay. You can leave it on this one now. Um, it just made it so it wasn't it wasn't going to work out in the end. But we did go down a pretty extensive conversation path about this option because with it being a drive-through bay, we thought we may be able to have some better efficiencies of how things were parked and what was parked in there, but it just didn't end up flushing out the way we were hoping. So, and then you get to the preferred alternative um which we've I think talked about pretty extensively and this is where you see the full bake out of everything happened that um you'll see some building sets like setovers have happened in the office space and that's to match the elevations of the roof of the existing building. Um based on a like construction uh standpoint that we couldn't get the full height of buildings. Um, and then you just see that the layout of the office space has a better flow for the public facing side, but also for the staff side. It kind of uses the a smaller space more effectively for break room and for locker rooms and such. It also allows us to have um male and female locker rooms and just a little bit um better flow throughout. So, you'll see that there's actually a smaller office down in that lower corner for the uh public works foreman. So he gets to be a little bit closer to the um staff that's going to be working in and out of there on a regular basis instead of having to travel from one side of the building to the other. This also has the best or we feel the best layout for parking of the equipment, wash bays, u mechanic bays and things like that. Also is the best option we feel that doesn't restrict the rest of the site. So if public works needs to grow in 50 to 100 years or we want other municipal services there, you still have that other about two acres of land on top that can be used and developed. So um I feel that based on a lot of those points and probably some other ones that I'm leaving off, um this option is really the most effective to handle what we have at public works now with a little bit of growth. Um, almost every bay here would already be full just based on, you know, it's kind of about doors, not the size of the doors. And so, like prior the the garage that we tore down was a six bay garage. This gains back six bays, you'll see seven doors, but one's a wash bay, so you don't, you know, obviously park equipment in wash bays. So, it gains that back. They're bigger bays, so smaller things can be stored between them, but it's still just the same amount of doors. >> That's kind of what I got for you. All right. >> Happy to take questions. >> Rich, do you have any comments, questions? >> It sounds Sam like you're very comfortable with this that you feel like this will provide the most flexibility for you and your staff going forward. Right. >> Absolutely. >> Y >> Yeah. No, this is um you know I we know you've given it a great deal of thought and you've worked with Adam on it as well and I think that's that's all you can do. So since we do need to decide because we have to bond this project um we need to vote on this tonight if if that's okay with everyone. >> Question. >> Sure. Sam, just just I'm just curious if if we had all the money in the world and we don't >> um but if we did um is there anything you would add to this design? >> To this design? No. Based on the fact that the space really doesn't allow anything more here? So, it would have to be a separate building of some kind. We made sure to fully develop the potential of the existing building and the potential of addition on that. Not just to fill space, but also to make sure that we're fitting all the needs of public works. And when I say public works, a lot of people think of these buildings as just the highway department building and it's not. It's the hub for all of public works. So that's facilities, transfer stations, sewer department, cemeteries, highway department, and this is where we all operate out of along with other departments sometimes coming down like firet trucks have gotten worked on at public works and um if police cars need to be washed or things like that. Um and so we really tried to think of all those things and think about over the last um 20 years since this the lower shop has been built, what are the deficiencies of it and how can we better address those? So I feel that this meets all of those deficiencies. It addresses them, but it's not more than we need there. You're not going to come down there and be like, "Wow, there's five empty bays here. You know, did you really need that?" It's we tried to build it exactly to what we need plus a little bit more, obviously, because I think that as the town grows and we develop, we're going to need that space. Um, and just to kind of have that cushion room would be nice because we didn't have it before. We were at absolute capacity before. Um, >> and can I ask a while back when you were kind enough to give me a tour, you mentioned that there was a humidity problem in the one building. >> Will this do anything to address that? >> Yep. Correct. So, when we went over this with them, we talked about and gave them our building asset management program and said like, "Hey, this is kind of some of the deficiencies and issues we have here." And they took that into account. So in this you'll see there's actually like some fans, some air exchangers, ventilation systems and things like that to address that issue. So with this you're getting your former 2004 2005 public works building basically remastered and restored along with the whole site and that fixes like a multitude of issues in my opinion in the sense of if we can address the storm water and all the other infrastructure there, you're really getting a massive upgrade to the town and also one of your most expensive sites. So, >> okay. Um, does anyone in the public have any questions or comments? No. Okay. All right. So, do I have a motion to approve um the preferred alternative for the public works building at 10,452,43? >> So moved. >> All those in favor? >> I. Okay. Well, good. Thanks, Sam. >> Okay. The next item on our agenda is Will is going to talk about an election update. >> Yeah, I'm a poor substitute for Michael Todd, but here we are anyway. Um, and I am going to bolt after this because I'm currently double booked. Um, nothing nothing against you guys. Um, so you have the appointments that we're looking for. There are 83 names on there now, I believe. BB, you confused people with the Elizabeth. You fly under the radar with that one. Somebody did not realize that was the same person. Um, so yes, we have excused you from that, but you will still remain Slackman. >> Yep. >> Which is arguably a higher thing. So, um, all right. So, if we could have you sign all of those, and I'm sorry there's so many, but you only got to do it once every two years. So, and it's having that many people that want to do it is actually a great problem to have because lots of towns are not that fortunate. >> Yeah. >> Um, yeah. I mean, election prep is going smoothly. We did our first training last night that almost 40 people came to, I think, and then we'll do another session on Saturday morning um and get everybody updated on the new rules and all that sort of stuff. Um, the ballot machine test is done. I voted 384 times yesterday. Um, so we are good and all of them were counted accurately, by the way. Um, so we're ready to go there. Um, we're still waiting on the state to give us files for our accessible voting machine that hopefully we will have. They're suffering some underemployment at the moment and sliding into the sideways. Um, so I'm hopeful we'll have that in the near future. Um, we need to have it by Monday, so hopefully they'll be done by then. Um, other than that, um, you know, things are going along pretty normally. Um, you know, I very much thank you guys for being here a little bit more and it will be it'll be quite a day for you. It's it's going to be like election boot camp. It'll be all sorts of fun. Um, but we uh look look forward to that. So, I think we're good to go as far as I know. >> Okay. Are there any questions or concerns about the list? >> No. >> Rich. No. Okay. So, we will >> Oh, and I know there was a question about whether or not all the people got contacted and they did for the most part. I think there were two people, but they were very confident that they wanted to remain. So, and and that's why it's happening now and not last week is because we were having struggles trying to get in touch with people, I am told by Michael and Casey. >> Okay. >> Do we need a motion on this to accept the >> list or as long as you sign the appointment letters? I think that's really what needs to happen. Um, just when when you're going through, you don't need to date it. So, we don't need to worry about that, but just make sure because they there's so many of them that they don't stick together because if one one doesn't sign and it's somebody that's supposed to be there, we're going to have to get you guys back to do it. So, >> Okay. All right. Good. Okay. Well, thank you. >> And where do we stand on um prom people to for selectmen if one of us can't be here? >> I can speak to that a little. So, I've spoken with NHMA and with town council on what needs to happen. The full board does need to be present for the full day. Proms can be um sworn in that day. I think what BB and I had chatted about was for the general election in November. Um aligning up some folks so that it is not the three of you from 7:00 a.m. to 900 p.m. and we can work some shifts in. Um I know Janet and I have talked about uh a list of folks. So, I think we'll spend a little bit of time over the next month shoring up that list, talking to those folks, making sure that they'll be available, and then we can put together a coverage schedule for um the general election day in November. >> So, what's your expectation for us for this for primary day? >> 7 a.m. to I would say 900 p.m., although I know that there's a water precinct meeting at 4:00, so you might have to scoot out. Rich uh has some obligations for his job um in the morning and then possibly in the evening for the NBC for the school board. Bill Helm is um >> Bill's the only one you're making prom for that day. >> Correct. And then we'll work I mean we can we can try for others um >> continuing conversation. Yes, that's I think we work towards something for the general election in November and we iron out that list of names. Um, and I can do that with the three of you over the next month or so. >> And Bill Belhelm is uh going to be sworn in as his millionth time and definitely holds the record for the person that's been sworn in the most. It's a selectman for sure. Um, and just a point when you're thinking about it, remember that when the proms are selectmen, you are not. So if something happens in there, you're trusting that person's judgment to be good for New London. Um, in that sense, not that you would choose somebody that wouldn't, but just that's something to think about like if there's an emergency or whatever. Um, >> I'm fine with that. So, but we only ask former select board members. Isn't that correct? Or we don't >> we do not have to >> we don't have to do that. >> We do not have to keep it exclusively to board of former board of selectmen. >> Make one another prom. I still believe that my >> Well, you wouldn't need to make a prom. You would just switch the shifts because you're still you're you're selectment unless you swear somebody in your >> but we need to have three at all times. >> Correct. >> Actually, I read it that a quorum has to be that's the way I read but we're not >> the selectman's we >> we'll keep discussing it >> yeah town council I I sent that all to >> that's one opinion that's one opinion >> and I can tell you no other town around us is doing this because it's it's like it's a lot to ask of a selectman especially a selectman with a full-time job and I'm not talking about myself I took the day off so I'm fine I'm here all day except for the water precinct meeting >> y >> but you know school teachers and people like staff that are serving as selectman, they can't do that. >> So, it's an unreasonable request. Um, and I read the law differently. And >> it's on the attorney general's checklist for when they come through and ding us for things. They would ding us. >> Well, anyway, listen, Will, I appreciate so much the work that you and Michael do, and you want to follow all the rules, and I know this year is going to be really um complex when it comes to elections, so I want to make sure we do it right, too. I'm I'm playing playing along. >> Yeah. And we just need more people to know because if something happens to Michael and I or God forbid we get other job offers or whatever happens, >> um yeah, >> New London would not be in a good place. And I just want to ensure that happens because regardless of whether or not I'm town clerk, I still got to live here. So, um >> totally agree. >> Okay. >> As long as I can afford to. >> Yeah. All right. All right. All right. So, we're good with that. Okay. >> We're good. All right. >> All right. Thank you so much. >> Thanks, Will. Seriously. Um, >> committees, Ashley. >> Yes. So, follow up from the conversation that we had. I don't know if it was the last meeting or two meetings ago, there were two committees that we were going to continue to um just think about. Um, citizens advisory was one of them. I think at that meeting when uh when we last spoke of this, um Steve Wright had come and met with BB and myself and made a really interesting um recommendation of how to uh maybe sunset that committee, but do a quarterly what we'll call select men's gathering with a standard format of updates. Uh and I think BB and I both felt that that was very interesting and that way we are getting more people informed on a regular basis and they have a general understanding of what um they can expect for an agenda and what updates they could be expecting. Um Steve and I are going to spend a little bit of time over the next few weeks or so refining what that looks like. Um, we will still have the citizens advisory committee meeting in early October. Um, and I suspect that we'll be back probably midocctober or so to talk about that proposal. Um, and talk about potentially sunsetting that committee. And then bike and pedestrian is the other committee that we were talking about um potentially suns setting. I think uh I have had some really great conversations with department heads. Um Sam is working into his budget for fiscal year 28. Um some additional expenditures on what we can put in the uh parcel where the information booth is now. Can we put in trust receptacles? Could we do a picnic bench? Could we do or could we do a picnic table? Could we do some benches? I think that's to be flushed out a bit more, but he's at least budgeting for it for FY28. Um, and uh, I think we will still plan to use that plan that Bonan so generously put together as the north star um, and spend a little bit of money over the next several fiscal years um, to to make that something that's usable for our residents and visitors. Um there uh I'm continuing to have conversations with um committees and other department heads around absorbing the walkable New London initiative. Those conversations are ongoing. So I don't have much of an update there, but I think there is in general a sentiment of yes, we can absolutely absorb um the great work that bike and pedestrian committee has already started. So, that's those are the updates that I have. >> Okay. Um, any questions, comments? >> Uh, no. I'm Are you gonna >> Yeah. Russell? >> Yep. >> Make a statement. >> Good evening everyone. Uh, Russ Moore, chair of the bicycle and pedestrian advisory committee. Um first uh the committee wants to acknowledge that in fact we understand the administrative challenges of managing uh the number of committees the town has now. Um and secondly we also understand the overarching uh demands that the board of selectmen face in the town face in regard to the public works building. um this this the school roof construction, the water volume and availability issues. Um so even from our the inception of our committee, we understood that we were going to work in a difficult context in terms of trying to balance those kinds of issues. Um that it was not going to be a clear path forward in terms of the work that we did. uh I shared an extensive memo with the board of selectmen uh in terms of the rationale for our committee uh and made some very specific recommendations in terms of its ongoing viability. Uh I won't repeat all those points tonight but I do hope that the board of selectmen and the town administrator will carefully weigh all the points that were made uh in that regard. Um regardless of whether our committee continues to exist, um the town residents are going to have concerns around pedestrian and bike safety. Um most recently the job Seaman's neighborhood uh communicates some concerns. neighbors in in Bunker Road and Lakeshore Drive have concerns about recreational activity around Pleasant Lake. Uh so these things are going to percolate up to the board of selectment in one form or another and will have to be addressed. The the whole rationale for the bike and pedestrian advisory committee was to be a venue or a platform for people to share their concerns. Um so um in terms of the first project that we undertook and that was really working the catalyst for our committees being formed was um concerns about the downtown sidewalk connect connectivity and conditions. Um, and I think that that first effort was really a great example of how community volunteers, town staff can work together. Um, Sam graciously gave us a tour of the sidewalks. We gave specific feedback in terms of the sidewalk plan and supported the multi-year sidewalk construction plan through the capital budget. Um, I think that um that was a great example and I think it's reflective of what other towns have done where the committee works very closely in scheduled meetings and outside meetings with town leadership and town staff to solve concrete problems. And um there are many other towns that have effective bicycle and pedestrian advisory committees. They also have nonprofit charities in the same local that collaborate and work together in a synergistic way to ensure that small public works projects are done. Um the the nonprofits will solicit grants in kind contributions from C compan companies and uh donate get donated labor supplies and equipment which is not the same role that a town staff uh can perform or um the the town leadership. Um, I think that uh the kinds of ingredients that are necessary for an effective committee are probably not um optimal for our town at this time. But I did talk to the town administrator about maybe in the next master planning process, we could develop a bicycle and me bicycle and pedestrian master plan that will engage citizens um in envisioning a more walkable town uh that connects people in terms of promoting good health, civic engagement um and enjoyment. Um at this juncture um obviously we have to have a path forward. Um I think that uh there are people in the town that are still very motivated and concern motivated and concerned to get involved in pedestrian bike issues. And I think it would be um ill advise the town to sort of um take on that in terms of an entire scope of work. I mean one of the rationale for looking at the committee restructuring was the staff are overextended there. There's too many demands on their time for them to absorb all the work that the bicycle pedestrian advisory committee has been doing. um and uh the the relationships and the networks we've built through the walkable new land initiative, I think it's unrealistic for the staff to take that on. Um so um in closing I just want to reiterate that you know when you look at uh the data that's been collected over time in regard to our town um the the 2019 master plan listed 10 different areas of concern for residents and the top one was mobility uh enhancements sidewalks trails and bike lanes, there were 10 priorities listed. That was the top response of 737 people. Um, if you also look at the survey that was done by the conservation commission, uh, most recently in terms of their strategic planning process, again, access to trails, walkable streets, uh, bike paths was the most highly rated uh rated response in terms of the quality of life. I know the town has many demands on its time and we are stretched in terms of our resources, but there is a real uphwelling of concern about pedestrian and bike safety and that I think the way forward is to continue to have a bridge between the citizens in the town through volunteer committees. uh that uh that issue obviously has to be weighed by the board of selectmen in terms of the resource allocation of our town in the short term. Um but but I know that there are people on our committee and other people we've identified through public outreach that would would like to continue to be involved in a volunteer basis. So, um, in closing my remarks, I just one of the one of the, um, proposals that I hope you'll consider is to fold our work into the conservation commission or the recreation commission and we have a smaller subgroup, a task force or a working group um that would meet regularly with regularly scheduled meetings of these of these entities. um that we would focus exclusively on the walkable New London initiative which is midstream right now. We have over 280 responses to a community walk survey and that survey is going to end at the end of September. Uh and we had planned for a community forum this fall. We also have built community uh relationships with community groups in terms of suggested downtown self-guided walks. we're engaged in those kinds of cons uh conversations at this time. So I'm there's probably never a good time to sunset a committee, but one of but my proposal and the committee the proposal of my committee is to basically have a soft landing for our group and uh that the town demonstrates a commitment and a concern for these issues uh through volunteer engagement and uh that this core group, this task force or working group would have a very defined term limit of 12 or 24 months to basically bring the Walkable New London initiative to fruition. Um, some of the things that Ashley has mentioned tonight are promising and hopeful in terms of the town actually allocating resources to this initiative. I hadn't I hadn't um been informed uh that that was that was the thinking in that regard. Um, so, um, in closing, I just want to thank Ashley, Sam, Adam, and BB in particular for the work, uh, that they've done with our committee. Um, and I'm certainly willing to entertain any questions from the select board or from the floor in regard to our proposal. No, I don't have any questions for Russ. Thanks for the memo. Thank you for all the hard work that you've done on this, Russ, and all the committee members. Um, I don't have any other questions. Ready? Do if Janet you have questions and then we I guess we can discuss. >> No, I don't I don't really have any questions. I did want to add one point. >> Characterize the whole issue. Yeah. >> Quite succinctly. Thank you. Uh I just wanted to add a question did come up about the role of the New London bikewalk coalition and does that duplicate or overlap with the work of this task force or working group that I'm proposing. And they are they are distinct in terms of their roles in the community. You could refer to attachment A of my memo which kind of delineates the respective roles that they play in the community. I mean obviously the New London bike coalition will continue its efforts um but they are sort of distinct and separate roles. >> Does anyone in the audience have any questions for Russ? No. >> Okay. Comments um path forward. I I guess one thing I I would comment that I'm not really comfortable um having a the bike walk committee um fold into say conservation or recreation. I think those two groups have um enough on their plates with what they're dealing with all the time that I'm not sure that's a good idea. Um I don't necessarily disagree with um pausing for a while to see where we are and getting the results of the survey and then perhaps going forward. But um hear what comments were made in that survey. >> I would I would like to respond to that if you don't mind. >> Um so I I've had I the committee has already been working very closely with the conservation commission. Uh, and I I apologize I didn't mention this, but we basically have opened two new trail heads that will link uh existing conservation commission trails with streets and roads in town. One is at Lionbrook and the other one is the uh KD Cleveland Trail. uh and um that is really in alignment with the conservation commission's activities and with the alignment of our group uh and obviously the board of selectman will make the decision in this regard but that um uh Mark Vernon wasn't able to be here but he did state to me in terms of in principle supporting the idea of having a close collaboration between this working group or this task force force in in only in the narrow uh scope of the walkable new London initiative. So um it you know that that collaboration is going on now on a practical level uh building a network of trails, streets and roads downtown that will be interconnected and will significantly benefit the community >> which is great. I think I guess I'd like to hear from Mark and what he he thinks and it is it's absolutely wonderful the amount of work and time you've taken on this whole project. So, thank you very much. We do appreciate it. >> So, I guess when it's convenient for Mark, we'll ask him Sure. >> to weigh in and give us the thoughts on the conservation commission. If they feel that that is um a good idea to move bike and walk into their committee, >> I'm fine with that. Um yeah, exactly. And I think you know this isn't happening immediately and I option two with um you know u doing this gradually and giving you a soft landing having a meeting in September and November I think is absolutely reasonable a reasonable ask and um during that time also speaking with recreation commission and conservation commission we can speak with Mark on how they'd like to uh you know move forward with this and on convers conversations about a walkable New London initiative group. I mean, it's it's kind of falls under both committees, the whole mission of it. So, it's overlapping. So, um that's what I would um >> that's what I would I would hope >> BB you and I have that meeting with Mark already on the calendar next week. So, maybe >> and I'm going to attend your bike ped committee next Wednesday. You and I you're meeting with Mark next Thursday. That's right. To talk about conservation in general, the the whole commission in general. Not just this. >> Yeah, correct. But I'm saying we could absolutely add this to this. >> And I will say that the the data that has come in from the survey thus far, it's been very interesting information. It is all directed to our department heads, to emergency services or to public works. Um uh which I think is very helpful for us to have. Um I don't think there's that I have seen there's nothing that's sort of a oh surprise. Um but it is all directed towards our department heads. So um when that survey closes at the end of September um and I've shared this with Russ and and he agreed um I will share that information with the department heads first since there there are so many comments that are directed at their teams um before it becomes public. >> Um so great. >> Okay. Thank you Russ. >> Great. Um, I'm going to skip across next meeting date. We're skip that. And u, no parking signs on Main Street. Is this >> Yes, I think I will I will kick it off. Chief can chime in uh if she would like. Um, I think you have all probably noticed the no parking order of New London Police Department along Main Street in front of homes um or before and after the Barn Playhouse. Um, Chief, the request for those signs has significantly increased this summer. Uh, they are all out. The New London Police Department gave out the signs that they had for new properties that were requesting them. Uh, Chief and I have taken a few drives down Main Street um to sort of think through what can we do that's a bit more effective and efficient here. Um, and so I have talked to the Barn Playhouse. The last performance of their regular season is next Tuesday or next Wednesday. Um, those signs are property of New London Police. So, New London Police will pull those signs after the last performance. chief and I will take some time over the next eight or nine months um to really think through are we thought we identified at least two locations where a permanent no parking sign might actually be warranted. Um and we know that things were compressed this summer with the sidewalk project happening on the other side of the street. Um so we'll take some time over the next nine months really take a look at what um makes the most sense there and then at the be before this next season begins next May uh Chief and her team will go out and um place those signs at specific properties that make the most sense. >> Okay. Chief, do you have any thing you want to add? >> No, I think Ashley captured it uh very effectively. it just the signs seemed to be multiplying year over year over year. Um, and so I think it's just time to to clean it up a bit and to look and see if if we can have a more permanent installation for some uh signage on that road if it's warranted. >> Okay, great. Thank you. Okay. Um, we want to talk about the next Luckman meeting date. Yes, the next meeting date is technically slated for Thursday, September 17th. BB is unable to attend. And so in looking at that week, >> we want to bump it till the 24th. >> Y. >> Is that good? Y. Okay. The 24th. >> 24th. >> Yeah. >> And look at that. >> Done and done. Thank you very much. >> Perfect. >> Okay. Uh, town administrators report. >> Yes. I have made some notes here. Um, Janet Lynn, Sam, Bryce Turner, who is our wastewater supervisor, and and I all met with a company called Waterworth last week. They are a company that helps set amongst other things sewer rates for towns. Um Sam and Bryce have done uh a fair amount of work um really looking at systems ways that we can uh better stabilize our sewer rates. Uh, I think this system was really impressive and uh, Lynn has been feeding them all of our data so that they were able to put together some projections for us. It's really data driven setting based on financial outlooks and current cash positions of the town. So, um, I I was pretty impressed. I think Janet was equally as impressed as well, but I think we'll start to see some changes there. Sam, anything that you would add on Waterworth? Okay, Janet, anything you would add on? >> No, I was The company was amazing. Yeah, >> I might point out they're from Canada. >> They are. >> Maybe that's why they were so nice. >> They They were It was really impressive and just very easy to understand the information. And >> um ADCOM, we had a kickoff meeting for the dispatch study last week. They will be on site uh September 21st through the 23rd. That morning of Monday the 21st. There is a placeholder uh for Sherry to interview each selectman individually. I will work with the three of you to find a half an hour that morning um for an interview. And then we are scheduled, we've put it on, it's been noticed, it's on the town calendar, um, for a public input session that night from, I think, 5, either 5 to 6 or 5:30 to 6:30. This is an opportunity for members of the public to come share their thoughts and any information that they have. Um, but that'll be day one of Sherry being here. Um, and then she will be here all day Tuesday. Um and then the remainder of the work will be done virtually um and through phone calls. So it was I think a great kickoff call. Chief and Lieutenant Keith um have started to work on some of the data that they are requesting. So that's going to take a little bit of time um and head space for Chief over the next week and a half or so before Sherry gets here. So things are ready for her. Um, but I think we were both excited and happy to sort of get this going. Um, Patriot Day celebration next Friday, September 11th, New London Fire Department will be hosting the 25th Patriot Day um, event at at the department starting at 11:30. Members of the public are invited. Um, there is talk, I think the plan was always that they would do it to year 25. Um, so this could be the last one. I do not know for certain, but there is talk of that since the whole plan when they first started doing these was it we would do it to year 25. So, more to come, but open to the public 11:30 next Friday at the fire department. uh beach staff uh will end this weekend um at the town beaches. Also, the bathrooms will close after this weekend. Um and then we have the administrative assistant starting next Thursday, September 10th, uh full-time. So Vicki and I will be training her probably for about a month. Um but uh excited to have her on board. I think she is equally as excited to start and I think that's uh those are my notes. >> Okay. Thank you. >> You're welcome. >> Um do we have any committee reports? >> I don't think so. >> Okay. Um the planning board met on the 25th of August. There was a tree cutting and stream buffer, a voluntary lot merger, an annexation, and um Sam gave us an overview of the sidewalk plan, which was very comprehensive and much appreciated. So um that was it. And then we had the CIP meeting on Thursday the 27th or 28th. That was a combined meeting with the planning board. BB and Janet attended and also Charlie Kelsey and John Tilly joined from the budget committee. I thought it was a really healthy discussion. I did make a few notes of just some of the the the key standout um items. This is not comprehensive of any of everything. This are just things that either were special callouts or new. Um for the fire department, the placeholder for the $ 1.9 million ladder truck will remain in year 2023. However, I think we've heard quite a bit um that they are looking at a different type of truck to replace the existing ladder truck. The fire department has uh formed an internal committee of the call members and full-time um employees down at the fire department to evaluate the fire apparatus. So whether it is um replacing with the same style truck but newer, whether it is refurbishing the existing truck or a the new style truck that came down from Canada. Um so lots of work there, but that will remain. That $ 1.9 million placeholder in 2032 will stay. Um the station expansion is likely unnecessary regardless of what option they go with for a replacement ladder truck. um chief and the board of fireworks believes that that station expansion is won't be needed. Um for the library in 2028, there's an interior renovation, paint, flooring, tiles, bathrooms. Um there's a teen space that will be revamped that will likely be funded by a capital campaign as opposed to um a being part of the CIP. um police department. Um similar, this was new this year, similar to how we break out replacement costs for fire apparatus and vehicles and equipment for public works. Um the cruiser replacements are now being uh broken out instead of uh lumped in into one uh large sum. And the general cost of those the replacement of cruisers is about $85,000. And that's including of the uh that's the base for the car and then the additional upfitting um and technology um police facilities. This was uh a little little bit of a shift. We have shifted those placeholders. The lambda acquisition to 20 from 2028 to 2029. Um and the re the separate line item for the either building something new um or purchasing a building uh moves from 2029 to 2030. Um there's no new information, but it would be a shame to lose those placeholders. So we'll continue and if we have to continue to adjust them, we will. But we we've at least got those placeholders there. and then public works. Um, for visibility, the town roof, which was previously approved at town meeting, was readded to the CIP. Um, and a new separate town facility paving line item created, so it will no longer compete with the road paving budget. Um, and then there was a line item for the Sally Port here at the police department, the roof there. I think those were the highlights that were sort of new um ads or shifts within the CIP. But uh I thought it was a great meeting. I thought uh Charlie and John were really beneficial to be there from the budget committee and ask some really great questions and Yeah. >> Okay. >> Yeah. >> Okay. One thing I skipped over was is there anyone here who would like to make a comment about anything that wasn't on our agenda? John Yeah, a month ago I had asked some questions of the chief and I was wondering how what the answers might be for how many windows do we need to put bulletproof glass in and you were going to come back with a number for me. >> You did come back and I believe that was I have the number 32 in my mind. Then it was more it we were talking about the film that would need to go over the windows and that there were 32 panes that would need this film to go over them. >> So 32 p excuse me panes. >> Yeah. It's it's it's it's a film that goes over the panes. Um so it's not a complete window replacement. >> Right. And those pain those the >> films >> films they're bulletproof. >> Yes. >> Okay. >> Oh, okay. Sorry. Chief is saying no. >> No, it's more like a um it it might slow down projectiles, but I mean to get full-on ballistic glass would be um very very expensive. So, it's more like a um a protective film that goes on the windows that would help stop like a rock being thrown it or something. But there I have not received a quote for any sort of ballistic glass for the police department. >> Are you requesting that? >> Okay. Yeah. My question was bulletproof glass. So how many windows would need to be bulletproof? The screen doesn't doesn't achieve protection for the police inside. >> Okay. So what chief >> I wouldn't ask you to get an estimate for that either. I don't think would you would either of you No. Well, I didn't hear you, BB. >> I wouldn't ask her to go get an estimate for that at this moment. >> I don't want an estimate. All I wanted to know is how many windows. >> Okay. >> I I may and I made that clear because that we you brought that up. The money I said don't worry about the money. I need to know how many windows and you said I'll get you a number. >> Okay. So, the number is 32. Correct. >> 32 windows. >> We will get an updated number. We will get an updated number of actual windows. >> Okay. Thank you. Uh parking security cameras. Where are we with parking security cameras? >> We did give an update on that at the last meeting and we had the cameras installed both here and down at the um academy building as well. Those have been in place for 7 months or so. And that's not only Buer but also Whipple and down at the academy building. Right. And no other cameras are needed for security along the back wall at all. >> We have fully addressed the security cameras inside and outside the building at Buer Whipple in the academy building. >> Okay. Just checking. And then I'd also asked about the uh pylons uh or pillars by the steps and all. I wondered how many you felt would be needed to protect. >> Yep. So, so Chief and I have connected with Sam. Sam, do you want to give an update on the pylons? Sure. >> Yes, we went through a um exercise of deciding like if they needed to be a rated pylon or how many it would take and so on and so forth. Um we did address that there's a couple other locations that I needed pylons. So, that's why I got looped into this project. Um they're waiting basically on me for estimates. I'm still working to get those, but it is something that we think we can >> handle internally. Um, as >> Yeah, correct. Yeah. Um, if the selectman choose that they want to move forward with pylons at the police department, I have a couple locations that I need them for construction equipment and such. >> Right. Right. But it's doable for the protection of the >> Yeah, if they chose to move forward with that. Yeah. We don't see why there wouldn't be um anything that would inhibit us from doing it. So, >> okay, great. All right. Thank you. So maybe I can get those numbers, Ashley. I mean about the other one at the next meeting, the windows, how many and Okay, that'd be great. Um and then from uh the energy committee, I just wanted to thank the selectmen for their support and a special thanks to Sam and his team. Uh, I know Janet and Ashley, you saw the before at the Stump Dump and if you see the after, u I think we can land a helicopter or an airplane there. have to take. >> So, my my thanks to Sam and and all of your team. if you could express from the energy committee our thanks for to you and each of the your team that helped make that happen because they did a a magnificent job and we're very thankful and now we're prepared to to proceed with the starting of those which will you know elevate our energy source to to much higher than what it is right now at 45% to hopefully over 90% of efficiency. Yeah, great. Yeah, I will pass that on to the team at public works. I did not run the equipment, but they did a great job. I would agree. So, I will pass that on. >> Thank you, Sam. >> Thanks, John. >> Would you like to say something? >> Colin Beasley, do we have time? I know that you guys >> Well, we're all trying to go to the um school board meeting. >> What time is that? >> 6:30. >> So, now Oh, >> okay. >> needs to be there. Yeah, he's got to go. >> Okay. >> Well, Rich, I'm gonna ask you a question, but you can answer it another day, so you can ponder it. I know that you were a few meetings ago on the dispatch study, you were going to talk to the consultant to get comfortable. I assume you had that conversation and could you share with the community where you came out? >> Yeah, I did not have the conversation with them because I decided in the end, >> okay, >> that I was good with where we were at. >> Okay. Okay. I made that easy. Um, do we have clarity on the what the RFI is and the survey? Are we going to get some the their response to the RFP was that they were going to do an RFI and they're going to do a survey. Do we know what that is yet? >> We do. >> No, no worries. Oh, thank you. >> We just received the survey. Um, and that is what I just mentioned that Chief and Lieutenant Keith have just started to work on. Okay. There was a call this morning to get some clarity on some of the questions, but it's um >> an internal data. >> Yes. >> Okay. Okay. >> Yep. >> Okay. And the and the RFI they're working on is >> not >> Do we know what it is? >> We have not received it. >> Okay. So, we don't know what it is. Okay. Um, can you give me can you give me a sense of what the timeline is going to be? When the interviews are going to happen, what you know when can >> Yep. >> when can I talk to the person? >> Yep. So, I just mentioned this that on Monday the 21st, there's going to be a public input session from 5:30 to 6:30 that night. >> Public session. >> Yes. for anybody from the public to come and have conversations and provide provide information, ask questions. It will be her first day here, so I don't think she's going to have a lot of knowledge in her brain, but um that's the time when she will be available. >> I may we could talk about this. If you want to take off, I'll I'll stop. Uh I just Is the conversation going to be on the 21st oneonone or is it going to be a group of people asking questions? is going to be a group of people. I guess if only a few people show up, it could be one-on-one or if it's only one person that shows up. Um, but it the format is she will be here from 5:30 to 6:30 to hear from members of the public. >> And how many folks are we is she going to interview across the communities? Do we know that? So while she is here, she will be speaking with the three board of selectmen individually, me individually. She will be spending a fair amount of time within our dispatch center um reviewing their uh operations, meeting with Chief, meeting with Lieutenant Keith, members of the New London Police Department, um likely meeting >> the other towns, >> meeting with um New London Ambulance in person, and then what we had talked about on our kickoff call last week was conducting the interviews with the other chiefs um in other towns virtually. Not every town has full-time staff. Um and so they, you know, they don't, not every town has full-time fire staff. Um I think there's a a chance that maybe she could sneak in time with Chief Clark here um to have that interview, but that is how we left it. that those interviews with the other towns would likely be on her own time given their schedules. >> So, so I would ask that um somehow you consider some process whereby I can sit down on the phone or otherwise with her to go through what started this whole initiative which is that draft presentation that lays out the assumptions that I think that she needs to look at and I want to make that a public record as part of the analysis. I think that I think your opportunity to do that is the 21st. >> Presentation 5:30. Give it a tour. >> Sure. Okay. >> Absolutely. >> Okay, that's fine. Okay. >> Yep. >> Thank you. >> Yeah. >> Okay. Um wrapping it up. I just want to mention a couple of things. The um town offices will be closed Monday, September 7th, uh and also for Labor Day. And on Tuesday, September 8th, there will be um primary day. So, I hope everybody votes and we have a good turnout and that sort of thing. And those are the most important. All the other meetings are listed on our town's website. >> Sure. >> Okay. Do I have a we we are we sign stuff or we going to wait on this? >> So, what Rich and I talked about really the most important thing to sign are the appointment cards. if you two can sign them, even if we take them down to the school and sign them and then he takes them over the weekend. We just need them by Tuesday morning to all be signed. There are other things in here. Um if there's anything that I think needs to be done before next Tuesday, I'll pull those out for you guys to sign. >> Okay. >> Okay. >> All right. So, do I have a motion to adjurnn? >> Second. All those in favor? I. >> Okay. Thank you all for coming.