2026_08_10 SB Minutes
Water system updates are 90% complete; a new transducer will be purchased. DES inspection is set for August 19. Library solar inverter functionality was restored; panel replacement was authorized with capital reserve funds. The EV charger was decommissioned due to costs and misuse. Scott approved the removal of three trees near Stevens Terrace and one dead maple near the ball field via contractor. C. Goulet and R. Scott, Jr. approved the manifest 3/0. Quotes will be obtained for repainting the school crosswalk. An insurance claim was filed for a damaged fire department radio. Upcoming meetings include Hazard Mitigation on September 2 at 5 PM and Selectboard meetings on 8/24 and 9/21 at 6 PM at The Grange. Source: https://stratfordnh.gov/wp-content/uploads/simple-file-list/Minutes/Selectboard-Meeting-Minutes/2026-Selectboard-Minutes/2026_08_10-SB-Minutes.pdf
Town of Stratford Board of Selectboard Meeting Fuller Town Hall @ 3:30 PM August 10, 2026 Call to Order: 3:30PM by Harry Juergens Selectmen present: Harry Juergens and Ron Scott, Jr, Charlie Goulet Others present: Suzanne Goulet, Vanessa Toner, Brian Hays Brian: Provided updates on the ongoing water system improvements following the issues discussed in July. The transition from the older control boards to a new PLC system is approximately 90% complete. The existing boards are still being used to transfer signals due to limitations with the current pressure transducer. A new transducer will be purchased to complete the upgrade. The Board also discussed adding a mechanical pressure switch as a backup in the event of PLC failure. The surge valve micro switch has developed a fault. Temporary workarounds were discussed, along with potential replacement costs. If VFDs are installed in the future, the existing valve may no longer be necessary. An electrical storm recently tripped a contactor at the Milhouse lift station, requiring repairs and pump re-priming. Additional stabilization work is planned. Statewide Aquastore is scheduled to inspect the reservoir tank and address a minor leak using drone technology. A DES sanitary survey is scheduled for August 19. Recent improvements include improved labeling, updated chemical logs, daily water testing, and general cleanup of the treatment area. Sewer System & Lagoon: Routine operations continue at the pump and lift stations with no major issues reported. Outflow continues to be monitored, and the sewer truck is scheduled for inspection this month. Progress on lagoon closure planning remains slow, with continued coordination with Verdantes, formerly Horizons, under state direction. Lead Service Line Survey: Underwood Engineers has been re-engaged to complete the visual inspection certification required as part of the statewide lead and copper survey. The certification has been signed by the local contact and will be forwarded to Underwood Engineers. Challenges remain with homeowner participation and the feasibility of completing the survey in a small municipality. Suzanne: Library Solar & EV Charger: discussed increased library electric bills, which were traced to the solar inverter being switched off. The issue was corrected and the inverter was secured with a zip tie. One solar panel was damaged, possibly due to vandalism. Replacement was authorized using capi tal reserve funds. The EV charger was decommissioned due to ongoing costs and misuse, including ve hicles being left plugged in overnight. The Board discussed potentially installing a timer if the charger is brought back into service and will review future electric bills before making further decisions. Veter ans Monuments & Grant Research: continued efforts to identify funding and contractors for repairs to the veteran’s monuments. Various patching materials and potential grant opportunities, including a Moose Plate grant, were discussed. If permanent repairs cannot be scheduled before winter, temporary patching may be necessary. Road Maintenance: updated road repair lists provided by Mike Lynch and Steve LaFrance were distributed for Board members to review and inspect prior to the upcoming bud get season. The Board also noted ongoing state work involving ditches and culverts following previous requests from the Town. Primex: An insurance claim was filed for a fire department radio damaged in a vehicle accident. Suzanne also wanted the board to know that the Carr’s had written a thank you letter for the work on Stevens Terrace with Lynch, LLC. Select Board: Juergens: Discussed repainting the school crosswalk, which is now the Town's responsibility. Quotes will be obtained, including consideration of associated traffic control costs. Goulet: Updating the Timer switch at the public works building will reach out Scott: Approved proceeding with the removal of three trees near Stevens Terrace and a dead maple near the ball field. The work will be completed by an approved contractor Manifest: C. Goulet / R. Scott, Jr. approved 3/0 to sign for 7/27/2026, 8/3/2026. Signed between meetings: Reservation for Fournier, Letter to Aldrich, Building Cert Stockman, Reservation NCA Home & Health Agency Butterfly Release Old Business: N/A New Business: Signed Documents: Minutes, SM 7/27 Reminders: Hazard Mitigation Meeting September 2,9,23,30 @5PM, Class VI webinar 8/12 12-1PM. Selectboard Meeting’s 8/24 and 9/21 will be at The Grange at 6PM, Election Law training 9/1/2026 11:30-2PM Colebrook Court Rm Town Hall Public Input: N/A Non- Public: (3) RB Applications Meeting Adjourned: 4:18PM Minutes prepared by: V. Toner