PBMIN 2026-09-01 DRAFT - WORK SESSION ~ IN PROCESS

The Planning Board held a work session on September 1, 2026, to review the Capital Improvement Program (CIP). The CIP Committee recommended 15 projects for the 2027-2032 plan, totaling $15 million, with specific funding spread across fiscal years. The Board decided to hold only one public hearing on the CIP, with a draft report expected by the third week of September for a review on October 6. Kyle Finnell, Director of Community Development, provided updates on new software implementations and the Downtown Improvement Program, which has construction estimates of $2.3 million for downtown oval costs, $846,000 for library parking, and $343,000 for South/Clinton Street parking. No formal votes were taken, and the meeting adjourned at 7:21 pm. Source: https://www.milford.nh.gov/api/blob/viewBlob?i=wulf555shsbo6qtzkf87zHKMljPh0uYtBdg0OxEsc46xK3KPilttrScx38f8Fk4v

Document

MILFORD PLANNING BOARD WORK SESSION MINUTES ~ DRAFT 
1 
September 1, 2026 - Board of Selectmen Meeting Room, 6:30 PM 
2 
 
3 
Members Present: 
 
 
 
 
 
 
Staff: 
4 
Tim Finan, Chair 
 
 
 
                                    Terrey Dolan, Town Planner 
5 
Janet Langdell, Vice Chair                                                                 Blake Desmarais, Videographer 
6 
Justin Demontigny, Member                                                               
7 
Andrew Ciardelli, Member  
8 
Susan Robinson, Member (arrived at 
9 
Paul Amato, Alternate 
10 
Tina Phibrick, Selectboard Representative 
11 
Chris Labonte, Selectboard Representative 
12 
Mike Thornton, Alternate Member 
13 
 
 
 
 
 
 
  
14 
VIA Zoom: 
 
15 
Excused: 
16 
Pete Basiliere, Member                                                             
17 
 
18 
 
19 
 
20 
  1. Call to order: Chair Tim Finan called the meeting to order at 6:30 p.m. He introduced Planning Board 
21 
members that were present and staff. There will likely not be any votes taken this evening, but in case of 
22 
that, Paul Amato will be voting for the absent Pete Basiliere and that if S. Robinson does not show up, 
23 
voting for the absent S. Robinson, but there should not be any votes this evening. 
24 
 
25 
 2. Public Hearing: The first order of business this evening is an update on the Capital Improvement 
26 
Program which will be presented by Kyle Finnell the Director of Community Development. 
27 
 
28 
 A. Capital Improvement Program – CIP (2027-2032) Draft Report Update. The CIP Committee 
29 
reviewed 21 total requests from seven departments this year, going through the process of ranking and 
30 
scoring those projects based on the 12 criteria for eligibility and also an urgency ranking.  The 
31 
Committee has finalized its scorecard which is provided for you today and have identified 15 projects 
32 
that they have recommended accepting for the 2027-2032 plan.  To orient all with the scorecard, all 21 
33 
projects are listed which also includes the total cost and all are color coded for the cost and impact; the 
34 
15 projects are listed in descending order, the 15 are to be funded in FY2027, 4 in FY2028 and 2 to 
35 
begin funding in FY2032. 
36 
 
37 
To Mr. Amato’s comment, there are four items highlighted in blue, Mr. Finnell explained 3 of those are 
38 
for water utilities, and are expected to be paid from rate user fees, the Ambulance is set up through their 
39 
Capital Reserve Fund for which monies come from the revenues generated from using the Ambulance 
40 
Services and the billing for those services.  Those ambulances are paid for out of the Capital Revolving 
41 
Fund where currently there is $140,000.  P. Amato asked how much is taken into those accounts a year?  
42 
K. Finnell was told by the Finance Director that the threshold is usually met in Quarter one.  C. Labonte 
43 
commented that the Ambulance Department brings in between $900K and $1 million per year. C. 
44 
Labonte indicated that over the past couple of years, the ambulance billing laws have changed, the town 
45 
raised our rates in order to collect the maximum amount and that should bring in more as a net positive. 
46 
P. Amato asked what happens if someone does not have insurance? C. Labonte said there is a process to 
47 
to go through to get the cost lowered. There are a lot of options and then there are some that are un-
48 
collectable. J. Langdell said the $900 - $1 million is billing?  C. Labonte said that is actually collected. 
49 
Actual revenue or anticipated revenue and it mostly goes into General Revenue.  C. Labonte did have 
50 
one question on the CIP projects; the DPW Truck was originally put in as DPW4, the town got a grant 
51 
which was a match and I believe we are getting another truck for DPW and the truck will be able to be 
52 

Planning Board Work Session minutes 09.01.2026 ~ DRAFT 
 
2 
bought out of budget money. Mr. Labonte asked if Kyle Finnell could follow up on that to see if that 
53 
DPW truck comes off the CIP list because DES awarded a grant that is funding 80% of the truck, so that 
54 
will be two trucks from DES in the last two years so that will eliminate a Warrant Article for the vehicle. 
55 
Kyle Finnell noted to check on that project in the CIP.  This year we are trying a new software called 
56 
ClearGov to prepare the CIP, as you can see on the screen (he is not able to print it out) and it includes 
57 
three budgeting modules and the first one we brought on line was Capital Budgeting so this is how we 
58 
have had the Department Heads submit their requests, fill out their financials and articulate how they 
59 
anticipate funding it, what years are anticipated funding it for the six years of the CIP or if it is further 
60 
out and this is also the platform which will be used to build out the CIP. Currently on the screen, is the 
61 
Dashboard that the CIP Committee has committed to using and if all of the presented projects were to be 
62 
approved as presented it would total $15 million over the full length of the CIP, that is not what the 
63 
taxpayers will be on the hook for and keep in mind this is based on initial estimates. This software will, 
64 
Mr. Finnell believes, give the Town a more robust CIP process that will follow year to year as a 
65 
planning document.  
66 
 
67 
T. Finan asked if all requests are in this software? K. Finnell responded all 21 requests are in the 
68 
program right now, based on the recommendations of the CIP Committee; K. Finnell has included the 15 
69 
projects to the CIP, the other projects were put into a category identified as “deferred.”  This way, those 
70 
deferred projects stay in the system and the Department Head that created it can go in and edit it or 
71 
tweak the numbers or the years and come back to it in another year to resubmit to the CIP. T. Finan 
72 
asked if the report will be generated from this software? And will all 21 projects be included? K. Finnell 
73 
responded that when the report is generated, we can include all 21 projects. J. Langdell indicated the 
74 
dashboard can probably be adjusted to show all 21 projects too? K. Finnell responded that he knows that 
75 
we can, but we are all just learning the software so he cannot make that change quickly at this point.  C. 
76 
Labonte stated that he hopes that ClearGov will be a good tool for the town, and in the past he has not 
77 
felt that the CIP was a good tool for him since it only did one year at a time, so now with the new 
78 
software, it shows that nothing has been but in the years after the six year timeframe. C. Labonte feels 
79 
that having the longer list if projects shows what the town actually needs and the CIP done over the past 
80 
ten years has really not been a strategic planning tool.  J. Langdell responded by stating that in the past 
81 
there was a BOS member that wanted to prioritize a list for the BOS looking at one year.  C. Labonte 
82 
feels that is a disservice to the Town.  J. Langdell agrees and wants to go back to the intention of the CIP 
83 
over a multi-year period.   
84 
 
85 
T. Finan said this is the conversation that has been happening for many years and it is a shame for 
86 
volunteers to put in so much time on the committee.  All agreed this software may in the end be a more 
87 
proactive tool.  P. Amato asked where is the schools input?  K. Finnell said he will do his best to answer 
88 
that stating the Superintendent and School Business Administrator have been invited to use this 
89 
platform, they were included at the very beginning of this process with all Department Heads, when 
90 
Kyle reached out to the School Board Chair and asked who would be representing the School District on 
91 
the CIP Committee, he was told they are already over extended and did not want to further stress the 
92 
Board.  They have developed their own CIP process, the last Kyle has seen they met in late June and 
93 
have not met since then and he has not gotten any updates.  K. Finnell has one informal meeting with the 
94 
Superintendent in mid-August and at that time she indicated they only have one project for the short 
95 
term moving forward and he has not received any information or numbers related to that project so he 
96 
cannot really speak to it but he is hopeful that numbers will be provided so that it can be included.  T. 
97 
Finan so there is one project that they would have on the CIP? K. Finnell clarified that there is one 
98 
project that they would bring to the voters in 2027.  T. Thornton indicated the Town is doing its best to 
99 
identify the needs and until the School meets with the Town to identify all the needs in town, we will not 
100 
get to a clear outcome.  T. Finan sees this as a disservice to the Town and he would love to see their 
101 
report so that we can look at both CIPs (School and Town).  In the conversation with the Superintendent, 
102 
K. Finnell stressed that he would like to get the town and school synchronized so that we can be 
103 

Planning Board Work Session minutes 09.01.2026 ~ DRAFT 
 
3 
supportive and a spreadsheet would be helpful.  K. Finnell had been told that there would be a line of 
104 
communication but he has not heard from anyone during the summer.  Because of that, we will circle 
105 
back now that we have a Finance Director that has been getting oriented and attending the CIP meetings 
106 
and she will be assisting in the cleanup of some of the financials; remembering this is a new tool and the 
107 
Department Heads submitted information on projects without the assistance of a Finance Director in the 
108 
beginning so Kyle has been learning but is not a Finance person but he is doing his best. Based on the 
109 
urgency scores from the CIP Committee we are trying to go back into the requests and anything that 
110 
scored less than a 5, which ends up being six projects that will be looked at and will try to push those out 
111 
to future years to try to address that concern of a really heavy hit in tax year 2027 and 2028. 
112 
 
113 
J. Langdell asked if there will be a report produced in the end that goes out several years similar to what 
114 
the Planning Board used to get?  K. Finnell responded that the historical CIP report had 3 tables attached 
115 
to it, Anticipated Impact to Taxpayers, in talking with ClearGov they will give the town access to new 
116 
functionality to test it out and allow us to go in and build out that table that we are accustomed to seeing, 
117 
add those categories and then run a single report for all of those projects to see the anticipated tax impact 
118 
year to year since the cost is not necessarily the impact year to year.  The software is still very new and 
119 
something that Kyle and Jennifer the Finance Director will work through and because of that we may 
120 
not have a draft CIP to present to the Planning Board until October since it will take a couple weeks to 
121 
get through that. Additionally, with ClearGov the CIP report can be generated but there will still be a 
122 
need to provide some of the tables that ClearGov is not set up to generate.  P. Amato asked if the 
123 
progress and status is available throughout the year with the budgeting module?  K. Finnell responded 
124 
that there is “Budget Tracking” so that once it is approved through the CIP, those financials are 
125 
transferred into the Budget Tracking piece.  We are not yet trained on that portion, but in year two there 
126 
will be training done in order to utilize that module. J. Langdell asked if that can also be used to track 
127 
any Government Projects?  K. Finnell answered that would be very helpful and he will explore that.  P. 
128 
Amato asked if ClearGov will be used for the Town Budget this year?  C. Labonte said that was the 
129 
intent however, with the disruption of the computers in July 2026, K. Finnell is unsure if that will 
130 
happen in 2026 or 2027.  Additionally, K. Finnell mentioned that another new software the Town is 
131 
launching this year BS&A is the Accounting software goes live in December 2026. 
132 
 
133 
J. Langdell asked if the two software products (ClearGov and BS&A) talk to each other?  K. Finnell 
134 
responded that they do, when we upload the data from ClearGov to BS&A they have to essentially code 
135 
where the numbers are (ESR).  The current system (MUNIS) does not line up with what the DRA wants 
136 
us to have so we are considering pausing the budgeting rollout until next year.  P. Amato confirmed that 
137 
ClearGov is a budgeting tool? And BS&A is an Operational Tool to do the Accounting? K. Finnell 
138 
agreed and until we get BS&A cleaned up and recoded to match DRA, he does not see ClearGov being 
139 
used for Operational or Personnel for this year but we were already underway with Capital so we are 
140 
pushing through with CIP and getting Department Heads used to the platform since the platform will be 
141 
very similar.  P. Amato asked about this year’s CIP and this list shows projects for this year, were the 
142 
other projects for future years?  The guidance that K. Finnell gave Department Heads was to provide 
143 
him with all past projects and projects not adopted or put to future years, knowing that ClearGov can put 
144 
projects into future years he felt it would be easier.  C. Labonte said thank you to Kyle Finnell to taking 
145 
on the CIP project and understands that it is a lot to take on in one year.  K. Finnell explained that he and 
146 
the Finance Director Jennifer need to sit down to review and projects and determine what can be pushed 
147 
off to another year or years.  He did not have that information at the CIP Committee meetings so the 
148 
scorings were based on what was presented and have left the scorings and arrangement to the Finance 
149 
Director and Community Development Director.  T. Finan indicated that after this year, going forward 
150 
that should not be on those two people.  K. Finnell agreed and stated that going forward that information 
151 
will be built into the CIP. 
152 
 
153 

Planning Board Work Session minutes 09.01.2026 ~ DRAFT 
 
4 
C. Labonte asked about Project DPW3 that has a price of $5.6 million? K. Finnell said that is the total 
154 
over the number of years.  The Director is presenting the $5.6 million over a number of years for paving.  
155 
K. Finnell indicated he will show how the projects can be filtered out by year to get a better grasp on the 
156 
yearly cost; new users put in the total for one year, but that does not show the tax impact for taxpayers it 
157 
just shows the total cost; that is where Kyle and Jennifer need to go through to clean up the data that was 
158 
submitted to the CIP this is currently a living document that needs cleanup work.  J. Langdell also would 
159 
like to have the Capital Reserve Funds identified for any projects that have them.  A list of the projects 
160 
that have a Capital Reserve Fund and a list of the Capital Reserve Funds and balances; this will be 
161 
needed for Town Meeting as well, said J. Langdell.  K. Finnell just saw that list last night and will try to 
162 
include it in the final report.  K. Finnell said the Finance Director is hoping budget numbers will be 
163 
complete next week.  K. Finnell is hoping to have a draft CIP by the third week of September to have a 
164 
look before the first public hearing. T. Finan asked if there are two public hearings needed? K. Finnell 
165 
answered he believes historically there have been two public hearings. T. Finan commented it sounds 
166 
like there is a lot on Kyle’s plate, would it be better to have the first public hearing later in October? K. 
167 
Finnell said if the Board is okay with having only one public hearing, that would be okay for him. K. 
168 
Finnell said he is anticipating having the draft CIP for the Planning Board Work Session October 6. P. 
169 
Amato said if there is only one meeting to review the draft CIP it needs to be ready to go.  T. Finan 
170 
noted that there could always be a public hearing at a joint meeting with the BOS. 
171 
 
172 
Paul Amato asked C. Labonte how comfortable are the BOS with the to-day spent numbers versus the 
173 
budget? It is hard to create a budget if you don’t know the spent to date numbers.  C. Labonte said that is 
174 
hard to answer; starting with having a lot of changes whether software changes, some different things so 
175 
burn rates might not have been available or distributed timely so we would look forward to seeing those 
176 
burn rates.  One year ago, there was a burn rate each month and then that faded off, there is a burn rate 
177 
for every department by line item; so we have been working through new staff, new processes, new 
178 
software to get a more detailed, accurate report to know where we are.  P. Amato that is so you can start 
179 
on next year’s budget.  C. Labonte state that happens behind the scenes at the Town Administrator level.  
180 
P. Amato added that they need to know that the numbers are good enough.  The tax rate will be set fairly 
181 
soon in October and the State needs accurate numbers (burn rates) to decide what the tax rate it.  Not 
182 
necessarily the expenses but the revenue, we can’t exceed the numbers.  But P. Amato asked how do 
183 
you know you are not exceeding the budgeted number if you don’t have your burn rates? C. Labonte 
184 
said as a municipality, you cannot exceed what is budgeted.  J. Langdell said but it has happened, not in 
185 
Milford, but it has happened. C. Labonte said he has to trust the Finance Department for those numbers.  
186 
P. Amato noted that as Selectmen, that Board is fiscally responsible.  The last burn rate seen by C. 
187 
Labonte showed that the burn rate was not out of whack. 
188 
 
189 
K. Finnell wanted to show members what the CIP document from the new software generates.  It would 
190 
give a one-year report and then it can also give the full 6-year breakdown with funding sources (which 
191 
needs clean up). Once all the data is cleaned up, T. Finan commented it looks like it will be great. Once 
192 
the data is alright, the document can be public facing so members can go into it to get comfortable with 
193 
the new layout. K. Finnell asked the Board if it would be okay with getting read-only access? The CIP 
194 
Committee was granted more interactive access.  His one request would be that members not use the 
195 
Comment Feature as was recommended by NHMA. J. Langdell asked if the comment feature can be 
196 
turned off?  K. Finnell said it cannot, but he will look into that to see if there is another way to keep it 
197 
read only. C. Labonte said in the past the town used capital reserve funds for bigger projects and now we 
198 
have changed to inconsistent use of them, is there a function in ClearGov that can utilize those Capital 
199 
Reserve Funds with the budget? K. Finnell answered that he and Jennifer are looking to find that 
200 
function in the system.  J. Langdell said it seems like the previous Finance Director used that ability to 
201 
select ClearGov.  M. Thornton asked if one of the functions of ClearGov was that the public could go in 
202 
to look at the numbers in the “Budget Book”? K. Finnell said yes that is one of the features that attracted 
203 
the Town to this software. 
204 

Planning Board Work Session minutes 09.01.2026 ~ DRAFT 
 
5 
 
205 
T. Finan asked if consensus of the Board is to only hold one CIP public hearing?  J. Langdell said yes it 
206 
seems that as long as that one public hearing is a complete hearing. There were no other comments on 
207 
the CIP. 
208 
 
209 
B. Amended New Hampshire RSA 79-E Discussion  
210 
S. Robinson asked if there was someone planned to come in to talk to the Board on 79E?  T. Finan 
211 
responded that there was a plan, but Kyle had an intern do some work for him on this.  K. Finnell provided 
212 
the background on the 79-E which was adopted in Milford in 2017 and also some new processes that are 
213 
now in effect thanks to House Bill 1103 which the town may be interested in adopting.  Currently the 79E 
214 
program allows tax relief for meeting the criteria. With the passage of HB 1103, the town is able to allow 
215 
additional criteria.  K. Finnell read the current language in HB1103. There is an upcoming Webinar 9/17 
216 
at noon; speaking to this new language so we will be getting guidance on how we can implement the 
217 
changes.  The current 79E in Milford is limited to only the downtown area.  With HB1103 there is more 
218 
flexibility in what the town can adopt.  C. Labonte said now if there is new housing built, the town needs 
219 
to decide how that bill can be implemented in Milford. Also if new housing is built, who ends up getting 
220 
the tax benefit?  Is it the developer, the builder, the owner?  K. Finnell offered that 79E is there and there 
221 
are projects that would not happen if it were not for 79E; the town needs to make sure that the program is 
222 
good for the town. The webinar is on September 17.  K. Finnell noted that we will send out that link for 
223 
anyone to join.  J. Langdell would like to see the ability for this bill to open up more housing availability.  
224 
K. Finnell pointed out that Keene has opened up a lot of the provisions of this bill to include mixed use, 
225 
and going to the maximum of tax relief, over time the district has built out according to the 79E regulations.  
226 
They area not re-zoning, they are only expanding it.  J. Langdell asked how Keene defines Affordable 
227 
Housing?  K. Finnell said he will find that out.   
228 
 
229 
P. Amato asked how this will be incorporated into the schedule? T. Finan maybe we take a look at what 
230 
is available and take small portions? J. Langdell asked if the Board wants to take a look at the Zoning first.  
231 
K. Finnell suggested this is just an introduction, maybe start with looking at the maps, that includes 
232 
water/sewer, then a map with zones and look at housing opportunities.  By using the maps to start, we can 
233 
identify what aligns the most to allow provisions.  He understands that this is just the beginning of the 
234 
conversations.  J. Langdell indicated there is a lot of information out there and would it be beneficial to 
235 
invited Conservation, EDAC, BOS, and have it upstairs.  A. Ciardelli thanked Kyle for the information 
236 
and feels it is a great start to create our thoughts and bring that back to the next meeting to discuss.  There 
237 
are a lot of layers to this, so everyone needs to read it over again and then schedule a Charrette to further 
238 
reach out.  Kyle commended the Intern Ryan that supported Community Development and provided a lot 
239 
of this information for tonight’s meeting.   
240 
 
241 
C. Downtown Improvement Program Update.   K. Finnell summarized a memo to the Chair of the 
242 
status of this project.  The Preliminary Engineering Phase is just being concluded.  The Cost estimates are 
243 
being compiled and in an update provided this morning.  DOT  is still waiting on traffic data.  The BOS 
244 
needs those details to make decisions.  There are two sections of the Downtown, Middle Street to Putnam 
245 
and Nashua Street to School St.  Expanding the Wadleigh Library parking is another element. And the 
246 
parking lot on South Street/Clinton Street is another element.  The Final Prelim plans downtown oval cost 
247 
construction is estimated is $2.3 million, the Library Parking Lot will be $846,000 and the South/Clinton 
248 
Street parking lot will be $343,000.   
249 
 
250 
D. Other Business.                                                                                                                  The applicant, 
251 
Milford DV Property, LLC, is requesting Minor Site Plan Approval to construct a new 598 sq. ft. leasing 
252 
office and five (5) dedicated parking spaces, that include two (2) handicap spaces on a vacant .212-acre 
253 
lot within the existing Longley Place II (rental townhouse apartments) 5.528-acre complex. 
254 
 
255 

Planning Board Work Session minutes 09.01.2026 ~ DRAFT 
 
6 
3. Other Business: Discussion of the 08/05/2026 Select Board Meeting.   
256 
T. Finan wanted to update the board on the Selectboard meeting from last week. J. Langdell thanked him  
257 
 
258 
4. Meeting Minutes Approval: 08/18/2026 Minutes. 
259 
T. Finan asked for any corrections.  
260 
T. Finan asked for a motion to approve the minutes from 8/04/2026 as amended. P. Amato made the 
261 
motion and A. Ciardelli seconded. All were in favor with none opposed. Motion passed. 
262 
 
263 
5. Future Planning Board Meeting Dates: 09/15/2026 & 10/06/2026 Work Session.  
264 
 
265 
6.  Adjournment:  
266 
T. Finan asked for a motion to adjourn the meeting. T. Philbrick made the motion to adjourn; J. 
267 
Demontigny seconded. All were in favor with none opposed and no abstentions. Meeting adjourned at 
268 
7:21 pm.  
269 
 
270 
 
271 
Respectfully submitted by: Darlene Bouffard 