The Select Board reviewed the year-to-date budget, noting the Equipment Maintenance line item requires close monitoring after $2,300 was spent on backhoe repairs. The Board instructed the Road Agent to organize the quonset hut to relocate Engine 4, and established a deadline of September 1, 2026, for the removal of the fire truck not owned by the Town. A part-time employment application was reviewed and approved to offer a job. The Greenville Road paving project is open to traffic but will face sporadic closures for culvert installation. Paving is scheduled to begin late July or early August. The Marcel Road project will commence after Greenville Road progress is made. On Scripps Lane, no project is pending, but residents were informed they may submit professional bids in the future. The meeting adjourned at 7:28pm following a 2-0 roll call vote. Source: https://www.masonnh.us/sites/g/files/vyhlif6851/f/minutes/06.09.2026_sb_hwy_minutes_-_approved.pdf

Document

Select Board Office - Town of Mason 
16 Darling Hill Road – Mann House 
Mason, New Hampshire 03048 
(603) 878-2070 (603) 878-4892 Fax 
 
Select Board / HWY Meeting 6/9/2026 
Approved Minutes 
Present: Select Board members Kate Batcheller, Rob Doyle; Admin Asst Jen Tenney; Accountant Brenda 
Wiley; Road Agent Dave Morrison 
Absent: Select Board member Antje Skorupan 
 
Called to Order: The meeting was called to order at 6:40pm by Select Board Chair Kate Batcheller, attendance 
was taken by roll call as reflected above. 
• Reviewed YTD budget: 
o Line item #4312-05 (Equipment Maintenance) – Need to monitor closely. The backhoe has been 
repaired, the cost was ~$2300. Truck #074 is at A1 now. 
• Dave was asked to organize the quonset hut to determine if it is possible to move Engine 4 here once 
Engine 2 arrives. Also, the fire truck (not owned by the Town), needs to be removed by 9/1/26. 
• A part-time application was reviewed – Dave to call and offer employment. 
• Greenville Rd paving project – Hammering is done, the road is currently open. It will be sporadically 
closed for culvert install. Paving hoping to start late July / early August.  
• Marcel Rd project – To begin once further progress on Greenville Rd is done. 
• There is a pending PA-7 with a planned landing area off Greenville Rd. Dave has been in contact with the 
Forester and the logger and discussed the Greenville Rd paving project. The landing shouldn’t interfere 
with the paving, however, if there are concerns Dave will discuss an alternate landing location with them. 
• A resident inquired about performing work on Scripps Lane. There is currently no project pending. The 
resident is welcome to put in a professional bid for contracted work if and when a project arises. 
• Dave to continue looking for a mower. 
Adjournment: There being no further business, Kate motioned to adjourn, second from Rob. Roll call vote 
Kate-aye, Rob-aye, Antje-absent. Meeting adjourned at 7:28pm. 
 
 
Respectfully Submitted,  
Jennifer Tenney 
BOS Administrative Assistant